{0}------------------------------------------------
**10.1.f** 

**Destination by Design and Burke County Design, Engineering, Permitting, and Cost Estimate Services Agreement** May 8, 2024 

**==> picture [468 x 527] intentionally omitted <==**

**----- Start of picture text -----**<br>
THIS AGREEMENT entered into this ___ day of __________, 2024, by Burke County, referred to as “Client” or<br>“Owner” and Destination by Design Studios, PLLC (DbD), referred to as “DbD” or “Design Team” or “Consultant.”<br>1.0 Project Description and Location<br>1.1 The Client wishes for DbD to develop bid ready construction documents for three (3) planning sections of<br>the Fonta Flora State Trail in accordance with RFQ-2024-0306-REBID issued on Mar 8, 2024 . Per the<br>RFQ, the general study area location and description is as follows:<br>Section 1 : Existing 1.75 miles of trail in 1780 neighborhood with severe erosion concerns which<br>require evaluation of condition with solutions for repairs utilizing unique approaches recognizing the<br>limitations. There are multiple drainage features in this area and will require coordination with the<br>Property Owners Association if altered. Plans will include potential surface hardening, water<br>management, and sediment and erosion control. A wooden footbridge in this section will need to be<br>inspected for repair or maintenance recommendations. A formal road crossing of NC 126 from<br>Lake James State Park will need to be explored. Additional surveying may be required to establish<br>property boundaries to record trail extension.<br>Section 2:  New construction of 2.2 miles from 1780 neighborhood through The Enclave<br>neighborhood where easements are already in place. Will include flagging of trail corridor,<br>surveying, permits as required, neighborhood road crossings, installation of drainage features,<br>construction details, and evaluation of existing utilities. This section of trail leads to the McDowell<br>County line encouraging the long-range connection through multiple counties. Planning for the final<br>mile into McDowell County with recommendations for easements and locations in coordination<br>planners will be needed to ensure alignment is suitable.<br>Section 3:  New construction of 0.8 miles of trail through Lake James Family Camping Resort and<br>Marina with multiple road crossings to include signage, pavement markings, and traffic control<br>plans in coordination with NCDOT requirements for submittal and approval. The easement is<br>already in place, however there will need to be creative solutions to approach obstacles within the<br>trail. These solutions may include recommendations for trail rerouting, landscaping, and utility<br>considerations. The objective being to ensure sustainable alignment.<br>1.2 The project extents noted within the RFQ constitute the total project area for the final design package; any<br>additional or expanded elements will be considered beyond the scope of this design and engineering<br>services contract and would require a change order and additional services.<br>**----- End of picture text -----**<br>


Burke County Fonta Flora State Trail: Construction Documents, Permitting, and Cost Estimates Page 1 of 8 

**Packet Pg. 227**
{1}------------------------------------------------
**10.1.f** 

|1.3|DbD shall be responsible for the appropriate management of the project including any necessary|
|---|---|
|1.4<br>**2.0**|sub-consultants, correspondence, project materials distribution, and scheduling.<br>The intent of the project is to utilize the services of the Design Team for the duration of the project<br>development. Additional assignments, above and beyond those listed 2.0 below, may be added to the<br>scope of services, schedule, and fees at the discretion of the Client.<br>**Scope of Work**|



## **Task 2.1: Concept Plan and Preliminary Design** 

_2.1.1 Concept Plan & Preliminary Design._ Begin the planning process by collecting, documenting, assessing, and conducting a site inventory and conditions for each of the three (3) planning sections. DbD will develop a preliminary site layout that identifies key opportunities and constraints. Where feasible, the Consultant will flag any new or revised trail routes and incorporate this design within the preliminary design. The Consultant will provide an analysis of anticipated permitting requirements, NCDOT permitting requirements & coordination, the bridge analysis (as noted in Planning Section 1), trail easement issues, and an analysis of where a design-level survey is necessary. This sub-task may require consultation with an HOA, POA, or landowner. The Consultant will prepare any required materials for such meetings, which may be led by the Consultant or Client depending on site-specific issues. Subsequently, “brainstorming” meetings are anticipated with the Client to discuss any necessary or advantageous modifications. Based on discussions, budget constraints, and planned program elements, develop a revised conceptual plan in accordance with direction from the Client working group. _2.1.2 Design-Level Survey._ In accordance with the preliminary design, DbD shall obtain a design-level survey for required areas. Upon receiving the design-level survey, commence the final engineering and permitting phase. 

## **Task 2.2: Final Design and Permitting** 

Final bid packages with cost estimates for the three sections will include plans and site specifications that can be bid out as individual construction projects that address the location's unique requirements. Existing master plans for both OVST and FFST should be used to incorporate design style and guide general corridor planning. 

Burke County Fonta Flora State Trail: Construction Documents, Permitting, and Cost Estimates Page 2 of 8 

**Packet Pg. 228**
{2}------------------------------------------------
**10.1.f** 

_2.2.1 Final Engineering and Construction Specifications._ DbD shall prepare and process stamped, sealed, and signed construction drawings for the development for each of the three (3) planning sections. Plans shall conform to all applicable local requirements and should include, but are not limited to the following: Cover Sheet - including plan contents, vicinity map, utility providers’ contact information, and other information as required by the jurisdiction. Demolition Plan- including existing trees, vegetation, buildings, and any other existing structures to be removed; establish tree protection areas and limits of clearing. Site Geometry Plan – including setbacks, buffers, parking geometry dimensions and data,pavement markings, boundary dimensions, and location of physical improvements such as paths, driveways, and signage. Tabulations such as site areas, impervious/pervious surface area calculations, and other data as may be required by the jurisdiction shall be included on the Site Plan. Paving, Grading, and Drainage Plan – including proposed contours and spot shots of roads, drainage ways, parking areas, retaining walls, stormwater management facilities, and establishment of building floor elevations. Hatched areas representing required pavement sections shall be provided on this plan. Stormwater inlet and pipe selection as well as locations of structures, inlets, and the pipe network shall be shown. Erosion and Sediment Control Plans – DbD shall prepare an initial, intermediate, and final erosion and sediment control plan for the proposed project as required by the local jurisdiction and NPDES. A pollution control plan will also be provided along with erosion control details, notes, and sequence of operations as may be required. Construction Details – including special construction details, typical sections, drainage details, outlet control structure details, utility details, erosion control details, and any other applicable jurisdictional details. Final Additional Specifications – produce final construction specifications for all elements included with the adopted concept plan, including, but not limited to: trails; NCDOT crossings; and signage. Signage, Educational, and Artistic Opportunities – Per the Client’s RFQ, the Design Team shall incorporate where feasible “educational interpretation and artistic influences reflective of the current standard of quality.” In accordance with the “Signage Design Allowance” the Consultant shall provide specifications for FFST and/or OVNCST standard signage and explore and design educational and other artistic signage or art that contributes to the overall trail character. In addition, the Consultant will not only provide for custom map panels for kiosks, but also print and web-ready maps (does not include printing). All original files for signage artwork, maps, and visuals will be provided and perpetually licensed to the Client for use and alteration. _2.2.2 Permitting._ Obtain the necessary permits to complete the project, which may include but not be limited to the following: NCDOT; Burke County; the Division of Water Quality (DWQ); Division of Land Resources; and any other necessary permits. Any permit fees shall be paid by the Client. 

Burke County Fonta Flora State Trail: Construction Documents, Permitting, and Cost Estimates Page 3 of 8 

**Packet Pg. 229**
{3}------------------------------------------------
**10.1.f** 

_2.2.3 Budget Preparation._ In accordance with the final construction specifications, prepare an estimate of probable cost for construction for each of the three (3) planning sections. 

## **Task 2.3. Post Document Development Consultation Services** 

The Client shall efforts to bid the project(s). DbD shall advise Client during bidding process to assist in answering questions, clarifications, or up to one (1) site visits if needed. DbD shall not have control over or charge of, and shall not be responsible for, acts or omissions of the Contractor or of any other persons or entities performing portions of the Work. 

## **3.0 Schedule of Fees and Hourly Rates** 

|3.1|The fees below are lump sum and in accordance with the Scope of Services identified in 2.0 above:<br>Task 2.1: Concept Plan & Preliminary Engineering<br>$ 65,000<br>Task 2.2. Final Design, Permitting, and Cost Estimates<br>$ 135,000<br>**Allowances**<br>Post Document Development Consultation<br>$ 3,000<br>Signage Design Allowance<br>$ 40,000<br>Survey Allowance<br>$ 30,000<br>Geo-technical Analysis, bridge engineering, and retaining wall design allowance<br>$ 35,000<br>**Total Cost Not-to-Exceed:**<br>**$ 308,000***|
|---|---|



_*Any required expenses beyond the allowances will require a contract addendum and scope of service approved by the Client. All permit fees to be paid by the Client._ 

- 3.2 Hourly Rates 

   - If requested in writing by the Owner, DbD shall provide additional services at the hourly rates listed below. 

|1.<br>2.<br>3.|Principal/ Professional Engineer/ Landscape Architect<br>Senior Planner/Landscape Designer<br>Administrative|$ 195/hour<br>$ 175/hour<br>$ 75/hour|
|---|---|---|



Burke County Fonta Flora State Trail: Construction Documents, Permitting, and Cost Estimates Page 4 of 8 

**Packet Pg. 230**
{4}------------------------------------------------
**10.1.f** 

**==> picture [468 x 249] intentionally omitted <==**

**----- Start of picture text -----**<br>
Additional Services<br>Any services not specifically provided for in the above scope will be billed as additional services and<br>performed at hourly rates. Additional services we can provide include, but are not limited to, the following:<br>● Subsurface Utility Engineering<br>● Traffic Impact Analysis<br>● Traffic Signal Design<br>4.0 Payment Schedule<br>4.1 Upon contract execution, the Consultant shall be paid a 15% deposit and then subsequently submit monthly or<br>bi-monthly billings in accordance with project progress. Invoices shall not exceed the amounts listed for each<br>phase or total lump sum fee, unless approved in advance by the Owner.<br>DESTINATION BY DESIGN STUDIOS, PLLC<br>STANDARD PROVISIONS<br>**----- End of picture text -----**<br>


**==> picture [467 x 336] intentionally omitted <==**

**----- Start of picture text -----**<br>
1. DbD's Scope of Services and Additional Services.  DbD will perform only the services specifically described in this<br>Agreement. If requested by the Client and agreed to by DbD, DbD will perform Additional Services, which shall be governed<br>by these provisions. Unless otherwise agreed to in writing, the Client shall pay DbD for any Additional Services an amount<br>based upon DbD’s then current hourly rates plus an amount to cover certain direct expenses including telecommunications,<br>in-house reproduction, postage, supplies, project related computer time, and local mileage. Other direct expenses will be<br>billed at 1.15 times cost.<br>2. Client's Responsibilities.  In addition to other responsibilities herein or imposed by law, the Client shall:<br>a. Designate in writing a person to act as its representative, such person having complete authority to transmit<br>instructions, receive information, and make or interpret the Client's decisions.<br>b. Provide all information and criteria as to the Client's requirements, objectives, and expectations for the project and all<br>standards of development, design, or construction.<br>c. Provide DbD all available studies, plans, or other documents pertaining to the project, such as surveys, engineering<br>data, environmental information, etc., all of which DbD may rely upon.<br>d. Arrange for access to the site and other property as required for DbD to provide its services.<br>e. Review all documents or reports presented by DbD and communicate decisions pertaining thereto within a reasonable<br>time so as not to delay DbD.<br>f. Furnish approvals and permits from governmental authorities having jurisdiction over the project and approvals and<br>consents from other parties as may be necessary.<br>g. Give prompt written notice to DbD whenever the Client becomes aware of any development that affects DbD's services<br>or any defect or noncompliance in any aspect of the project.<br>3. Period of Services.  Unless otherwise stated herein, DbD will begin work after receipt of a properly executed copy of this<br>Agreement. This Agreement assumes conditions permitting continuous and orderly progress through completion of the<br>services. Times for performance shall be extended as necessary for delays or suspensions due to circumstances that DbD<br>does not control. If such delay or suspension extends for more than six months, DbD’s compensation shall be renegotiated.<br>**----- End of picture text -----**<br>


Burke County Fonta Flora State Trail: Construction Documents, Permitting, and Cost Estimates Page 5 of 8 

**Packet Pg. 231**
{5}------------------------------------------------
**10.1.f** 

4. **Method of Payment.** Client shall pay DbD as follows: 

   - a. Invoices will be submitted periodically for services performed and expenses incurred. Payment of each invoice will be due within 25 days of receipt. If the Client fails to make any payment due under this or any other agreement within 30 days after DbD's transmittal of its invoice, DbD may, after giving notice to the Client, suspend services and withhold deliverables until all amounts due are paid. 

   - b. If the Client objects to an invoice, it must advise DbD in writing giving its reasons within 14 days of receipt of the invoice or the Client’s objections will be waived, and the invoice shall conclusively be deemed due and owing. If the Client objects to only a portion of the invoice, payment for all other portions remains due. 

   - 5. **Use of Documents.** All documents and data prepared by DbD are related exclusively to the services described in this Agreement and may be used only if the Client has satisfied all of its obligations under this Agreement. They are not intended or represented to be suitable for use or reuse by the Client or others on extensions of this project or on any other project. Any modifications by the Client to any of DbD’s documents, or any reuse of the documents without written authorization by DbD will be at the Client's sole risk and without liability to DbD, and the Client shall indemnify, defend and hold DbD harmless from all claims, damages, losses and expenses, including but not limited to attorneys' fees, resulting therefrom. DbD’s electronic files and source code remain the property of DbD and shall be provided to the Client only if expressly provided for in this Agreement. Any electronic files not containing an electronic seal are provided only for the convenience of the Client and use of them is at the Client’s sole risk. In the case of any defects in the electronic files or any discrepancies between them and the hardcopy of the documents prepared by DbD, the hardcopy shall govern. 

   6. **Intellectual Property.** DbD may use or develop its proprietary software, patents, copyrights, trademarks, trade secrets, and other intellectual property owned by DbD or its affiliates (“Intellectual Property”) in the performance of this Agreement. Unless explicitly agreed to in writing by both parties to the contrary, DbD maintains all interest in and ownership of its Intellectual Property and conveys no interest, ownership, license to use, or any other rights in the Intellectual Property to Client. Any enhancements of Intellectual Property made during the performance of this Agreement are solely owned by DbD and its affiliates. 

   7. **Opinions of Cost.** Because DbD does not control the cost of labor, materials, equipment or services furnished by others, methods of determining prices, or competitive bidding or market conditions, any opinions rendered as to costs, including but not limited to the costs of construction and materials, are made solely based on its judgment as a professional familiar with the industry. DbD cannot and does not guarantee that proposals, bids or actual costs will not vary from its opinions of cost. 

   8. **Termination.** The obligation to provide further services under this Agreement may be terminated by either party upon seven days' written notice in the event of substantial failure by the other party to perform in accordance with the terms hereof, or upon thirty days’ written notice for the convenience of the terminating party. DbD shall retain any paid deposits and be paid for all additional services rendered and expenses incurred to the effective date of termination, and other reasonable expenses incurred by DbD as a result of such termination. 

   9. **Standard of Care.** The standard of care applicable to DbD’s services will be the degree of care and skill ordinarily exercised by consultants performing the same or similar services in the same locality at the time the services are provided. No warranty, express or implied, is made or intended by DbD's performance of services, and it is agreed that DbD is not a fiduciary with respect to the Client. 

   10. **LIMITATION OF LIABILITY.** In recognition of the relative risks and benefits of the Project to the Client and DbD, the risks are allocated such that, to the fullest extent allowed by law, and notwithstanding any other provisions of this Agreement or the existence of applicable insurance coverage, that the total liability, in the aggregate, of DbD and DbD's officers, directors, employees, agents, and subconsultants to the Client or to anyone claiming by, through or 

Burke County Fonta Flora State Trail: Construction Documents, Permitting, and Cost Estimates Page 6 of 8 

**Packet Pg. 232**
{6}------------------------------------------------
**10.1.f** 

under the Client, for any and all claims, losses, costs or damages whatsoever arising out of or in any way related to the services under this Agreement from any causes, including but not limited to, the negligence, professional errors or omissions, strict liability or breach of contract or any warranty, express or implied, of DbD or DbD's officers, directors, employees, agents, and subconsultants, shall not exceed twice the total compensation received by DbD under this Agreement or $50,000, whichever is greater. This Section is intended solely to limit the remedies available to the Client or those claiming by or through the Client, and nothing in this Section shall require the Client to indemnify DbD. 

11. **Mutual Waiver of Consequential Damages.** In no event shall either party be liable to the other for any consequential, incidental, punitive, or indirect damages including but not limited to loss of income or loss of profits. 

12. **Construction Costs.** Under no circumstances shall DbD be liable for extra costs or other consequences due to unknown conditions or related to the failure of contractors to perform work in accordance with the plans and specifications. DbD shall have no liability whatsoever for any costs arising out of the Client’s decision to obtain bids or proceed with construction before DbD has issued final, fully approved plans and specifications. The Client acknowledges that all preliminary plans are subject to substantial revision until plans are fully approved and all permits obtained. 

13. **Certifications.** All requests for DbD to execute certificates, lender consents, or other third-party reliance letters must be submitted to DbD at least 14 days prior to the requested date of execution. DbD shall not be required to execute certificates, consents, or third-party reliance letters that are inaccurate, that relate to facts of which DbD does not have actual knowledge, or that would cause DbD to violate applicable rules of professional responsibility. 

14. **Dispute Resolution.** All claims arising out of this Agreement or its breach shall be submitted first to mediation in accordance with the American Arbitration Association as a condition precedent to litigation. Any mediation or civil action by Client must be commenced within one year of the accrual of the cause of action asserted but in no event later than allowed by applicable statutes. 

15. **Hazardous Substances and Conditions.** DbD shall not be a custodian, transporter, handler, arranger, contractor, or remediator with respect to hazardous substances and conditions. DbD's services will be limited to analysis, recommendations, and reporting, including, when agreed to, plans and specifications for isolation, removal, or remediation. DbD will notify the Client of unanticipated hazardous substances or conditions of which DbD actually becomes aware. DbD may stop affected portions of its services until the hazardous substance or condition is eliminated. 

**16. Construction Phase Services.** a. If DbD prepares construction documents and DbD is not retained for Construction Phase Services/ Contract Administration, the Client assumes all responsibility for interpretation of the documents and for construction observation, and the Client waives any claims against DbD in any way connected thereto. 

b. DbD shall have no responsibility for any contractor's means, methods, techniques, equipment choice and usage, equipment maintenance and inspection, sequence, schedule, safety programs, or safety practices, nor shall DbD have any authority or responsibility to stop or direct the work of any contractor. DbD's visits will be for the purpose of endeavoring to provide the Client a greater degree of confidence that the completed work of its contractors will generally conform to the construction documents prepared by DbD. DbD neither guarantees the performance of contractors, nor assumes responsibility for any contractor’s failure to perform its work in accordance with the contract documents. 

c. DbD is not responsible for any duties assigned to it in the construction contract that are not expressly provided for in this Agreement. The Client agrees that each contract with any contractor shall state that the contractor shall be solely responsible for job site safety and its means and methods; that the contractor shall indemnify the Client and DbD for all claims and liability arising out of job site accidents; and that the Client and DbD shall be made additional insureds under the contractor’s general liability insurance policy. 

Burke County Fonta Flora State Trail: Construction Documents, Permitting, and Cost Estimates Page 7 of 8 

**Packet Pg. 233**
{7}------------------------------------------------
**10.1.f** 

**==> picture [450 x 104] intentionally omitted <==**

**----- Start of picture text -----**<br>
17.  No Third-Party Beneficiaries; Assignment and Subcontracting.  This Agreement gives no rights or benefits to<br>anyone other than the Client and DbD, and all duties and responsibilities undertaken pursuant to this Agreement will be<br>for the sole benefit of the Client and DbD. The Client shall not assign or transfer any rights under or interest in this<br>Agreement, or any claim arising out of the performance of services by DbD, without the written consent of DbD. DbD<br>reserves the right to augment its staff with subconsultants as it deems appropriate due to project logistics, schedules,<br>or market conditions. If DbD exercises this right, DbD will maintain the agreed-upon billing rates for services identified<br>in the contract, regardless of whether the services are provided by in-house employees, contract employees, or<br>independent subconsultants.<br>**----- End of picture text -----**<br>


18. **Confidentiality.** The Client consents to the use and dissemination by DbD of photographs of the project and to the use by DbD of facts, data and information obtained by DbD in the performance of its services. If, however, any facts, data or information are specifically identified in writing by the Client as confidential, DbD shall use reasonable care to maintain the confidentiality of that material. 

**==> picture [446 x 65] intentionally omitted <==**

**----- Start of picture text -----**<br>
19.  Miscellaneous Provisions.  This Agreement is to be governed by the law of the State where the Project is located.<br>This Agreement contains the entire and fully integrated agreement between the parties and supersedes all prior and<br>contemporaneous negotiations, representations, agreements, or understandings, whether written or oral. Except as<br>provided in Section 1, this Agreement can be supplemented or amended only by a written document executed by both<br>parties.<br>**----- End of picture text -----**<br>


**==> picture [457 x 272] intentionally omitted <==**

**----- Start of picture text -----**<br>
5.0 Signatures<br>IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the day and year first above written.<br>Burke County<br>Signature<br>Title Date<br>Destination by Design Studios, PLLC<br>Signature<br>Title Date<br>**----- End of picture text -----**<br>


Burke County Fonta Flora State Trail: Construction Documents, Permitting, and Cost Estimates Page 8 of 8 

**Packet Pg. 234**