###### **PROJECT NARRATIVE:** 

**TOURISM DEVELOPMENT AUTHORITY 171 Grand Boulevard, Boone NC** 

The Tourism Development Authority (TDA) has purchased the old Legal Aid building on the corner of Grand Boulevard Queen Street for their new office.  Following is a description of the improvements they plan to make to the site: 

###### **Parking:** 

Currently the site has two parking areas.  The first is a horseshoe layout that goes around the back of the building and connects to both Grand Boulevard and Queen Street.  This upper parking lot is an odd shape that includes a random landscaped island in the middle of it as well as an handicap space that only serves the basement level.  We decided to make the parking lot one way with the entrance coming off Grand Boulevard, since it is closer to downtown therefore more welcoming, and the exit onto Queen Street. 

The lower parking lot has historically been rented out to other agencies in downtown but the TDA has no plans to continue this but rather plans to use it for their clients and for Board Meetings when their parking demand is high. 

Both parking lots are in dire need of repaving.  Since they will be repaved, they plan to regrade them both to provide better drainage. 

A new handicap space is proposed off of Queen Street that will be much more accessible to the first floor of the building where their main offices will be located. 

###### **Drainage:** 

Currently there is minimal stormdrainage infrastructure on site.  Both parking lots drain to the south onto adjoining properties (Town of Boone Jones House and the Mast Store/Lost Province parking lot). 

In an attempt to ameliorate this the lower parking lot will be regraded when it is repaved so that it drains out to Queen Street where there is a paved ditch leading to a drop inlet at the corner of Queen and Depot Streets. 

The upper parking lot’s runoff is planned to be directed to a new catch basin and outlet into an innovative level spreader along the southern property line to avoid concentrated flow onto adjacent properties.  In conjunction to this the upper portion of the parking lot is planned to be regraded to sheet flow off into the wooded area to spread out the runoff and increase infiltration. 

###### **Landscaping:** 

Although the project does not trigger the Tier that requires a Landscape Plan and the subject property is zoned B-1 and does not require landscaping the TDA asked us to prepare a landscape plan.  Their goal is a simple design that does not hide the building but rather compliments it.  Following is what we have proposed to meet those goals: 

- We’ve added a red oak on the corner to replace the large tree that was once there. 

**Packet Pg. 15**
{1}------------------------------------------------
- Sourwoods have been shown in reclaimed impervious areas to mark that access points on Queen Street. 

- Since the utilities are located on the north side of the building fronting Queen Street, we’ve added a row of Doghobbles to screen them. 

- Three Kousa Dogwood and one Japanese Maple trees have been added on the perimeter of the upper parking lot to give it some color and shading. 

- We did not want to plant anything that would block the view of the existing rock retaining wall at the entrance off Grand Boulevard in the location of the reclaimed green area so we specified Creeping Juniper. 

- To add color and vegetation to the south side of the lower floor we called out for a mix of Doghobbles and Golden Mop Cyprus. 

###### **Impervious Surfaces:** 

Even with adding the new handicap parking space and sidewalk we were able to reduce the total imperviousness of the property by adding islands in the parking lots where we specified trees be planted.   Also, since we designated one-way traffic in the upper parking lot it allowed us to take out some of the unused impervious surfaces and replace them with landscaping. 

**Packet Pg. 16**