{0}------------------------------------------------
## **SECTION B DETAILS** 

## **APPLICATION INFORMATION** 

**[List all emission sources (permitted and exempt) reviewed as a result of this application, their associated control devices and pollutants.  Provide a detailed discussion of any other items in Section B at bottom under “Application Notes”]** 

|**Emission**<br>**Source ID**|**Emission Source Description**<br>**1.**<br>**Type, manufacturer, capacity**<br>**2.**<br>**Control device with ID(ifany)**|**Pollutant(s)**<br>**Emitted**|**Miscellaneous Notes**|
|---|---|---|---|
|AC1|AirBurners Firebox S119 Air<br>Curtain Incinerator|PM, PM-10, PM-<br>2.5, CO, SO2,<br>NOx, VOC,<br>CO2e|Maximum charge rate of 5 tons<br>per hour. Manufactured in April of<br>2025. Powered by a 74<br>Horsepower EPA Tier 4 rated<br>engine.|



## **APPLICATION NOTES** 

The application fee was receive with the application on September 30, 2025. Facility emailed Buncombe County Planning Department on September 23, 2025 asking for a zoning consistency determination. The Agency has not received a zoning consistency determination from Buncombe County planning, but fifteen days have elapsed since the email and therefore fulfills the requirement that the zoning authority is notified. Specific Condition 2.E states that the permittee is required to comply with all lawfully adopted local ordinances, and that the local zoning authority is responsible for enforcing those ordinances.
