{0}------------------------------------------------
###### Town of Boone Historic Preservation Commission (HPC) 

###### Annual Work Plan Report (2023) 



###### **MEETINGS:** 

- Advisory (1<sup>st</sup> Tuesday, 3 pm): met 15 times in 2023 

- Quasi-Judicial (2<sup>nd</sup> Tuesday, 3 pm): met 10 times in 2023 

- Quasi-Judicial: heard 9 cases in 2023, compared to 11 COA cases in 2022. 

- Meetings now held both in-person at the Planning and Inspections Conference Room and via WebEx 

###### **STAFF:** 

- Advisory: Jessica Mitchell, Marlene Crosby/Brenda Henson, Jane Shook (as necessary/required) 

- Quasi-Judicial: Marlene Crosby/Brenda Henson, Michael James, Jane Shook (as necessary/required) 

_Staff Note: Starting sometime in the first quarter of 2024, Brenda Henson will return as the Board Clerk for the HPC as Marlene Crosby is scheduled to retire at the end of March.  Additionally, the meeting tasks associated with scheduling will transfer to Brenda and Michael James, thus eliminating the need for Jessica to have to attend both the advisory and quasi-judicial meetings._ 

###### **FUNDING:** 

|**FY 2023-2024**||
|---|---|
|Boone Cemetery Interpretive Panels:|$3,500*|
|Digital Watauga Historic District Photo Library:|$5,000|
|Annual Digital Watauga Contribution<br>Total:|$5,000<br>$13,500|
|**FY 2024-2025 Request**||
|Board Training|$600|
|Annual Digital Watauga Contribution|$5,000|
|Stoneman’s Raid Interpretative Panel|$3,000**|
|Plus Any Other Item Chosen by Council|?|



Total:  $8,600 

*Staff Note: Staff received an estimate in November 2023 for $3,387, with a projected cost of $100 for Public Works. As Staff works with Vacker Sign, the panel price may be reduced. 

**Staff Note: Staff is working with the Civil War Trails marker program on possible donors.  If successful, the amount needed could be reduced to half. 

###### **STAFF RECOMMENDATION:** 

Staff has relayed to the HPC that Staff’s primary responsibility in the upcoming year will be the work associated with the Comprehensive Plan update. In order to manage Staff time with other responsibilities, and due to the backlog of tasks on the work plan, Staff requests that the HPC be allowed to focus on 

**Packet Pg. 89**
{1}------------------------------------------------
P a g e <u>|</u> **2** 

completing the current in-progress tasks before engaging in any additional tasks with the idea that the work plan be revisited when the in-progress tasks become completed. 

**Packet Pg. 90**
{2}------------------------------------------------
P a g e <u>|</u> **3** 

|Date Assigned|IN-PROGRESS<br>Task|Funding|
|---|---|---|
|ONGOING|**Board Training:**Training necessary to meet CLG status requirements;<br>Staff to seek free to low-cost trainingas much aspossible.|$600|
||**R.L. Clay (Rivers) House Local Historic Landmark Designation:**<br>Completed designation report approved by Council in October 2023;<br>Sent to SHPO for review in December 2023-waiting on SHPO response;<br>Next steps will be to address any SHPO comments and then begin<br>designation through thepublic hearing process.||
||**Jones House  Local Historic Landmark Designation:**Designation report<br>being drafted by former Commission Member Ziegler who will<br>communicate with Staff on report completion.||
||**Boone Cemetery Interpretative Panels:**Council approved text in<br>December 2023.  Staff has begun ordering process.|$3,500*|
||**Stoneman’s Raid Interpretative Panel:**Staff presented request to Town<br>Council in October 2023. Staff can proceed with paperwork, and HPC can<br>consider program requirements for panel text and image in January<br>2024.|$3,000*|
||**Article 8 & Appendix D Revisions:**Modifications to streamline and clarify<br>requirements for the Downtown Boone Local Historic District and other<br>Historic Landmarkproperties||
||**Dana Folk Way project:**Planning Staff coordinating with Downtown<br>Boone Development Coordinator and with other Town departments<br>(Public Works) as needed. HPC to consider interpretative sign text to<br>honor Dana Folk and recognize “Ice House Alley” in January2024.|TBD|
||**Digital Watauga/Downtown Boone Local Historic District Photo Library:**<br>Digital Watauga Staff continues to work on this project and will<br>communicate with PlanningStaff on completion, projected byApril 2024.|$5,000*|
|IN|**Architectural Survey of the Downtown Boone Local Historic District:**<br>Staff continues to work with Dr. Plaag in his research on the project.<br>Staff will print files to deliver to SHPO in the Spring, projected by April<br>2024.<br>-PROGRESS – TO BE COMPLETE(DELAYED TO OTHER ONGOING WORK)||
|Date Assigned|Task|Funding|
||Boone Street Name/Histories project: Reports to be completed for: King<br>Street, Queen Street, Depot Street, Rivers Street, Water Street/Burrell<br>Street; https://townofboone.net/588/Boone-Street-Names-Project||
||Boone Cemetery Survey: NOT COMPLETED as of December 2023. HPC<br>to consider resurveying cemetery, as initial completion date (June 30,<br>2023) was not met. HPC discussed possibility of potential collaboration<br>with ASU.||
||Historic District Light Pole Banners: Staff would coordinate with<br>Downtown Boone Development Coordinator and Public Works on<br>possible implementation. Staff would like permission to create a<br>possible HPC logo to incorporate.|TBD|



**Packet Pg. 91**
{3}------------------------------------------------
P a g e <u>|</u> **4** 

|FUTURE HPC REQUESTED TASKS<br>Gragg House Local Historic Landmark Designation: Project recommended by HPC; If<br>approved, Staff would contact property owner to determine interest in local landmark<br>designation.||
|---|---|
|_Staff Note:_ _Staff would like to ensure all current landmark properties are accounted for the_<br>_in Appendix D revisions/standards before designating additional landmarkproperties._||
|Blair Farm Local Historic Landmark Designation: Project recommended by HPC; If<br>approved, Staff would contact property owner to determine interest in local landmark<br>designation.||
|_Staff Note:_ _Staff would like to ensure all current landmark properties are accounted for the_<br>_in Appendix D revisions/standards before designating additional landmarkproperties._||
|New Historic District Consideration:  Begin comprehensive architectural surveys on the<br>two areas as follows, building on work completed by ASU classes:<br>a. Grand Boulevard (Daniel Boone Park) neighborhood<br>b. Cherry Park (Cherry Dr., Eastbrook, Westbrook, Cherrybrook)||
|_Staff Note_:_Staff would like careful consideration before beginning any new historic district_<br>_planning to ensure future success. Additionally, Staff would suggest engaging with the_<br>_neighborhoods to determine interest prior to beginning designation._||
|Edmisten Cemetery Survey (Dale Street): Possible collaboration with ASU classes, as<br>interested||
|Adams Cemetery Mapping and Survey: Contact property owners of private property<br>cemetery (Adams Cemetery) regarding adding cemetery to existing Cemetery Map and<br>permission to survey||
|Interpretative signs (attached signs) for contributing buildings in the historic district<br>_Staff Note: Staff would like to evaluate the success and cost of the interpretative signs for_<br>_the Dana Folk Way project before deciding on the feasibility of this potential project._|TBD|
|Architectural terms glossary||
|Completed Tasks||
|Task<br>Completion Date||
|Councill’s Store Historic Marker<br>February2023||
|Hayes-Bryan-Greene CemeteryHistoric Marker<br>June 2023||
|Howard Street Boone Street Name Report<br>September 2023||
|Board Training<br>Ongoing||



###### **CERTIFICATE OF APPROPRIATENESS (COA) CASES: Total 9** 

###### 1. Case Z06278-112122 Mast Store 

Certificate of Appropriateness for Major Work requesting to repair the wall on the western facade, which was taken down in 2022 due to public safety reasons, with a hard coat stucco finish.  This request was approved as presented. 

**Packet Pg. 92**
{4}------------------------------------------------
P a g e <u>|</u> **5** 

2. Case Z05737-052522 Wilcox Warehouse – COA – Modification of Previous COA 

Certificate of Appropriateness for Major Work requesting to renovate the facade at 161 Howard Street as a modification of a previously approved COA application because of the deterioration of the brick on the second floor and regarding the previously approved conditions. This request was additional with conditions. 

###### 3. Case Z06492-022423 Southend Brewing Co., LLC 

Certificate of Appropriateness for Major Work requesting to renovate the façade including the front veneer, windows, and sidewalk. This request was approved as presented. 

4. Case Z06555-032323 Watauga County Parking Deck – Modified COA 

Certificate of Appropriateness for Major Work requesting to modify a previously approved COA for Major Work for new construction of a parking structure on Water Street. The modification includes a change in the exterior materials. This request was approved with conditions. 

5. Case Z06553-032323 Southend Brewing Co., LLC – Addition and Patio Improvements 

Certificate of Appropriateness for Major Work requesting an addition and patio improvements on the tertiary elevation at the rear of the property.  The request included the construction/addition of a structure (storage container) to be constructed at the rear of the property and approved the request with no additional conditions. 

###### 6. Case Z06679-052423 Valcore Restaurant 

Certificate of Appropriateness for Major Work requesting to install three (3) windows, on the secondary elevation in existing openings; infill a gated opening and install a new full glass aluminum storefront exit door on the tertiary elevation; and proposed two (2) new openings on the tertiary elevation to accommodate the exhaust and intake ductwork.  The request was approved with conditions. 

_Staff Note: As the Department changed permitting software systems, COA case number has changed styles, as seen in the title of the next case._ 

7. Case A23-0204 Ellison NC 

Certificate of Appropriateness for Major Work requesting to remove the metal awning on the front of the building. The request was approved as presented. 

8. Case A23-0404 Town Hall Façade Renovation 

Certificate of Appropriateness for Major Work requesting to modify the primary facade, including the removal of the existing planter along the brick facade and the addition of two new door to access two new public restrooms. The work was approved as presented. 

###### 9. Case A23-0460 Jones House Picnic Table Area 

Certificate of Appropriates for Major Work requesting to add a concrete sidewalk and pad for a solar picnic shelter to the eastern side of the building. The work was approved as presented. 

**Packet Pg. 93**
