{0}------------------------------------------------
**==> picture [75 x 77] intentionally omitted <==**

## **TOWN OF BLACK MOUNTAIN AGENDA ITEM SUMMARY** 

|**SUBMITTER:**<br>Jessica Trotman, Assistant Town|**MEETING DATE:**|June 9, 2025|
|---|---|---|
|Manager|||
|**AGENDA SECTION:** New Business|**DEPARTMENT:**|Administration|
|**TITLE OF ITEM:**<br>Selection of McAdams for Hilltop|Road Stabilization|Engineering Services|
|**SUGGESTED MOTION(S):**|||
|To approve the resolution as presented.|||



## **SUMMARY:** 

Staff recommends entering into a professional services contract with McAdams for engineering, design, permitting, and construction administration services for the Hilltop Road Stabilization project. The site was significantly damaged by a landslide during Tropical Storm Helene on September 27, 2024, which compromised the structural integrity of the roadway and drainage systems. 

McAdams has proposed a scope of work that includes the following major components: 

- UAS-based Survey and Topographic Mapping 

- Subsurface Utility Engineering (SUE) 

- Roadway and Drainage Design 

- Geotechnical Investigation and Design 

- Erosion Control Design and Permitting 

- Project Administration and Bid Support Services 

## **BUDGET IMPACT:** 

**Is this expenditure approved in the current fiscal year budget?** Yes, Town Council allocated $300,000 for this project. 

**If no, describe how it will be funded.** 

Page 159 of 179
{1}------------------------------------------------
## **ATTACHMENTS:** 

1. Resolution to Enter into Contract for Hilltop Road Stabilization Project (FEMA PROJECT #811550) 

Page 160 of 179
