{0}------------------------------------------------
Exhibit 2 

We added what was an intended temporary stair but built to code on the rear loading fock entrance of the 1970s addi�on to the structure. In that �me we have realized that this is a wonderful improvement to safety of our workers and delivery drivers who bring stock into the building. The loading dock is always blocaked by vehicals making it even harder to use. We would like to keep this staircase in place. We a�ached with a screws a 2x12 ledger board to the exis�ng treated skirt board of the loading dock. We then used treated 2x12 stringers and a�ached them with simpson joist hangers to the new 2x12 ledger. We then decked the 2x12 stringers with treated 2x6 boards. We mais the handrail posts from treated 4x4 posts and capped them with a treated 2x4. If allowed to leave will fill the gap between the cap rail and the stair rail with ver�cal 2x4's at 4" OC to meet code. All of the wood used is ground contact rated for durability. The style of construc�on matches the exis�ng deck and stair cases on the current entrance and is simply a u�lity entrance in the back of the parking lot. it is only visible once at the exi�ng entrance or if coming down the alley. We will need to wait at least 6 months for the woood to dry out before applying a �nted sealer to match the exis�ng deck and trim on the en�re building. During the renova�on we found a gallon of the sealer used on the exis�ng deck. It is Cabot Brand Solid Color Acrylic Stain and Sealer - Taupe (1800 Series-Solid Color Acrylic Deck, 1808 Medium). Photos are a�ached later in applica�on of the can itself with exact color mixture and photos of the "new stair" and exis�ng stair/deck. 

**65**
