Exhibit 2 

## Application: Certificate of Appropriateness (REVISED) 

Date: November 21, 2023 Project: Portofino Hotel Address: River Street, Boone, North Carolina 

## **RE: COA application for Major Work – New Construction** 

**The following modifications were made to the building since the HPC submittal dated June 24, 2022.** 

## **June 24, 2022 submittal** 

## **November 21, 2023 submittal** 

Two story structure Roof structure height: 20’-0” Building length: 139’-5 1/4” Total heated building area: 11,421 sf Guest rooms (20) Ceiling height: 9’- 0½” Brick color: Red Fenestration: Wood windows with metal cladding (white) Doors: half glass w/ dec panel Cornice: Stacked brick soldier coursing Awning at rear building entrances HVAC: Mini Split units with roof top Condensing units Parapet wall height: 3’-6” 

Two story structure Building height: 21’-1 1/2” Building length: 139’-5 1/4” Total heated building area:12,036 **sf** Guest rooms (20) Ceiling ht: 9’-6” for 1[st] / 2[nd ] floors Brick color: red Fenestration: Wood windows with metal cladding (white) Doors: half glass w/ dec panel Cornice: Stacked brick soldiers Awnings: at rear building entrance HVAC: Mini Split units with roof top condensing units Parapet wall height: 3’-4 ½” 

## **Written Description of Proposed Work** 

Portofino Hotel is a two-story building consisting of (20) guest rooms and miscellaneous ancillary spaces for support of hotel operations. The first-floor heated area contains 6,098 sf which includes (10) guest rooms and miscellaneous ancillary spaces.  A 10’ x 29’ veranda is recessed into the first and second floor along River Street. The second-floor heated floor area contains 5,938 sf which includes (10) guest rooms and miscellaneous ancillary spaces.  A 40” high parapet wall is shown at the roof perimeter to screen roof top HVAC equipment.  Exterior walls will utilize Type III construction consisting of FRT (fire retardant treated) wood stud framing.  Wood I joists will be used for second floor and roof framing.  Tapered roof insulation and a TPO membrane will be installed as the roof system. 

Exterior finish materials consist of a red wire cut brick.  The veranda will be constructed using FRT framing lumber and FRT trim lumber. All exterior wood for the columns, newel post, balusters and rails will be painted white. Brick piers will be installed for column bases.  Double hung wood windows with metal cladding will be used for 

**Packet Pg. 7**
{1}------------------------------------------------
compliance with Type III construction which requires non-combustible materials at exterior wall. Window cladding color will be white. 

Brick veneer around the building includes triple stacked cornice soldier coursing with 1/2” corbeling, 16” wide pilasters extending from grade to top of the parapet wall and a brick soldier course above each window.  The veranda features 12” square wood columns with brick bases.  The veranda balcony railing consists of 8” square newel posts, 2” square balusters and 3” thick top wood rails.  All wood will be painted white. 

The former building on the site had a height of 16’-8” as measured from the roof peak to the average sidewalk elevation.  The height of the proposed new structure is 21’-1 1/4” as measured from the top of the roof structure to the average sidewalk elevation.  The owner requested a 5’-0” building height increase in a CDR which was approved. 

## **Building Design Considerations** 

Building elevations submitted for the COA application dated June 24, 2022 were prepared based upon conceptual floor plans not finished construction drawings. During development of construction drawings, certain changes were made to the interior guest room layouts which affected the number and locations of the exterior windows. The building elevations (6-24-22) utilized both single (3’x 5’) windows and double (3”x 5’) windows in a configuration which reflected the guest room configuration at that time. After further review of the guest room layouts and other design considerations, it was determined that the window configurations needed to be changed as shown in the current building elevations submitted November 21, 2023. 

Regarding the rear building elevation, we are proposing options A and B. 

Option A is the preferred option which replaces certain guest room double windows with a pair of French doors to allows hotel guest to open the doors and have a nice view of the rear yard. Being able to open the French doors will provide hotel guest with a similar experience as having a patio or balcony. Each French door is equipped with a guard rail for safely considerations. The guard rail will be designed in a similar style as the guard rail for the front veranda. 

Option B will utilize double window at each guest room rather that French doors. 

Note: The colored renderings included in the 11-21-23 COA submittal package were prepared for the 6-24-22 submittal and have not been revised to show the latest window configuration. 