{0}------------------------------------------------
**ZPH2025-00XXX VERSION 2** 

**02-03-2026** 

## ~~**Strikethrough**~~ **– deletions** 

**Additions** 

## **ARTICLE II. - FLOOD DAMAGE PREVENTION[[2] ]** 

## **DIVISION 1. - GENERALLY** 

## 

_**Conveyance shadow**_ **means an area upstream of or downstream of an existing obstruction to** 

_**Repetitive Loss**_ **means a building has submitted and received two or more separate claim payments where the total exceeds the property’s value, or has had four or more claims of $5,000 or more since 1978.** 

**“Letter of Map Change (LOMC)” means an official determination issued by FEMA that amends or revises an effective Flood Insurance Rate Map or Flood Insurance Study.  Letters of Map Change include:** 

- (a) Letter of Map Amendment (LOMA): An official amendment, by letter, to an effective National Flood Insurance Program map.  A LOMA is based on technical data showing that a property had been inadvertently mapped as being in the floodplain, but is actually on natural high ground above the base flood elevation. A LOMA amends the current effective Flood Insurance Rate Map and establishes that a specific property, portion of a property, or structure is not located in a special flood hazard area. 

- (b) Letter of Map Revision (LOMR): A revision based on technical data that may show changes to flood zones, flood elevations, special flood hazard area boundaries and floodway delineations, and other planimetric features. 

- (c) Letter of Map Revision Based on Fill (LOMR-F): A determination that a structure or parcel of land has been elevated by fill above the BFE and is, therefore, no longer located within the special flood hazard area. In order to qualify for this determination, the fill must have been permitted and placed in accordance with the community’s floodplain management
{1}------------------------------------------------
regulations. **Elevation of the impacted area.** 

- (d) Conditional Letter of Map Revision (CLOMR):  A formal review and comment as to whether a proposed project complies with the minimum NFIP requirements for such projects with respect to delineation of special flood hazard areas.  A CLOMR does not revise the effective Flood Insurance Rate Map or Flood Insurance Study; upon submission and approval of certified as-built documentation, a Letter of Map Revision may be issued by FEMA to revise the effective FIRM. 

“Substantial Improvement ” means any combination of repairs, reconstruction, rehabilitation, addition, or other improvement of a structure, taking place during any one-year period for which the cost equals or exceeds 50 percent of the market value of the structure before the “start of construction” of the improvement. This term includes structures which have incurred “substantial damage”, regardless of the actual repair work performed. The term does not, however, include either: 

(a) any correction of existing violations of State or community health, sanitary, or safety code specifications which have been identified by the community code enforcement official and which are the minimum necessary to assure safe living conditions; or 

(b) any alteration of a historic structure, provided that the alteration will not preclude the structure's continued designation as a historic structure. ~~**His**~~ **toric structures must adhere to the variance procedure.** 

## ~~**DIV**~~ **ISION 3. - PROVISIONS FOR FLOOD HAZARD REDUCTION** 

## **Sec. 34-66. - General standards.** 

adequately anchored to prevent flotation, collapse, or lateral movement of the structure. 

(2) All new construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage. 

(3) All new construction and substantial improvements shall be constructed by methods and practices that minimize flood damage. 

(4) Electrical, heating, ventilation, plumbing, air conditioning equipment, and other service facilities shall be designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding to the regulatory flood protection elevation.
{2}------------------------------------------------
ductwork, electric/gas meter panels/boxes, utility/cable boxes, hot water heaters, and electric outlets/switches. 

(5) All new and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the system. 

(6) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems and discharges from the systems into flood waters. 

(7) On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding. 

(8) Any alteration, repair, reconstruction, or improvements to a structure, which is in compliance with the provisions of this article, shall meet the requirements of "new construction" as contained in this article. 

(9) Nothing in this article shall prevent the repair, reconstruction, or replacement of a building or structure existing on the effective date of this article and located totally or partially within the floodway, non-encroachment area, or stream setback, provided there is no additional encroachment below the regulatory flood protection elevation in the floodway, nonencroachment area, or stream setback, and provided that such repair, reconstruction, or replacement meets all of the other requirements of this article. 

(10) New solid waste disposal facilities and sites, hazardous waste management facilities, salvage yards, and chemical storage facilities shall not be permitted, except by variance as specified in subsection 34-55(i). A structure or tank for chemical or fuel storage incidental to an allowed use or to the operation of a water treatment plant or wastewater treatment facility may be located in a special flood hazard area only if the structure or tank is either elevated or floodproofed to at least the regulatory flood protection elevation and certified in accordance with the provisions of subsection 34-52(c). 

(11) All subdivision proposals and other development proposals shall be consistent with the need to minimize flood damage. 

(12) All subdivision proposals and other development proposals shall have public utilities and facilities such as sewer, gas, electrical, and water systems located and constructed to minimize flood damage. 

(13) All subdivision proposals and other development proposals shall have adequate drainage provided to reduce exposure to flood hazards.
{3}------------------------------------------------
(14) All subdivision proposals and other development proposals shall have received all necessary permits from those governmental agencies for which approval is required by federal or state law, including Section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1334. 

meet the requirements for new construction and substantial improvements. 

multiple base flood elevations, the provisions for the more restrictive flood hazard risk zone and the highest base flood elevation shall apply. 

**(17) No new development shall take place within a conveyance shadow.** 

## **SECTION B. SPECIFIC STANDARDS.** 

(7) ~~Tem~~ porary ~~**Non-Residential**~~ Structures **and Materials** . development permit for a temporary structure, the applicant must submit to the Floodplain Administrator a plan for the removal of such structure(s) in the event of a hurricane, flash flood or other type of flood warning notification. The following information shall be submitted in writing to the Floodplain Administrator for review and written approval: 

exceed three (3) months, renewable up to one (1) year; 

(b) the name, address, and phone number of the individual responsible for the removal of the temporary structure; 

(c) the time frame prior to the event at which a structure will be removed (i.e., minimum of 72 hours before landfall of a hurricane or immediately upon flood warning notification); 

(d) a copy of the contract or other suitable instrument with the entity responsible for physical removal of the structure; and 

(e) designation, accompanied by documentation, of a location outside the Special Flood Hazard Area, to which the temporary structure will be moved.
{4}------------------------------------------------
## **Sec. 34-70. - Floodways and non-encroachment areas.** 

hazard areas established in section 34-32 . The floodways and non-encroachment areas are extremely hazardous areas due to the velocity of floodwaters that have erosion potential and carry debris and potential projectiles. The following provisions, in addition to standards outlined in sections 34-66 and 34-67, shall apply to all development within such areas: 

developments shall be permitted unless: 

levels during the occurrence of the base flood, based on hydrologic and hydraulic analyses performed in accordance with standard engineering practice and presented to the floodplain administrator prior to issuance of floodplain development permit; or 

b. A conditional letter of map revision (CLOMR) has been approved by FEMA. A letter of map revision (LOMR) must also be obtained upon completion of the proposed encroachment. 

(2) If subsection 34-70( hazard reduction provisions of this article. 

(3) No new manufactured homes shall be permitted. Replacement manufactured homes in an existing manufactured home park or subdivision may be permitted, provided the following provisions are met: 

a. The anchoring and the elevation standards of subsection 34-67(3); and 

b. The no encroachment standard of subsection 34-70(1). 

(4) No new habitable structures, including structures used for working, sleeping, living, cooking, or restroom facilities, shall be permitted in floodways and non-encroachment areas. 

**(5) No new travel trailers or travel trailer parks will be permitted to encroach into the floodway and non-encroachment areas.** 

(Res. No. 09-11-02, § 3(Art. 5, § F), 11-3-09) 

**sheds, shall be permitted in floodways and non-encroachment areas.** 

**(7) No temporary storage of junked vehicles or mechanized equipment shall be permitted in floodways and non-encroachment areas.**
