## **INDOOR RECREATION CENTER DESIGN** 

Ronnie Lunsford General Services 

**==> picture [960 x 124] intentionally omitted <==**

**----- Start of picture text -----**<br>
8/12/2026<br>**----- End of picture text -----**<br>
{1}------------------------------------------------
## **Project Background** 

**==> picture [218 x 146] intentionally omitted <==**

**----- Start of picture text -----**<br>
Comprehensive<br>Facility Plan<br>**----- End of picture text -----**<br>


Indoor Recreation Center 

**==> picture [218 x 146] intentionally omitted <==**

**----- Start of picture text -----**<br>
Parks and Rec<br>Master Plan<br>**----- End of picture text -----**<br>


- The Comprehensive Facility Plan (CFP) led to a need for office space for Parks and Recreation, located on County owned property at the Buncombe County Sports Park. 

- The Parks and Recreation Master Plan led to a need for indoor recreation space. 

- A project to design a dual-purpose facility was requested and approved as part of the FY27 Capital Improvement Plan. 

**==> picture [46 x 46] intentionally omitted <==**
{2}------------------------------------------------
## **Original Project Location** 

**==> picture [586 x 350] intentionally omitted <==**

• **CFP recommendation for location** 

- **Former site of General Services grounds facility** 

- **This would limit parking for recreational use** 

- **Possibly inaccessible during major flood events** 

**==> picture [46 x 46] intentionally omitted <==**
{3}------------------------------------------------
## **Current Project Location** 

**==> picture [586 x 350] intentionally omitted <==**

• **Allows easier access to the facility** 

- **Allows for additional entrances and/or exits at the Sports Park** 

- **Will preserve some of the existing amenities at the dog park and community garden** 

**==> picture [46 x 46] intentionally omitted <==**
{4}------------------------------------------------
## **Former Sand Hill School** 

**==> picture [586 x 350] intentionally omitted <==**

- **Facility was located on the site (photo from 2006)** 

- **Demolished in 2007/2008-time frame** 

- **Separate access road and parking was in place** 

**==> picture [46 x 46] intentionally omitted <==**
{5}------------------------------------------------
## **Key Features** 

- Indoor Recreation Space – Basketball/Volleyball Courts `o` Open, Flexible Spaces for Multiple Purposes (Community Events, Polling Locations, Operations During Emergencies, etc.) 

- Spectator Seating 

- Changing/Locker Rooms 

- Catering Kitchen 

- Parks and Recreation Office Space 

- Conference/Meeting Rooms 

- Additional Entrances and/or Exits From the Park 

- Adherence to the High-Performance Building Standards 

**==> picture [46 x 46] intentionally omitted <==**
{6}------------------------------------------------
## **Design Scope** 

- Programming and Concept Design with Cost Modeling 

- Schematic Design with Cost Modeling 

- Design Development with Cost Estimate 

- Budget Alignment 

- Construction Documents 

- Permitting Reviews and Corrections 

- Bidding and Negotiation 

- Construction Administration 

**==> picture [46 x 46] intentionally omitted <==**
{7}------------------------------------------------
## **Timeline for Design** 

**==> picture [952 x 235] intentionally omitted <==**

**----- Start of picture text -----**<br>
Bidding<br>Programming  Design  Construction  and<br>and Concept Development Documents Negotiation<br>8 Weeks  12 Weeks 12-16 Weeks 6-8 Weeks<br>Schematic  Budget  Permitting Construction<br>Design Alignment Admin<br>8 Weeks<br>8 Weeks 4 Weeks 16-18 Months<br>**----- End of picture text -----**<br>


**==> picture [960 x 124] intentionally omitted <==**

**----- Start of picture text -----**<br>
8/12/2026<br>**----- End of picture text -----**<br>
{8}------------------------------------------------
## **Action Item** 

- Approve the Method Studio design contract as indicated in the associated resolution. 

**==> picture [960 x 124] intentionally omitted <==**

**----- Start of picture text -----**<br>
8/12/2026<br>**----- End of picture text -----**<br>
{9}------------------------------------------------
# **Questions** 