||**SECTION D DETAILS**||||
||||||
||**EMISSION INFORMATION**||||
|**Calculation Method Codes**<br>**(List all that apply)**|**1 = Stack test result**<br>**2 = Material (mass) balance**<br>**3 = EPA approved information (AP-42, CTG, etc.)**<br>**4 =Other (specify intable below)**||||
|**Calculation Rejection Codes**<br>**(List all that apply)**|**1 = Calculation error**<br>**2 = Wrong emission factor(s) used**<br>**3 = Control efficiency(ies) not accepted**<br>**4 =Other (specify intable below)**||||
|**Emission Source (ID No.)**|**Calculation**<br>**Method Code**|**Accept or**<br>**Reject?**|**Calculation**<br>**Rejection Code**|**AB Air Quality**<br>**Calculations**<br>**Attached?**|
|Facility|2, 3,<br>Engineering<br>Estimates|Accept|NA|Yes|



## **EMISSION NOTES** 

Calculations of potential emissions were performed by the facility and reviewed by the Agency. As stated above in the application notes, an error for the emissions associated with EBPVD1 – EBPVD5 was found. This error was carried over from their previous permit modification (Permit 11-920-21B amended March 14, 2024). Further information regarding these emissions calculations can be found in the email saved to the folder for Permit 11-920-21B. 

Emissions for FURNACE1 – FURNACE10 were updated by the facility on the previous permit modification and those calculations were included in the agency calculations. Additionally, emissions for FPI2 are calculated by the agency more conservatively than the estimates provided by Pratt and Whitney. The Agency assumed calculated emissions based on parts per hour for 8760 hours instead of total annual parts. This resulted in a slight increase in VOC emissions. 

Greenhouse gas emissions were changed for this permit review due to a calculation error. 

Estimated actual emissions were provided for this review since the facility has not operated for an entire year. Estimates are based on the facility operating 4160 hours and the emergency engines operating 100 hours.
{1}------------------------------------------------
## **SECTION E** 

**SUPPORTING DOCUMENTATION (Provide brief description of any attachments)** 

1. Permit Application including Modeling Demonstration 

2. Emissions Calculations 

3. Draft Permit 

4. Draft Permit Cover Letter