{0}------------------------------------------------
**6.3.a** 

**==> picture [360 x 102] intentionally omitted <==**

**==> picture [464 x 355] intentionally omitted <==**

**----- Start of picture text -----**<br>
Request for Qualifications<br>Burke County Trail Design & Engineering<br>RFQ-2024-0306-REBID<br>March 7, 2024<br>In partnership:<br>Burke County<br>Friends of Fonta Flora   Overmountain Victory North<br>State Trail   Carolina State Trail Friends<br>**----- End of picture text -----**<br>


**==> picture [91 x 19] intentionally omitted <==**

**----- Start of picture text -----**<br>
Packet Pg. 159<br>**----- End of picture text -----**<br>
{1}------------------------------------------------
**6.3.a** 

RFQ-2024-0306-REBID       BURKE COUNTY TRAIL DESIGN & ENGINEERING 

March 7, 2024 

|1.<br>2.<br>3.<br>4.<br>5.<br>6.<br>7.<br>8.<br>9.<br>10.<br>11.|Table of Contents<br>Introduction<br>Overview<br>Locations & Descriptions<br>General Requirements<br>Firm’s Affirmations<br>Submission Requirements<br>Scope of Work<br>Included in Qualifications<br>Project Anticipated Schedule<br>Evaluation Criteria<br>RFQ Form|3<br>4<br>4<br>4<br>5<br>6<br>7<br>7<br>8<br>8<br>9|
|---|---|---|



Page **2** of **10 Packet Pg. 160**
{2}------------------------------------------------
**6.3.a** 

RFQ-2024-0306-REBID       BURKE COUNTY TRAIL DESIGN & ENGINEERING 

March 7, 2024 

1. Introduction 

The County of Burke, Friends of Fonta Flora, and Overmountain Victory North Carolina State Trail Friends Group are seeking the professional services of a qualified professional firm or team of firms to provide design services and construction documents for three separate sections of the co-located Fonta Flora State Trail (FFST) and Overmountain Victory State Trail (OVST) in the western part of Burke county. 

**The submittal deadline is Wednesday, March 29, 2024 (03-29-2024) 12:00pm** 

The firm’s qualification package shall be submitted as an electronic PDF on a USB thumb drive, and in 1 paper copy in a sealed envelope/box. The envelope/box shall be labeled with the project’s name and the firm’s name. Qualification packages can be submitted by any one of the following methods: 

|Mail:<br>Physical:|Burke County Finance Office<br>Attn: Brian Nieft<br>PO Box 219<br>Morganton, NC 28680<br>Burke County Finance Office<br>Attn: Brian Nieft<br>200 Avery Avenue<br>Morganton, NC 28655|
|---|---|



**REQUIRED SITE VISIT:** Any firm that intends to submit a proposal is required to conduct a site visit, please contact Sarah Chabaane via email at sarah.chabaane@burkenc.org or by calling 828-764-9034 to schedule a visit. Site visits must be scheduled by 5:00pm, Thursday, March 14[th] and completed before the submission deadline. 

Administrative and Scope questions can be emailed to Brian Nieft at brian.nieft@burkenc.org no later than 5pm, on Wednesday, March 20, 2024. Answers to all submitted questions will be posted on the website below. 

Any bid received later than the specified date and time will not be accepted or considered. No public bid opening will take place, the bid results will be posted on the County website. 

**If a firm submitted a proposal for the original posting of the RFQ, attended the site visit, and would like their original proposal to be considered for the rebid, please email brian.nieft@burkenc.org prior to the submitted deadline to confirm they would like their original proposal considered with no changes.** 

Please visit www.burkenc.org/Bids.aspx to download this information and any updates on the project. 

Page **3** of **10 Packet Pg. 161**
{3}------------------------------------------------
**6.3.a** March 7, 2024 

RFQ-2024-0306-REBID       BURKE COUNTY TRAIL DESIGN & ENGINEERING 

2. Overview 

The County of Burke, Friends of Fonta Flora, and Overmountain Victory North Carolina State Trail Friends Group are seeking the professional services of a qualified professional firm or team of firms to provide design services and construction documents for three separate sections of the co-located Fonta Flora State Trail (FFST) and Overmountain Victory State Trail (OVST) in the western part of Burke county. Each of the three sections detailed below will come with unique challenges. They are natural surface trails designed for a front country hiking and biking experience traversing a variety of landscapes. There are currently 20 completed miles of the Fonta Flora State Trail in Burke County around Lake James that are on both public and private lands including State Parks, County Parks, easements/leases on Duke Energy lands, Wildlife Resources Commission Game Lands, NCDOT Right of Way, privately owned campgrounds, and easements through neighborhood developments. Trail development has great support from Burke County Board of Commissioners and community engagement is majority positive. 

3. Locations and Descriptions 

   - 3.1. **Section 1** : Existing 1.75 miles of trail in 1780 neighborhood with severe erosion concerns which require evaluation of condition with solutions for repairs utilizing unique approaches recognizing the limitations. There are multiple drainage features in this area and will require coordination with the Property Owners Association if altered. Plans will include potential surface hardening, water management, and sediment and erosion control. A wooden footbridge in this section will need to be inspected for repair or maintenance recommendations. A formal road crossing of NC 126 from Lake James State Park will need to be explored. Additional surveying may be required to establish property boundaries to record trail extension. 

   - 3.2. **Section 2: N** ew construction of 2.2 miles from 1780 neighborhood through The Enclave neighborhood where easements are already in place. Will include flagging of trail corridor, surveying, permits as required, neighborhood road crossings, installation of drainage features, construction details, and evaluation of existing utilities. This section of trail leads to the McDowell County line encouraging the long-range connection through multiple counties. Planning for the final mile into McDowell County with recommendations for easements and locations in coordination planners will be needed to ensure alignment is suitable. 

   - 3.3. **Section 3:** New construction of 0.8 miles of trail through Lake James Family Camping Resort and Marina with multiple road crossings to include signage, pavement markings, and traffic control plans in coordination with NCDOT requirements for submittal and approval. The easement is already in place, however there will need to be creative solutions to approach obstacles within the trail. These solutions may include recommendations for trail rerouting, landscaping, and utility considerations. The objective being to ensure sustainable alignment. 

4. General Requirements 

   - 4.1. The RFQ contact form must be signed and returned with the firm’s proposal package for the services and deliverables described in Schedule 7 (the “Scope of Work”). 

   - 4.2. The County will not be bound to act by any communication or proposal submitted by firms other than in accordance with this RFQ. 

   - 4.3. Firm’s questions and the County’s responses may or may not be forwarded to all firms.  The County reserves the right to communicate all or part of the questions and responses with all or certain firms. 

   - 4.4. By submitting a proposal package in response to this RFQ, firm is deemed to accept the award selection process and criteria and County’s discretion in connection with such process and criteria. 

Page **4** of **10 Packet Pg. 162**
{4}------------------------------------------------
**6.3.a** 

RFQ-2024-0306-REBID       BURKE COUNTY TRAIL DESIGN & ENGINEERING 

March 7, 2024 

5. 

- 4.5. By submitting a proposal package in response to this RFQ, the firm acknowledges and waives any claim for compensation of any kind whatsoever against the County or any of its Representatives (as defined below), as a result of its submission, any decision made by the County during the RFQ process, including when acting in its sole discretion, or arising in any other manner from its participation in this RFQ. 

- 4.6. Qualified firms will have at least 5 years of experience in managing projects. The firm should be a professional engineering, landscape, design, or licensed general contractor with demonstrated staff experience in meeting facilitation and presentations, conducting site assessments, planning, trail design, erosion control and stormwater management design standards, easements, stream crossings, environmental permitting, integration of art/educational/interpretation in projects, and familiarity with NCDOT engineering requirements for road crossings and ROW of permitting. 

- 4.7. The County reserves the right to reject any or all bids, waive technicalities, and to be the sole judge of suitability of the services for its intended use and further specifically reserve the right to make the award in the best interests of the County.  Failure to respond to any requirements outlined in this RFQ may disqualify the bid. 

- Firm’s Affirmations 5.1. By submitting its qualifications, the firm represents and warrants the following: a. This RFQ is a solicitation for professional proposals and is not a contract or an offer to contract. 

- b. The submission of a proposal package by the firm in response to this RFQ will not create a contract between the County and firm. 

- 5.2. The County makes no representation or warranty, written or oral, that one or more contracts will be awarded under this RFQ; and 

- 5.3. The firm will bear, as its sole risk and responsibility, any cost arising from the firm’s preparation of a response to this RFQ and, as applicable, contract negotiations. 

- 5.4. The firm is a reputable person that is lawfully and regularly engaged in providing and/or performing the Professional Services. 

- 5.5. The firm has the necessary experience, knowledge, abilities, skills, and resources to provide the Deliverables and/or perform the Professional Services upon the terms and conditions specified in this RFQ. 

- 5.6. The firm is aware of, is fully informed about, and is in full compliance with all applicable federal, state and local laws, rules, regulations and ordinances including, without limitation, those relating to bid rigging. 

- 5.7. The firm understands: a. The requirements and specifications set forth in this RFQ and b. The terms and conditions set forth under which the firm will be required to operate. 

- 5.8. If selected by the County, the firm will not delegate any of its duties or responsibilities under this RFQ or any resulting contract to any subcontractor, except as expressly provided in the qualifications. 

- Firm’s Affirmations 

Page **5** of **10 Packet Pg. 163**
{5}------------------------------------------------
RFQ-2024-0306-REBID       BURKE COUNTY TRAIL DESIGN & ENGINEERING 

March 7, 2024 

6. Submission Requirements 

**==> picture [55 x 19] intentionally omitted <==**

**----- Start of picture text -----**<br>
6.3.a<br>**----- End of picture text -----**<br>


- 5.9. If selected by the County, the firm will maintain any insurance coverage required by the contract during the term thereof. 

- 5.10. All statements, information and representations prepared and submitted in response to this RFQ are current, complete, true and accurate.  The firm acknowledges that the County will rely on such statements, information and representations in selecting the successful professional services provider. If selected by the County, the firm will notify the County immediately of any material change in any matters regarding the firm’s responses to questions asked by the county, any documentation the firm has provided or any change that would materially impact the firm’s ability to execute and complete the project as agreed upon. 

- 5.11. The firm has not given or offered to give to the County or any of its Representatives nor does it intend to give at any time hereafter, any economic opportunity, future employment, gift, loan, gratuity, special discount, trip, favor or service in connection with its submitted quotation. 

- 5.12. The firm certifies that other than the relationships which have been previously disclosed to the County in writing: 

   - a. No relationship, whether by blood, marriage, business association, capital funding agreement or any other such kinship or connection exists between the owner of any firm that is a sole proprietorship, the officers or directors of any firm that is a corporation, the partners of any firm that is a partnership, the joint ventures of any firm that is a joint venture or the members or managers of any firm that is a limited liability company, on one hand, and an employee of any affiliate of the County, on the other hand, and 

   - b. The firm or any of its officers, directors and shareholders/partners has not been an employee of the County within the immediate twelve (12) months prior to the submittal deadline of this RFQ.  All disclosures by firm in connection with this certification will be subject to administrative review and approval before the County enters into a purchase order, contract or agreement with firm. 

- 5.13. The firm represents and warrants that no proceedings have been taken or authorized by it or by any other person with respect to the bankruptcy, insolvency, liquidation, dissolution or winding up of the firm nor, to the knowledge of the firm, has anyone threaten to take any such proceedings against it. 

- 6.1. Contact: All completed documents constituting your proposal, as well as any questions or clarifications concerning this RFP must be submitted to the County’s representative identified on page 3 of this RFQ. 

- 6.2. Timeline: The proposal package must be received on or before the submittal deadline (date and time) specified on page 3 of this RFQ.  If a change to the timeline is required, the County will communicate the change to the firm(s). 

- 6.3. Format: Font size should be 11-14 in size, bid package should not exceed 25 pages with 8.5” x 11” page format. Cover letter, table of contents, tabs or dividers are not included in the page count. Front and back pages are acceptable, but each side counts as a page. RFQ Contact Form must be included with submission. Contents may include charts, tables, graphics, images, maps, and general narrative format. 

Page **6** of **10 Packet Pg. 164**
{6}------------------------------------------------
**6.3.a** 

RFQ-2024-0306-REBID       BURKE COUNTY TRAIL DESIGN & ENGINEERING 

March 7, 2024 

7. 

8. 

## Scope of Work 

- 7.1. The selected firm will begin the planning process by collecting, documenting, assessing, conducting a site inventory and conditions for each of the three sections and summarize findings in a report format that will assist in identifying priority projects. The selected firm is expected to provide site plan development to include: 

      - a. Topographical and Boundary surveys. 

      - b. Develop turnkey bidding and construction plans with specifications. 

      - c. Advise on necessary permit acquisition as well as generate materials for permits d. Provide materials, graphics, maps, visual interpretation aides, and exhibits as needed for each of the three sections. 

   - 7.2. Final bid packages with cost estimates for the three sections will include plans and site specifications that can be bid out as individual construction projects that address the locations unique requirements. Existing master plans for both OVST and FFST should be used to incorporate design style and guide general corridor planning. Opportunities to include educational interpretation and artistic influences reflective of the current standard of quality should be incorporated where feasible. Certain areas of the trail and its features must meet the Americans with Disabilities Act and Architectural Barriers Act as required. Planning and design need to incorporate requirements for state trail designation. 

   - 7.3. If the firm identifies an additional element or elements not included in this RFQ, which in their judgment would be essential to accomplish the intended objectives as articulated in this RFQ, the firm should identify the element(s) in their proposal and explain in detail why the county should consider including the element(s) within the scope of services. 

Included in Qualifications: 

- 8.1. Letter of Intent 

- 8.2. Brief Description of the firm’s background & approach that will be taken for the project and anticipated work. 

- 8.3. List of three recent projects that have similar scope and size that demonstrate experience specific to the type of services outlined in the scope: 

   - a. A brief description of firm’s role. 

   - b. Contact information for each reference. 

- c. Notation if project was completed on time and/or within budget. 

- 8.4. Project organization 

   - a. Team organization chart with names and functions. b. List of team members resumes and relative work experience. c. Proposed project execution plan/schedule. d. Total team submittal- Submission of all team members and firms who will make up the total design team. 

Page **7** of **10 Packet Pg. 165**
{7}------------------------------------------------
**6.3.a** 

RFQ-2024-0306-REBID       BURKE COUNTY TRAIL DESIGN & ENGINEERING 

March 7, 2024 

**==> picture [537 x 558] intentionally omitted <==**

**----- Start of picture text -----**<br>
8.5. Declaration of any pending or settled lawsuits or professional liability claims in which the firm has been<br>involved in in the past 10 years. Please provide information on any occurrences and the circumstances<br>with the outcome.<br>9. Project Anticipated Schedule:<br>March 7, 2024 – RFQ Rebid Posted<br>March 14, 2024 – Deadline to schedule site visit<br>March 29, 2024 – Proposals due & site visit must be completed<br>April 10, 2024 & April 11, 2024 – Panel interviews with selected firms<br>April 2024 – Final Selection and project award by Burke County Board of Commissioners<br>April/May 2024 – Contract negotiations and project start.<br>10. Evaluation Criteria<br>Submissions will be evaluated based on the following criteria:<br>Evalua�on Criteria  Points<br>Demonstrated understanding of design development through similar projects.  35<br>Experience with successfully executed projects of similar size, ameni�es, facili�es, and<br>considera�ons. Examples that show working knowledge of IMBA and US Forest Service<br>standards for sustainable trail designs. Ability to generate construc�on documents<br>including terrain profiles for natural surface trails, road and stream crossing, and<br>delinea�ng a trail corridor. Firm shows crea�vity and imagina�on integrated into similar<br>projects that show harmony with surrounding terrain.<br>Experience with the process of data gathering and consolida�on. Track record of on  25<br>�me and on budget projects. Reputa�on and references from previous projects. Firm’s<br>li�ga�on, legal ac�ons, and arbitra�on records. Geographic familiarity of project area.<br>Proposed team members and their unique quali�es that would make firm/team best  20<br>suited for the project based on their disciplines, experience, qualifica�ons,<br>cer�fica�ons, and demonstrated abili�es.<br>Proven experience in permi�ng process to include NCDOT requirements and working  15<br>with easement holders that demonstrate understanding of regulatory constraints.<br>Experience with providing these services to government en��es.  5<br>Total  100<br>**----- End of picture text -----**<br>


Page **8** of **10 Packet Pg. 166**
{8}------------------------------------------------
**6.3.a** 

**RFQ CONTACT FORM** 

RFQ-2024-0306-REBID       BURKE COUNTY TRAIL DESIGN & ENGINEERING 

March 7, 2024 

RFQ Form 

**==> picture [415 x 406] intentionally omitted <==**

**----- Start of picture text -----**<br>
To:  Burke County Finance Office<br>ATTN: Brian Nieft<br>200 Avery Ave<br>Morganton, NC  28655<br>From:  _________________________________<br>_________________________________<br>_________________________________<br>_________________________________<br>Principal Contact Information<br>__________________________________  ___________________________________<br>  Signature    Company Address Line 1<br>___________________________________  ___________________________________<br>  Print Name    Company Address Line 2<br>___________________________________  ___________________________________<br>  License Number    Work Phone<br>___________________________________  ___________________________________<br>  Expiration Date    Cell Phone<br>___________________________________  ___________________________________<br>  Company Name   Email<br>**----- End of picture text -----**<br>


Date: _______________________ 

CONTACT FORM **Packet Pg. 167**
