{0}------------------------------------------------
Exhibit 2 

## Presentation  Checklist 

Written  Description  of  the  Proposed  Work:Describe  in  detail  the  scope  and  nature  of  the proposed  project,  including  exact  material  types,  colors,  and  dimensions  for  materials  to  be used  (e.g.,  the  width  of  siding,  the  color  of  window  trim,  type  of  roofing  materials,  etc.). 

## Proposed  Mortar  Joint  Repairs  for  Building  at  605  W.  King  Street,  Boone,  NC 

We  respectfully  submit  our  proposal  to  undertake  essential  repairs  to  the  mortar  joints  on  the west,  south,  and  east  elevations  of  the  historic  structure  located  at  605  W.  King  Street  in Boone,  NC.  These  repairs  are  necessary  due  to  deterioration  of  the  existing  mortar,  which  has led  to  water  infiltration,  mold  development,  and  progressive  damage  to  both  the  exterior brickwork  and  interior  walls. 

The  scope  of  work  includes  repointing  and  tuckpointing  of  the  mortar  joints  in  the  affected areas.  These  repairs  are  limited  to  mortar  restoration  only —no  brick  will  be  removed  or replaced.  The  existing  common  bond  brick  pattern ,  as  well  as  the  current  brick  and  mortar color ,  will  be  preserved  to  maintain  the  building’s  historic  character  and  visual  continuity. 

## Area  of  Repairs: 

- West  Elevation :  A  section  measuring  approximately  40  feet  wide  by  24  feet  high , starting  at  the  roofline  down  along  the  south  end  of  the  wall. 

- South  Elevation :  The  entire  width  of  the  wall  from  the  roof  down  24  feet . 

- East  Elevation :  A  34-foot  wide  section  extending  24  feet  down  from  the  roof  at  the south  corner  of  the  wall. 

## Materials  and  Preservation  Considerations: 

- Mortar :  Masonry  Cement  Type  N,  gray  finish ,  selected  to  match  the  existing  mortar  in color  and  composition  as  closely  as  possible. 

- Sealant :  H&C  ClariShield  Water-Based  Natural  Look  Sealer ,  a  crystal-clear, non-yellowing  protective  finish.  This  product  is  specifically  chosen  for  its  durability  and ability  to  resist  UV  damage  and  weathering ,  thereby  extending  the  life  of  the repaired  masonry  without  altering  its  appearance.  In  addition,  this  sealant  is  a breathable  sealant  which  allows  moisture  trapped  within  masonry  to  escape  preventing the  deterioration  of  brick. 

**114**
{1}------------------------------------------------
We  are  committed  to  carrying  out  this  work  in  a  manner  that  is  sensitive  to  the  historical  integrity of  the  building  while  addressing  pressing  structural  and  environmental  concerns.  These  repairs are  intended  to  stabilize  the  structure,  prevent  further  deterioration ,  and  ensure  the  building remains  a  valuable  and  functional  part  of  the  downtown  Boone  streetscape. 

## Applicable  Design  Standards:Cite  the  applicable  sections  of  the  design  standards  related  to and/or  reflected  in  the  proposed  request. 

Downtown  Boone  Local  Historic  District  Design  Standards --Pages  69-70 

“For  this  reason,  masonry  should  never  be  cleaned  unless  it  is  determined  that  perceived  “dirt” is  actually  accumulated  deposits  and  not  the  effects  of  weathering.  If  cleaning  is  pursued, always  use  the  gentlest  method  available,  preferably  with  lowpressure  water,  a  mild,  non-caustic detergent,  and  a  natural  bristle  brush  where  needed.  In  addition,  while  re-pointing  is  sometimes necessary  when  mortar  is  missing  or  moisture  problems  have  developed,  it  should  only  be completed  in  a  manner  that  avoids  smearing  the  mortar  onto  the  surface  of  the  masonry.” 

4.3  Re-pointing  of  masonry  should  also  be  completed  using  materials  that  duplicate  the  existing mortar  in  appearance,  texture,  and  color.  Colored  sands  or  mineral-pigmented  mortar  can  be used  to  achieve  a  match  with  the  existing  mortar.  Portland  cement  should  be  avoided  in  mortar, as  it  may  produce  a  mortar  that  is  stronger  than  the  surrounding  masonry,  potentially  causing the  masonry  to  crumble. 

- Proposal :  Type  N  masonry  cement,  gray  finish,  will  be  used  as  our  mortar  mix  that meets  ASTM  C91  specifications. 

4.4  Unless  there  is  a  specific  reason  for  using  waterproof  or  water-repellent  coatings  (e.g.,  brick that  has  previously  been  sandblasted,  creating  a  porosity  problem),  these  treatments  should  be avoided,  as  they  can  accelerate  deterioration  of  historic  masonry. 

- Proposal:  Given  the  significant  water  infiltration  observed  within  the  building,  we  believe the  porosity  of  the  masonry  has  been  compromised .  This  may  be  the  result  of several  contributing  factors,  including  repeated  freeze-thaw  cycles ,  original  brick composition ,  prolonged  exposure  to  weather ,  or  insufficient  past  maintenance . 

To  address  this,  we  propose  applying  a  breathable  masonry  sealer  to  the  repaired areas.  Breathable  sealants  are  essential  in  historic  preservation  because  they  allow moisture  vapor  to  escape  from  the  interior  of  the  masonry  while  still  providing  a protective  barrier  against  future  water  intrusion.  This  prevents  damage  such  as cracking,  spalling,  and  efflorescence ,  all  of  which  can  result  from  trapped  moisture  in sealed,  non-breathable  systems. 

The  selected  product— H&C  ClariShield  Water-Based  Natural  Look  Sealer —has  been chosen  for  its  non-yellowing,  UV-resistant,  and  durable  finish ,  as  well  as  its  ability  to preserve  the  visual  integrity  of  the  historic  brickwork.  Its  breathable  formula  is specifically  designed  to  extend  the  life  of  masonry  without  altering  the  original appearance  or  causing  long-term  deterioration. 

**115**
{2}------------------------------------------------
Photographs  of  Existing  Conditions:  Provide  current  photographs  showing  the  present conditions  of  the  area  where  the  work  will  be  completed  and/or  the  portions  of  any  existing building  that  will  be  affected  by  the  proposed  work.  Photographs  must  be  clearly  labeled  and keyed  to  a  site  plan. 

West  Facing 

**116**
{3}------------------------------------------------
## South  Facing 

**117**
{4}------------------------------------------------
East  Facing 

Site  Plan:  For  development  which  includes  modifications  to  the  site  in  addition  to  the  building, the  applicant  shall  provide  scaled  drawings  prepared  in  accordance  with  UDO  Appendix  A, which  depict  at  least  the  relationship  of  all  buildings,  secondary  structures,  driveways, sidewalks,  fences,  drains,  lighting,  and  trees  to  the  property  line.  Clearly  identify  the  location  of any  and  all  proposed  changes.  The  caliper  of  trees  should  be  indicated  as  measured  from  four and  a  half  feet  (4.5’)  above  the  earth’s  surface. 

-Proposal:  This  proposal  involves only  localized  repairs  to  existing  masonry  and  does  not include  any  modifications  to  the  building’s  footprint,  structure,  or  external  features beyond  the  repointing  and  sealing  of  deteriorated  brickwork. Historical  Documentation:  If  available,  provide  copies  of  historic  photographs  of  the  property  in question,  along  with  a  list  of  any  known  previous  alterations  to  the  property  (and  the approximate  date  of  those  alterations).  If  the  property  is  already  listed  on  the  National  Register 

**118**
{5}------------------------------------------------
of  Historic  Places  or  is  a  designated  Local  Historic  Landmark,  include  a  copy  of  the  nomination text  for  the  property. 

**119**
{6}------------------------------------------------
**120**
{7}------------------------------------------------
**121**
{8}------------------------------------------------
**122**
{9}------------------------------------------------
**123**
{10}------------------------------------------------
## Historical  Overview  of  605  W.  King  Street,  Boone,  NC Originally  Constructed:  1922 

The  building  at  605  W.  King  Street  was  originally  constructed  in  1922  as  a two-story  brick commercial  structure  with  a  full  basement .  Over  the  course  of  the  20th  century,  the  building underwent  multiple  modifications—some  minor,  some  substantial—reflecting  changing commercial  needs  and  architectural  trends. 

## 1930s  Modifications 

In  May  1935 ,  under  the  ownership  of  Qualls,  a  new  east-side  entrance  was  created  in  the  alley now  occupied  by  WT0848.  That  same  year,  Qualls subdivided  the  original  ground-level storefronts  into  four  individual  retail  spaces ,  each  with  independent  access.  During  this renovation  period,  a wooden  porch with  a spindled  balustrade  roof  was  added  to  span  the central  section  of  the  building.  This  porch  was removed  by  1949 .  A basement  entrance accessed  via  a  below-grade  concrete  stairwell ,  was  also  added  during  this  era. 

## Mid-Century  Alterations  and  Fire  Damage 

**124**
{11}------------------------------------------------
Sometime prior  to  1947 ,  the west  half  of  the  building was  expanded  southward  with single-story  brick  additions ,  which  extended  beyond  the  depth  of  the  original  east  section. 

On  December  25,  1952 ,  a  fire  severely  damaged  the  structure,  gutting  much  of  the  interior.  In response,  the  building’s  exterior  was  painted  white ,  likely  to  conceal  fire-related  brick  damage. This  alteration  remains  one  of  the  most  visible  historical  transformations. 

## Post-Fire  Construction  and  Façade  Changes 

Photographs  from  the 1950s  and  1960s document  a  substantial  change:  a third  level (effectively  a  second  floor)  was  added  to  the  rear  of  the  west  portion ,  bringing  its  height  in  line with  the  front  elevation.  The east  face  of  this  west  extension is  constructed  in six-course common  bond ,  and  includes  a  decorative  brick  detail  distinguishing  the  basement  level  from the  upper  stories.  This  detail  features  a  repeating  pattern  of soldier  bricks interrupted  by rowlocks ,  forming  a  modified Flemish  bond .  A stepped  parapet is  also  visible  on  this elevation.  One  window  opening  on  this  side  was  subsequently  bricked  in . 

## 1960s–1980s  Façade  Modernization 

By 1965 ,  the  building’s  original  storefront  began  to  undergo  stylistic  changes  reflecting mid-century  trends,  including wood  paneling , cedar  shake  roof  overhangs ,  and  other non-historic  treatments .  The first-floor  brick around  the  storefront  was  covered ,  obscuring much  of  the  original  architectural  fabric. 

A 1988  architectural  survey noted  that  the north  elevation had  largely  retained  its  original second-floor  appearance .  The  brickwork  appeared  in  a running  bond ,  consistent  with  the post-1952  fire  white-painted  treatment. 

## 2019–Present  Rehabilitation 

In 2019 ,  the  current  owner  initiated  a  significant rehabilitation  effort ,  beginning  with  the removal  of  non-original  materials  from  the  north  elevation .  Full  details  of  this  work  were  not recorded. 

## Alterations  to  the  West  Elevation  (Date  Unknown) 

The southern  portion  of  the  west  elevation has  also  seen  substantial  changes  beyond  the third-floor  addition.  This  area  is  now  entirely  clad  in  six-course  common  bond  brick ,  with  no visible  masonry  seam ,  suggesting  a  comprehensive  rework.  The  first  floor  originally  featured three  evenly  spaced  windows ,  all  of  which  have  since  been  altered: 

- The  westernmost  opening  has  been  converted  into  a  metal  door . 

- The  central  window  has  been  completely  bricked  in . 

**125**
{12}------------------------------------------------
●  The  eastern  window  was  partially  infilled ,  with  a  rowlock  sill  and  a  double-hung sash  wooden  window  placed  in  an  awkward  wooden  frame .  A  set  of  crosshatch security  bars  was  added  behind  the  window. 

Reference: 

Comprehensive  Architectural  Survey  of  Downtown  Boone,  North  Carolina  FINAL  REPORT  by Dr.  Eric  W.  Plaag  Pages  145-150 

Local  Historic  Landmark  Nomination  text: 

Recommendation  for  the  Deisgnation  of  the  Downtown  Boone  Local  Historic  District https://www.townofboone.net/DocumentCenter/View/1300/Report-and-Recommendation-for-theDesignation-of-the-Downtown-Boone-Local-Historic-District-Boone-North-Carolina-2020-Revise d-2025 

**==> picture [468 x 55] intentionally omitted <==**

Property  Owner  Authorization:  If  you  are  not  the  property  owner,  you  will  need  to  provide documentation  of  property  owner  authorization  prior  to  permit  issuance.  The  property  owner may  provide  a  written  and  signed  authorization  that  clearly  states  they  are  authorizing  the applicant  to  submit  the  application  that  can  be  uploaded  with  the  application. 

**126**
{13}------------------------------------------------
- Attached 

**127**
