{0}------------------------------------------------

{1}------------------------------------------------

{2}------------------------------------------------
![](_page_7_Picture_2.jpeg)

05/12/2025

To Whom It May Concern:

Account Titled in the name Curt Abee, 5489 Old Shelby Rd Vale NC 28168, has fund more than \$150,000 on deposit. Please let me know if I can assist further.

Sincerely,

Natalie P Cook

Hildebran Branch Leader II / Truist

**Assistant Vice President** 

Natale & Col

301 S Center St Hildebran, NC 28367

Mail code: 530-08-01-00

Office: 828-397-5918 / Branch 828-397-3971

Fax: 828-397-4031

NMLS: 1131195

natalie.cook@truist.com
{3}------------------------------------------------
Attachment: 2025 05 12 Curt Abee Proposal\_0001(4795 : BOC - Consideration of Documentation

2025

License No.

32588

# North Carolina

# Licensing Board for General Contractors

This is to Certify That:

Curt R. Abee

Vale, NC

is duly registered and entitled to practice

# General Contracting

Limitation: Limited Classification: Building

until

December 31, 2025

when this Certificate expires.
Witness our hands and seal of the Board.
Dated, Kaleigh, N.C.
01/01/2025

This certificate may not be altered.

![](_page_8_Picture_17.jpeg)

Lhairman

Secretary-Creasurer

![](_page_8_Picture_20.jpeg)
{4}------------------------------------------------
### INNOVATIVE CONTROL SOLUTIONS, INC.

3561 Old Shelby Rd. Hickory, NC 28602

Phone: (828) 446-7702

E-mail: robert@icsunlimited.com

**DATE: 5/12/25** 

ATTENTION: MARSHALLESE CHURCH / PEOPLE

RE: APPARTMENT BUILDING POWER / ELECTRICAL CODE **COMPLIANCE INSTALLATION PROPOSAL** 

SCOPE: BRING EACH OF 8 APPARTMENTS UP TO CODE BY INSTALLING THE BARE MINIMUM ELECTRICAL WIRING.

INCLUDED: 1 - EXHAUST FAN FOR EACH APPARTMENT AND LAUNDRY ROOM, 3 - 4 FOOT SURFACE STRIP LED LIGHTS PER APPARTMENT / BATHROOM, MATERIALS, LABOR AND TAXES. 100 % EXPOSED / SURFACE CONDUIT / MC FLEX INSTALLATION, 1 - 200 TO 400 AMP SERVICE UPGRADE, 1 - 100 AMP BREAKER BOX IN EACH OF THE 8 APPARTMENTS AND 1 LAUNDRY, MINIMAL ELECTRICAL INSTALLATION PER APPARTMENT INCLUDING: 2 - KITCHEN CIRCUITS, 1 - GENERAL LIGHTING CIRCUIT, 1 - GENERAL RECEPTACLE CIRCUIT, 1 - BATH RECEPTACLE CIRCUIT, 1 - HOT WATER CIRCUIT, 1 - SMOKE DETECTOR, 1 - STOVE RECEPTACLE. 1 -LAUNDRY SPACE WITH 3 WASHING MACHINES AND 1 - DRYER ELECTRICAL WIRING. HEATING OUTDOOR UNIT ELECTRICAL / **DISCONNECT / SERVICE OUTLET.** 

NOT INCLUDED: PERMIT FEES, RIGID CONDUIT, FLUSH MOUNTED ELECTRICAL, LAUNDRY CIRCUITRY PER APPARTMENT, ANY EXTERIOR WALL LIGHT FIXTURES, ANY SORT OF FIRE ALARM SYSTEM WIRING, ANY POWER SERVICE WIRING OVER 400 AMPS. OCCUPIED INSTALLATION (OCCUPANT MUST BE REMOVED AND SPACE 100 % CLEANED / CLEARED OF ALL STUFF, WE DO NOT TOUCH/ WORK AROUND OR MOVE OCCUPANTS STUFF! IN THE EVENT OCCUPANTS SPACE IS NOT FULLY CLEANED / CLEARED OUT WORK WILL NOT START UNTIL IT IS!
{5}------------------------------------------------

{6}------------------------------------------------
# Marshallese Electrical Logistics From Start to Finish:

- Swap/upgrade 200 amp to 400 amp service
- Run two 200 amp panels A & B Conduit; hang panel B; pull feeders to Panel B; inspection; hot up Panel B
- Run apartments 5-8 feeder pipes (outside only)
- Move occupants from apartments 7 & 8
- Wire apartments 7 & 8; Minimal demo/Safe OFF; Existing/original conduit/wiring;
   inspections; move occupants back in
- Move occupants from apartments 5 & 6
- Wire apartments 5 & 6; Minimal demo/Safe Off; Existing/original Conduit/wiring;
   inspections; move occupants back in
- Hang panel A; Pipe apartments 100 amp feeder pipes; apartments 1-4 (outside only)
- Pull Panel A feeders; make up Panel A; pipe laundry feeder (exterior only)
- Move occupants of apartments 3 & 4 and Laundry room
- Rework original 200 amp service to be fed by a 100 amp breaker in new 400 amp service. (This will only be feeding apartments 1 & 2)
- Terminate Panel A feeder in 400 amp service
- Wire apartments 3 & 4; minimal demo/Safe OFF; Existing/original Conduit/wiring; inspections; move occupants back in
- Move occupants from apartments 1 & 2
- Wire apartments 1 & 2; minimal demo/Safe OFF; Existing/original Conduit/wiring; inspections; move occupants back in
- Demo existing circuitry from current 200 amp panel in boiler room to ensure no original wiring is hot
- Pipe/wire laundry room
- Complete any final inspections
{7}------------------------------------------------
![](_page_12_Picture_2.jpeg)

| Description                                                           | Quantity | Unit Price | Cost        |
|-----------------------------------------------------------------------|----------|------------|-------------|
| Install single zone low wall mini split<br>heat pumps in 8 apartments |          |            | \$28,800.00 |
|                                                                       |          |            |             |
|                                                                       |          |            |             |
|                                                                       |          |            | \$28,800.00 |
|                                                                       |          | Total      | \$28,800.00 |
{8}------------------------------------------------
# Red Bike Architecture, PLLC

James M. Ratliff, Architect, NCARB

P.O. Box 574, Rutherford College, NC 28671 Phone: 828-413-2276

Email: ratliffarch@outlook.com

# Burke County Building Inspections Attn: Stephen Holden

110 N. Green Street Morganton, NC 28655

Reference: Marshallese New Beginnings Church

8123 George Hildebran School Road Connelly Springs, NC 28612

Pin: 2659351635

Subject: Building Change of Use.

### Mr. Holden

This letter is to certify the Change of Use of the above referenced building from "E" Educational Occupancy to "R-2" Residential Occupancy – Apartments.

I inspected the existing structure on November 17, 2022. See attached Floor Plan and Exterior Elevations Drawing Sheet A-1.

After completing the 2018 North Carolina Building Code Appendix "B" (Building Code Summary) and 2018 North Carolina Existing Building Code Chapter 14 (Performance Compliance Methods), I have determined that the existing "E" Educational Occupancy Building can be used for "R-2" Residential Occupancy — Apartments. See attached Drawing Sheets CS-1 and CS-2.

Any new work/construction to the existing building must meet the applicable North Carolina Building Codes.

The 2018 North Carolina Existing Building Code Chapter 14 requirements must continue to be met. Particular attention must be given to: 1.) The existing one-hour rated masonry wall between each apartment. 2.) Each apartment must be provided with smoke detection and carbon monoxide detection as required by the North Carolina Building Code. 3.) The HVAC systems must be individual systems with no duct work allowed between the units. 4.) Any door access between units must be through rated door openings.

If you have any additional questions or need additional information, please feel free to contact me.

Red Bike Architecture, PLLC

James M. Ratliff, Architect, NCARB

12/14/2022

11661 ERED ARCHITECT PORTS CARD COLLEGE FORTH

Attachments: Drawing Sheets CS-1, CS-2, and A-1.
