# **- CDBG DR Community Infrastructure Public Hearing** 

**==> picture [960 x 124] intentionally omitted <==**
{1}------------------------------------------------
## **Community Infrastructure** 

- **Total Funding Available** : $192M 

- **Funding in First Round:** $55M 

- **Max Award** : $15M 

- **Eligible Applicants** 

   - Local Governments 

- No grant match required 

- All “Most Impacted and Distressed” areas (MIDs) are eligible 

## **Program Focus for First Round of Funding** 

- Shovel Ready Projects 

- Projects that address unmet disaster needs 

   - Restoring access to essential services 

   - Repairing critical infrastructure 

   - Strengthening community resilience 

- Priorities for First Round of funding: 

   - Water and Sewer (10 points) 

   - Parks and Recreation Facilities (7 points) 

   - Roads and Bridges (4 points) 

## • **Ineligible** project examples: 

- Emergency Operation Centers 

- Vehicles, non-permanently installed equipment, and routine maintenance 

- • Projects located in Buncombe County that are also located within the City of Asheville 

**==> picture [960 x 124] intentionally omitted <==**
{2}------------------------------------------------
## **Community Infrastructure – Project Eligibility** 

_In order to be eligible, projects must meet three criteria:_ 

**Tie-Back to the Storm** 

_Clear and documented connection between the proposed activity and the_ : _impacts of the disaster_ - Physical damage - Economic damage - Vulnerability revealed or exacerbated by TS Helene - Miti ation needs g 

**HUD National Objective Eligible Activity Under Action Plan** 

_Identified HUD-eligible activities in the Action Plan. The Community Infrastructure program prioritizes:_ 

- Low- to moderateincome benefit (primary) - Urgent Need (secondary) - Eliminating slum and blight (secondary) 

- Physical recovery from storm damage in commercial areas - Mitigation activities 

Staff will consider alignment with Helene Recovery Plan and community feedback for other planning processes (Swannanoa SAP, Ped Plan, etc.) while developing potential projects. 

3
{3}------------------------------------------------
# **Potential Projects** 

**==> picture [960 x 124] intentionally omitted <==**
{4}------------------------------------------------
## **Buncombe County Parks Recovery & Resilience** 

- Goal: Rebuild Buncombe County Parks damaged by Hurricane Helene (Owen, Alexander, Lake Julian, etc.) to restore park services to preHelene levels and mitigate against future disasters; repairs will be made in alignment with future mitigation needs and community vision. 

- Unmet Needs 

   - Insufficient funding to complete repairs to Park System 

   - Park Services have not yet been fully restored 

## • Deliverables 

- Restore and reconstruct critical park infrastructure damaged by Hurricane Helene 

- Rebuild park facilities and recreational amenities 

- Implement flood mitigation and ecological restoration measures 

- Enhance long-term resilience and accessibility 

## • Project Status 

- Pre-screening submitted to the State 

5
{5}------------------------------------------------
- **Ferry Road Infrastructure to Enable Affordable Housing** 

- • Goal: Build and improve essential infrastructure that will enable the development of affordable housing on the Ferry Road Affordable Housing Community site. 

## • Unmet Needs 

- Hurricane Helene damaged and destroyed 6,505 units of rental housing in Buncombe County, to date there has been insufficient funding to repair and replace rental units, deepening our existing affordability crisis. 

- The Ferry Road site lacks the infrastructure necessary to construct replacement rental units. 

## • Deliverables 

- Construct 0.65 miles of access road 

- Repair existing Ferry and Dry Ferry Roads 

- Build infrastructure to enable affordable housing development 

## • Project Status 

- Pre-screening submitted to the State 

6
{6}------------------------------------------------
- **Community Resilience at CountyOwned Facilities** 

- • Goal: Provide comprehensive permanent power redundancy system for the county's critical facilities. 

- Unmet Needs: 

   - During the response period following the storm, our community lacked sufficient locations where residents could receive critical services 

   - Facility upgrades are needed to improve existing county facilities, provide critical services, and mitigate against future events 

- Deliverables: Generators, controllers and battery energy storage systems at the county’s critical facilities. 

- Project Status 

   - Pre-screening submitted to the State 

7
{7}------------------------------------------------
## **DISCUSSION** 

8
{8}------------------------------------------------
## **Buncombe County Community Infrastructure Pro ect Idea Summar j y** 

|**Project Concept**|**Tie-Back to the**<br>**Storm**|**National**<br>**Objective**|**Eligible Activity**|
|---|---|---|---|
|Buncombe County<br>Parks Recovery &<br>Resilience|Physical damage to<br>Parks|Urgent Need|Yes, restores access<br>to services and<br>meets priority for<br>repair of public<br>parks|
|Ferry Road<br>Infrastructure to<br>Enable Affordable<br>Housing|Damaged and<br>destroyed renter-<br>occupied units|Benefit to low- to<br>moderate-income<br>clientele|Yes, physical<br>improvement and<br>road infrastructure<br>to enable affordable<br>housing|
|Sustainability<br>Project|Improvements to<br>essential facilities<br>and mitigation for<br>future events|Urgent Need|Yes, physical<br>improvements to<br>critical infrastructure<br>and mitigation for<br>future events|



9
{9}------------------------------------------------
## **Timeline and Next Steps** 

August Septembe 28[th] , r 16[th] , Public Applicatio Comment n Closes Deadline 

July 31[st] , Public Comment Opened 

July 6[th] , NOFO opened 

**==> picture [43 x 44] intentionally omitted <==**

**==> picture [44 x 44] intentionally omitted <==**

**==> picture [44 x 44] intentionally omitted <==**

**==> picture [44 x 44] intentionally omitted <==**

**==> picture [44 x 44] intentionally omitted <==**

**==> picture [44 x 44] intentionally omitted <==**

**==> picture [44 x 44] intentionally omitted <==**

**September 1st, Request Board Authorization to Submit Applications** 

July 21st, Commissio n’s Briefing 

**August 18[th] , Public Hearing** 

**==> picture [960 x 124] intentionally omitted <==**
{10}------------------------------------------------
## **Public Comment Details** 

## Options for Submitting Public Comment: 

- Written Comments, direct to: Buncombe County Helene Recovery Office 200 College St, Asheville NC 28801 

- Email Comments to: HeleneRecovery@BuncombeNC.gov 

- Call the Recovery Office at: 828-250-6100 

Please include “Community Infrastructure Comment” when submitting comment through any of the above methods. 

## **Public Comment will conclude on Friday, August 28[th.]**
{11}------------------------------------------------
## **Questions?** 

12
{12}------------------------------------------------
## **Request for Board Action** 

Requested Board Action: Hold a public hearing in accordance with the Citizen Participation Plan for the Community Development Block Grant – Disaster Recovery (CDBG-DR) Community Infrastructure grant application process. 

**==> picture [960 x 124] intentionally omitted <==**
{13}------------------------------------------------
## **APPENDIX** 

14
{14}------------------------------------------------
## **Overview: CDBG-DR Basics** 

- CDBG-DR: appropriated by Congress and allocated by HUD to rebuild disaster-impacted areas by funding **housing, infrastructure,** and **economic revitalization** activities 

- Uses of CDBG-DR funds must meet three basic criteria: _**1. Tie-back to the Disaster**_ by addressing a direct or indirect impact _**2. Meet a CDBG National Objective**_ : Benefit LMI persons, prevent or eliminate slums/blight, or address an urgent need 

      - 70% of DR funds must benefit LMI persons 

   _**3. Eligible Use**_ under section 105 of the Housing and Community Development act or be allowed by waiver 

- Funds must benefit the areas **Most Impacted and Distressed (MID)** 

   - 80% of funds must be spent in HUD-identified MIDs 

   - Further defined in the Action Plans 

- “Funding of last resort”: projects require duplication of benefit analysis 

   - Funds can benefit FEMA-PA or HMGP projects OR “stand alone” unmet needs 

15
{15}------------------------------------------------
## **Overview: CDBG-DR Process** 

- Funding Recipients must publish detailed documents and engage communities in order to justify expenditure of funds: 1. Action Plan 

   2. Programs & Policies 

   3. Notice of Funding Opportunity 

- Recipients can manage funds by: **1. Managing programs** (ex: DCR’s RenewNC Single Family program) 2. Awarding funds to **subrecipients** to manage activities (ex: the city of Asheville’s Small Business Support Program) 

- 3. Awarding through **competitive NOFOs** (ex: COA’s Multi-Family NOFO, the upcoming State CI and CDR opportunities) 

16
{16}------------------------------------------------
## **North Carolina Competitive Grant Pro ram Timeline g** 

||**Action**<br>**Plan**|**Policies**<br>**and**<br>**Procedures**|**_Pre-_**<br>**_Screening_**|**Notice of**<br>**Funding**<br>**Opportunity #1**|**Notice of**<br>**Funding**<br>**Opportunity #2**|
|---|---|---|---|---|---|
|**Multi-Family**<br>**Housing Large**<br>**Construction**<br>**(LIHTC)**|Completed|Completed|_N/A_|N/A*|N/A|
|**Multi-Family**<br>**Housing Large**<br>**Construction (non-**<br>**LIHTC)**|Completed|Completed|_Open_|Opened June 25th|N/A|
|**Community**<br>**Infrastructure**|Completed|Completed|_Open_|Opened July 6th|Anticipated Fall<br>2026|
|**Commercial**<br>**District**<br>**Revitalization**|Completed|Completed|_Open_|Opened on April 6th|Anticipated Fall<br>2026|



*The State is working with NCHFA to manage the funding for “Large” projects (LIHTC). 

17