## Asheville-Buncombe Air Quality Agency Facility Inspection Report 

**==> picture [462 x 340] intentionally omitted <==**

**----- Start of picture text -----**<br>
Facility Inspection Information<br>Facility Name: | Buncombe County Detention Center<br>Date of Inspection: | April 30, 2025 Last Inspected: | May 6, 2024<br>ce<br>Mailing _ | 11 Valley St. Asheville, é .___ | 20 Davidson Drive,<br> Address: NC 28801 Physical Location: Asheville, NC 28801<br>Jordan Angel Phone Number: | 828-774-6433 (c)<br>Contact Email: | jordan.angel@buncombenc.gov<br>|Permit#: | 11-893-17 _|Issued:| July 10, 2017 |Expires:| July 31, 2025<br>Inspector(s): | Allison Glass<br>| Results: | Appears in compliance 9:00AM — 10:30AM<br>Introduction<br>On the above date, a comprehensive inspection was conducted at the Buncombe County<br>Detention Center along with other county buildings. The purpose of this inspection was to<br>determine compliance under the Asheville-Buncombe Air Quality Agency Air Quality Code<br>(ABAQA Code). The Buncombe County Detention Center is a detention facility for inmates. |<br>scheduled this inspection ahead of time with Jordan Angel. Andrew Sawyer was the previous<br>contact and can still be contacted if Mr. Angel is unavailable. The following is a summary of the<br>inspection results:<br>**----- End of picture text -----**<br>


## Safety Equipment / Special Instructions 

Steel-toed shoes and hearing protection are recommended during the inspection. 

## Permitted Equipment 

**==> picture [451 x 150] intentionally omitted <==**

**----- Start of picture text -----**<br>
Equipment ID Hour Reading<br>One (1) 760 kilowatt, diesel-fired<br>ES-1 . Observed —<br>emergency-use generator (Main it BENET 383.9 hours<br>Detention Center). P 6<br>One (1) 500 kilowatt, diesel-fired<br>ES-2 . Observed —<br>emergency-use generator (Jail not operatin 520 hours<br>Addition). perating<br>ES-3 emergency-useOne (1) 125 kilowatt,generatordiesel-fired(County Observed. — 326.2 hours<br>Court House). not operating<br>**----- End of picture text -----**<br>
{1}------------------------------------------------
Buncombe County Detention Center Facility Inspection Report April 30, 2025 

|ES-4|One (1) 450 kilowatt, diesel-fired<br>.<br>emergency-use generator (Life Safety<br>Tower).|Observed—<br>;<br>notoperating|920 hours|
|---|---|---|---|
|ES-5|One (1) 400 kilowatt, diesel-fired<br>a<br>emergency-use generator (Judicial<br>Complex).|Observed—<br>.<br>notoperating|583 hours|
|ES-6|One (1) 175 kilowatt, diesel-fired<br>Observed -<br>emergency-usegenerator(35Woodfin).|notoperating||ne Heures|



The generators are scheduled to run weekly on Tuesdays starting around 0930 hours and 

lasting for about one (1) hour. Mr. Angel was unable to unlock ES-6 to get the hour reading but said that | will be able to see the hours on the last maintenance inspection that was performed. 

## Exempt Sources: 

## Main Detention Center 

|Equipment <br>1|ID|One(1)93horsepower, diesel-fired<br>emergency-use firepump (Detroit<br>DieselModelDDPF-03 DT5068F).|Hisenud—<br>nik eoaratin<br>P<br>8|Hisenud—<br>nik eoaratin<br>P<br>8|Hour Reading<br>54hours|
|---|---|---|---|---|---|
|||Two (2) 6.30 million BTU per hour,|Observed —|||
|2||natural gas-fired boilers (Mohawk|one||N/A|
|||ModelAT-4-5-751).|operating|||
|||Two (2) 0.18 million BTU per hour,|No longer|||
|3||natural gas-fired clothes dryers (Cissell|there -||N/A|
|||Model L44CD426)|replaced|||
|||One (1) 0.25 million BTU per hour,|No longer|||
|4||natural gas-fired clothes dryer (Cissell|there -||N/A|
|||ModelHD1106)|replaced|||



The two 0.18 million BTU per hour dryers and the 0.25 million BTU per hour dryer have 

been replaced by 4 Dexter T-50X2 dryers, there are 2 dryers per unit totaling 8 dryers. Specifications are as follows: 8 gas input (per dryer — 60 hz) 0.108 million BTU per hour, 114MJ/hr (31.7 kW).
{2}------------------------------------------------
Buncombe County Detention Center Facility Inspection Report April 30, 2025 

## Jail Addition 

|Equipment ID|||
|---|---|---|
|5|Two (2) 1.00 million BTU per hour, natural gas-<br>firedwaterheaters(PowerFinbyLochinvan<br>Model PFN1001PM)|ennaRet<br>perenne|
||Two (2) 1.00 million BTU per hour, natural gas-<br>fired boilers(PowerFinbyLochinvanModel<br>PFN1001)|anne aoe<br>perating|
|Allport Building|||
|Equipment ID|||
|7|Two (2)0.399 million BTU perhour, naturalgas-<br>fired boilers (Aerco Esteem 399).|Observed -<br>operating|
||One (1)50kilowatt, diesel-firedemergency-use<br>generator (Generac).|Nolongerthere|
||One (1) 100-gallon,sub-base dieselfuelstorage<br>tank.|No longer there|



## Allport Building 

Mr. Angel stated that the 50-kilowatt generator and the 100-gallon storage tank have not been 

there in a while. 

## County Court House 

|Equipment|ID|||
|---|---|---|---|
|10||Two (2)4.032 million BTU perhour, naturalgas-<br>fired boilers (Weil-McLain)|Observed—not<br>operating|
|11||One (1)500-gallonabovegrounddiesel fuel<br>storagetank|Observed|



## Life Safety Tower 

**==> picture [451 x 41] intentionally omitted <==**

**----- Start of picture text -----**<br>
Equipment ID<br>42 One (1) 5,000-gallon aboveground diesel fuel Not observed —<br>storage tank located under ES-5<br>**----- End of picture text -----**<br>


3|Page
{3}------------------------------------------------
Buncombe County Detention Center Facility Inspection Report April 30, 2025 

## Judicial Complex 

**==> picture [338 x 39] intentionally omitted <==**

**----- Start of picture text -----**<br>
Equipment ID<br>One (1) 1,550-gallon, sub-base diesel fuel storage<br>tank<br>**----- End of picture text -----**<br>


200 College Street (BC Administration) 

**==> picture [439 x 49] intentionally omitted <==**

**----- Start of picture text -----**<br>
Equipment ID<br>Two (2) 1.350 million BTU per hour, natural gas-<br>= fired boilers (RBI Dominator) NOT OOESTRY<br>**----- End of picture text -----**<br>


35 Woodfin Street (William H. Stanley Center) 

**==> picture [451 x 192] intentionally omitted <==**

**----- Start of picture text -----**<br>
Equipment ID<br>Two (2) 2.50 million BTU per hour, natural gas-fired<br>15 boilers (Harsco Industrial Patterson-Kelley P-K nnn cs<br>Thermific Model N2500-MFD) perating<br>16 One (1) 1650-gallon, sub-base diesel fuel storage Not Observed -<br>tank located under ES-6<br>Interchange Building<br>Equipment ID Hour Reading<br>One (1) 125 kilowatt, natural gas-fired<br>17 emergency-use generator (Olympian Observed 5,144 hours<br>Model No. G125G1).<br>**----- End of picture text -----**<br>


Interchange Building 

The generator was locked, and Mr. Angel did not have a key with him. He said he will send me the hour reading via email.
{4}------------------------------------------------
Buncombe County Detention Center Facility Inspection Report April 30, 2025 

## Permit Conditions: 

The following does not represent all permitted conditions, only the permit conditions that are directly relevant to the inspection. For all the conditions, please review permit. 

- e A.7-This condition requires that the permittee maintain and operate the facility at all times so that the overall reduction in air pollutants, in accordance with applicable standards, is achieved. The facility has developed a maintenance schedule for equipment and is maintaining records of all maintenance. The facility has established standard operating procedures for equipment and is training equipment operators on the procedures. 

- e A.8—-This condition requires that the facility notify the Agency in the event of a malfunction. The facility has not experienced any malfunctions during the reporting period. 

- e A.11-This condition requires that the facility pay their annual permit fee on a timely basis. The facility is up to date on fee payments. The facility last submitted their fee payment on August 27, 2024, and will get invoiced in July of this year with their permit renewal. 

- e A.12-The facility is required to submit a permit renewal request no later than ninety (90) days prior to permit expiration. The permit is set to expire on July 31, 2025, so the permit renewal application is due by May 2, 2025. The facility submitted their request on April 16, 2025. 

- e A.14-This condition requires the facility retain a copy of the permit on the premises. The facility had a copy of their current operating permit on-site. 

- e 8B.2-This condition states the facility shall be operated to prevent odorous emissions from being emitted beyond the boundary of the facility. The facility did not produce any odorous emissions during the inspection. 

- e 8B.3-This condition limits the facility's visible emissions to 20% opacity averaged over a six-minute period. During the inspection, the facility exhibited an opacity of 0%.
{5}------------------------------------------------
Buncombe County Detention Center Facility Inspection Report April 30, 2025 

- e B.4-This condition establishes the facility’s sulfur dioxide emission limit of 2.3 lbs per million BTU input resulting from combustion sources. The AP-42 SO2 emission factor for (small and large) diesel engines is 0.51 Ib/MMBtu based on 0.5% fuel sulfur content and therefore compliance is expected so long as the facility uses fuel with a sulfur content equal to or less than 0.5%. 

- e B.5-—This condition states that equipment ID’s ES-1, ES-2, ES-3, ES-4, ES-5, ES-6 shall be operated in accordance with ABAQA Code 4.1111 and NESHAP 40 CFR 63. The requirements are stated in 40 CFR 63 Subpart ZZZZ. ES-1 and ES-2 are exempt from the requirements of 40 CFR 63 subpart ZZZZ as long as they meet the definition of institutional emergency RICE. Emergency generators ES-3, ES-4, ES-5 and ES-6 are subject to 40 CFR Part 60 Subpart IIII, these requirements include the use of ULSD and limit operation for maintenance checks and readiness testing to 100 hours per year. However, the 100-hour limit may be exceeded if the tests are required by Federal, State, or local standards, or by petitioning EPA. Emergency stationary RICE located at area sources of HAP (which is the case for ES-1 and ES-2) may be operated for up to 50 hours per calendar year in non-emergency situations. The 50 hours of operation in non-emergency situations are counted as part of the 100 hours per calendar year for maintenance and testing. The 50 hours per year for non-emergency situations cannot be used for peak shaving, or to generate income for a facility to an electric grid or otherwise supply power as part of a financial arrangement with another entity, except the 50 hours per year for non-emergency situations can be used to supply power as part of a financial arrangement with another entity if certain conditions are met as specified in the permit. Service records were provided to the inspector over a month after the conclusion of the inspection, thus resulting in a NOD. The service dates are as follows: ES-1 was serviced on June 5, 2025; ES-2 was serviced on April 22, 2025; ES-3 was serviced on May 27, 2025; ES-4 was serviced on April 22, 2025; ES-5 was serviced on March 7, 2025, and ES-6 was serviced on March 19, 2025.
{6}------------------------------------------------
Buncombe County Detention Center Facility Inspection Report April 30, 2025 

- e 8B.6-—This condition states that equipment ID’s ES-3, ES-4. ES-5. ES-6 are subject to NSPS subpart III (40 CFR 60.4200 to 60.4219). The facility is following all NSPS Subpart I11l requirements for equipment ID’s ES-3, ES-4, ES-5, ES-6 including: a. using manufacturer certified engines; b. using diesel fuel with a sulfur content less than 15ppm; c. operating and maintaining the engines according to manufacturer specifications; d. ensuring all engines are equip with a non-resettable hour meter; e. operating the engine for emergency situations, maintenance and testing, and other exempted non-emergency operations within the subpart’s limits not exceeding 100 hours per calendar year per generator for testing and maintenance and 50 hours per year, per generator of non-emergency use, which counts towards the 100 hours for testing and maintenance; and f. maintaining records of engine operation both emergency, and non-emergency. The facility maintains records of generator hours, and no generator has operated over the 100-hour non-emergency limit. 

- e B.7-This condition states that the facility has triggered a toxics review, and has been found to be in compliance with AB Air Quality Code 17.0700 by accepting the following limitations: ES-1 and ES-2 shall each operate no more than 290 nonemergency hours during any consecutive 12-month period. Condition B.5 limits the non-emergency hours for ES-1 and ES-2 to 100 hours. See Condition B.8 for generator run times. 

- e B.8—This condition states that the facility is required to submit reports if nonemergency use exceeds 100 hours for any unit during a calendar year. Additionally, the facility is required to submit annual reports for fuel use and the hours of operation of the generators. The most recent annual report was submitted via email on January 31, 2025, and contained all the required information. The total hours for 2024 are as follows: ES-1 operated for 44 hours; ES-2 operated for 37 hours; ES-3 operated for 33 hours; ES-4 operated for 109 hours, ES-5 operated for 88 hours; and ES-6 operated for 56 hours. The emergency generators ran more than usual in 2024 due to Hurricane Helene. In 2022, ES-3 was found to have a faulty hour meter, this was an ongoing issue until 

7|Page
{7}------------------------------------------------
Buncombe County Detention Center Facility Inspection Report April 30, 2025 

2024. ABAQA received communication from Brian Chandler that the hour meter was 

repaired. No issues were seen during this inspection. 

## Compliance History: 

A NOD was issued to the facility on June 3, 2025, for not providing the maintenance records for the permitted equipment in a timely manner. The inspection took place April 30, 2025, and all maintenance reports were not received until June 11, 2025. No further action will be taken. 

## Conclusion: 

Based on the above information, Buncombe County Detention Center appears to be in compliance with all applicable regulations of the ABAQA Code and all applicable NSPS and NESHAP regulations after submitting the required maintenance records on June 11, 2025. It is recommended that this permit be renewed. 

**==> picture [434 x 89] intentionally omitted <==**

**----- Start of picture text -----**<br>
Signature: 7 VA C Se life. Date: LILI a 5<br>Reviewer Signature: : —,, Date: 7/4 “25<br>Director Signature: Date: 7/5/25<br>**----- End of picture text -----**<br>