{0}------------------------------------------------
**6.3.d** 

BURKE COUNTY, NC RFQ-2024-0306 TRAIL DESIGN & ENGINEERING 

March 6, 2024 

**SUBMITTED BY:** 

**==> picture [193 x 83] intentionally omitted <==**

Destination by Design 136 Furman Rd, ste 6 Boone, NC 28607 (828) 386-1866 

Eric Woolridge, Principal Planner eric@dbdplanning.com 

**Packet Pg. 170**
{1}------------------------------------------------
**6.3.d** 

## Letter of Intent 

March 5, 2024 Attn: Brian Nieft 

Burke County Finance Office 200 Avery Avenue Morganton, NC 28655 

## Re: Request for Qualifications (RFQ) for Burke County Trail Design & Engineering 

## Dear Mr. Brian Nieft and Members of the Selection Committee: 

We applaud the County’s efforts to advance and prioritize investments to improve and expand the Fonta Flora State Trail (FFST) and Overmountain Victory State Trail (OVST) in Burke County. The RFQ delineates three distinct sections, each presenting its own set of challenges. In this period of heightened investment in state trail development within the County and throughout the state, we have assembled a team to ensure that Burke County and its partners enhance their position as pioneers in developing and managing destination-quality trails. 

As you review our statement of qualifications (SOQ), please consider the following benefits the Destination by Design (DbD) and Kimley-Horn team offers you: 

- Experts in Natural Surface Trail Design and Education: This initiative will be spearheaded by Tim Johnson, the Director of Outdoor Recreation Planning at DbD. Bringing over twenty years of expertise in trail design across the state and within western North Carolina, Tim offers a comprehensive understanding of the diverse challenges inherent to each study area. His broad experience includes significant public engagement efforts and collaborations with landowners, positioning him as an expert in the field of trail planning. 

- Extensive Experience with Fonta Flora State Trail and Overmountain Victory State Trail: DbD has completed three Fonta Flora State Trail Plans, implemented the Burke County Park trailhead and trail system, and developed the facility design package. 

- Experience Working with the 1780 Property Owners Association: DbD has worked with the Property Owners Association (POA) for the 1780 Development to provide conceptual plans for facilities at Camp Lake James. We have an established, positive relationship with this client that can help ensure project success through this established residential neighborhood. 

- Engineering/ NCDOT Coordination Capacity: DbD has teamed with Kimley-Horn to provide additional capacity for civil design, NCDOT coordination, utility coordination, and more. Together, our collective team can efficiently and effectively address the significant natural surface trail needs while also meeting project needs pertaining to NCDOT, major road crossings, and other project civil-related project elements. 

Our team is excited about the opportunity to continue serving the County and collaborating on this transformational project. We are passionate about design, client service, and exceeding your expectations. Together, we will achieve your desired outcomes. Thank you for your consideration of our qualifications. 

Warm regards, 

Eric Woolridge, AICP 

Principal Planner, Destination by Design 136 Furman Rd, Ste 6 | Boone, NC 28607 eric@dbdplanning.com | www.dbdplanning.com 

02 

~~**Packet Pg. 171**~~
{2}------------------------------------------------
**6.3.d** 

## Firm Profiles 

**==> picture [94 x 32] intentionally omitted <==**

## **DESTINATION BY DESIGN** 

136 Furman Road | Suite 6 Boone, NC 28607 (828) 386-1866 www.dbdplanning.com 

## INSTAGRAM 

@destination_by_design 

## VIMEO 

vimeo.com/destinationbydesign 

## **ERIC WOOLDRIDGE** 

President and Planning Director 828.719.1109 eric@DbDplanning.com 

## **D ESTI NAT I ON BY  D ES I GN** 

Destination by Design (DbD) is an award winning interdisciplinary planning, engineering, and communications firm. Founded in 2012, DbD has 22 employees that service our clients through the southeast in recreation planning, greenway and trail development, downtown revitalization, tourism planning, and place-branding. 

DbD has developed four (4) Fonta Flora Trail Master Plans, eight (8) Overmountain Victory Trail Master Plans (currently developing two additional plans), and was the lead design/builder for the Lake James Burke County Park trail system and trailhead. Our firm has helped solidify the FFST and OVST trail brands and has experience designing hundreds of miles of natural surface trail planning across North Carolina and the southeast. 

Specific to the Burke County Trail Design & Engineering project, DbD will serve as the Prime contractor that will be responsible for overall project management, trail design, bridge design, and community (HOA) engagement. 

**==> picture [118 x 24] intentionally omitted <==**

Kimley-Horn is a national planning and design consulting firm that specializes in transportation and urban design. 

Founded in 1967, Kimley-Horn has more than 7,400 employees that serves a range of clients across many disciplines from 120+ offices nationwide, including eight across North and South Carolina. Our multidisciplinary experience covers a wide range of services within transportation planning and engineering, landscape architecture and urban design, and environmental planning and design. 

Specific to the Burke County Trail Design & Engineering project, Kimley-Horn will serve as a subcontractor to DbD and will assist with NCDOT crossing design and coordination, including: pavement marking plans and traffic control plan; stormwater design; utility coordination; permitting (NCDOT encroachment and NCDEQ erosion & sediment control if necessary). 

**==> picture [254 x 149] intentionally omitted <==**

**==> picture [257 x 149] intentionally omitted <==**

03 

~~**Packe**~~ **t Pg. 172**
{3}------------------------------------------------
**6.3.d** 

## PROJECT APPROACH 

_The DbD and KH team recommend completing the Burke County Trail Design & Engineering project through the execution of two (2) primary tasks: 1) Discovery, Analysis, and Preliminary Trail Alignment; and 2) Construction Specifications. The necessary steps and deliverables to ensure the most time and cost effective approach to this project are outlined in the tasks below._ 

## TASK 1: DISCOVERY, ANALYSIS, AND PRELIMINARY TRAIL ALIGNMENT 

_For this task the consultant team will gather all necessary information, conduct field surveys, engage key stakeholders (including HOAs, other key landowners, and regulatory agencies), and conduct an analysis to understand the project area, its constraints, opportunities, and the requirements necessary to create a sustainable, destination-quality trail._ 

## **KEY TASKS INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING:** 

**TASK 1.1: DATA COLLECTION** Collect existing data regarding the project site, including topographical maps, soil studies, environmental constraints, and existing infrastructure. 

## **TASK 1.2: SITE SURVEYS** 

Conduct detailed site surveys to assess the physical characteristics of the site, including geography, flora and fauna, existing trails or paths, and potential access points. 

## **TASK 1.3: STAKEHOLDER ENGAGEMENT** 

Engage with key stakeholders, including local, regional, and state trail organizations and landowners/ HOAs to gather input and understand their expectations and concerns. 

## **TASK 1.4: REGULATORY REVIEW** 

Review all relevant local, state, and federal regulations to identify any constraints or requirements for the trail’s design and construction. Specifically, engage county and state regulatory agencies and NCDOT. 

## **TASK 1.5: PRELIMINARY TRAIL ALIGNMENT** 

Develop preliminary design concepts based on the collected data and stakeholder feedback. These concepts should consider trail alignment, surface types, drainage, crossings, signage, and amenities. This will include flagged trail alternatives in the field. Consider existing utilities, septic fields, existing easements, and other opportunities and constraints to develop alternatives for the client to consider. 

04 

~~**Packet Pg. 173**~~
{4}------------------------------------------------
**6.3.d** 

## TASK 1 DELIVERABLES: SUMMARY FINDINGS AND REPORT 

_For this task the consultant team will gather all necessary information, conduct field surveys, engage key stakeholders (including HOAs, other key landowners, and regulatory agencies), and conduct an analysis to understand the project area, its constraints, opportunities, and the requirements necessary to create a sustainable, destination-quality trail._ 

## **DELIVERABLE 1: DATA SYNTHESIS** 

Synthesize the data and information gathered during the discovery and analysis phase to highlight key findings. 

## **DELIVERABLE 2: DESIGN RECOMMENDATIONS (OR ALTERNATIVES)** 

Based on the preliminary design concepts and feasibility study, provide detailed recommendations for the trail’s design and construction. Provide specific recommendations for bridges, DOT road crossings, drainage issues, etc. 

## **DELIVERABLE 3: ENVIRONMENTAL AND PERMITTING CONSIDERATIONS** 

Summarize permitting needs, including any significant findings and recommendations for mitigating any negative environmental impacts. 

## **DELIVERABLE 4: STAKEHOLDER SUMMARY** 

Provide a summary of stakeholder/landowner engagement activities, highlighting key concerns, suggestions, and areas of support or opposition. 

## **DELIVERABLE 5: ESTIMATE OF PROBABLE COST** 

Summarize the cost analysis, providing a detailed breakdown of estimated construction and final engineering costs. 

## **DELIVERABLE 6: IMPLEMENTATION TIMELINE** 

Propose a realistic timeline for the project’s implementation, including key milestones and phases. 

**==> picture [542 x 202] intentionally omitted <==**

05 

~~**Packe**~~ **t Pg. 174**
{5}------------------------------------------------
**6.3.d** 

## TASK 2: CONSTRUCTION SPECIFICATIONS AND FINAL BID PACKAGE 

_The consultant team will prepare final bid packages with detailed cost estimates for the three distinct project sections, providing the individual bidding of construction projects tailored to meet the unique requirements of each location. Utilizing the existing master plans for the OVST and FFST, the design style and general corridor planning will be integrated, ensuring consistency and adherence to existing standards. The incorporation of educational, interpretative, and artistic elements will be incorporated as agreed upon within the Summary Findings and Report (Task 1)._ 

## **FINAL ELEMENTS WILL BE DETERMINED UPON APPROVAL OF THE FINDINGS REPORT (TASK 1), BUT EXPECTED TASKS INCLUDE THE FOLLOWING:** 

## **TASK 2.1: DEVELOPMENT OF INDIVIDUAL BID PACKAGES WITH COST ESTIMATES** 

Create comprehensive bid packages for each trail section (final deliverable), including detailed plans, site specifications, and accurate cost estimates that reflect the unique characteristics and requirements of each location. 

## **TASK 2.2: STORM DRAINAGE AND EROSION CONTROL DESIGN** 

Our approach for the new construction trail will be to design and specify erosion control measures in accordance with the requirements of NC DEQ and the County, which minimize erosion and limit offsite sedimentation to protect water quality. Our approach for both the new construction trail and the maintenance of the existing trail is to recommend sustainable trail techniques, and avoid infrastructure such as ditches, cross-pipes, or culverts. 

## **TASK 2.3: TRAFFIC CONTROL PLAN** 

The trail will be constructed outside the existing edge of pavement and generally away from vehicular traffic. However, the consultant team will need to plan how the contractor will access the site with construction equipment and materials. The traffic control plan will be performed in accordance with applicable NCDOT and MUTCD standards and guidelines. 

## **TASK 2.4: UTILITY COORDINATION** 

There are private and public utilities present within the corridor (overhead electric, underground telecom, and a septic field) that may be impacted by the project. We recommend meeting with the utility companies as early as when the 30% plans (Task 1) are complete. This will offer the project team the opportunity to obtain valuable input from the utility companies that could potentially save money and time. 

## **TASK 2.5: NCDOT COORDINATION** 

Our team is structured to navigate coordination with NCDOT seamlessly. All our team members have experience working with NCDOT Division 13 and efficiently obtaining encroachment agreements. 

06 

~~**Packet Pg. 175**~~
{6}------------------------------------------------
**6.3.d** 

## **TASK 2.6: PEDESTRIAN CROSSINGS** 

We recognize the significance of minimizing potential conflict points between trail users and vehicular traffic. By reducing these points, we can significantly enhance the user experience. 

For Section 1, we recommend formalizing three existing road crossings and adding one new crossing. To improve safety and visibility for neighborhood connections (Donahue Drive, Hully Gully Drive, and Campbells Trace), we propose installing high-visibility crosswalks. In line with the NCDOT Pedestrian Crossing Treatment Evaluation Guidance, we also recommend considering a high-visibility crosswalk at the proposed crossing on Yellow Mountain Road (NC-126). Our team will engage with NCDOT Division 13 early in the design process to ensure consensus. 

For Section 2, we also recommend high-visibility crosswalks at the mid-block crossings on Saylor Way and Campbells Trace. 

For Section 3, it is our understanding that the County desires to install rectangular rapid flashing beacons (RRFBs) at the mid-block crossings on Benfields Landing Road. This decision is influenced by the constrained locations of these crossings, which lack adequate sight lines. The proposed trail, which is proposed along the eastern side of Benfields Landing Road, necessitates crossings over multiple driveways. We will evaluate property lines, right-of-way, and other easements to determine if driveway consolidation is appropriate. One such location for study is where the trail intersects with the merging junction of Black Forest Drive and the driveway leading to the Lake James Family Campground. For all proposed crossings, we will work to ensure there are robust crossing treatments with adequate sight lines. These treatments may include the addition of pedestrian refuge islands, pedestrian signals, or rectangular rapid flashing beacons (RRFBs) and advance warning signage. 

## **TASK 2.7: WETLAND AND STREAM DELINEATION** 

Prior to surveying the project corridor, our professional wetland scientists will field delineate the jurisdictional wetland and stream features within the project study area. We will complete critical information and data forms required for certification by the U.S. Army Corps of Engineers (USACE) during the initial field reviews. We will coordinate with the USACE and the North Carolina Division of Water Resources prior to finalizing the limits of the jurisdictional features and flag the approved limits of the jurisdictional features using the guidelines presented in the 1987 USACE Wetland Delineation Manual. 

07 

~~**Packe**~~ **t Pg. 176**
{7}------------------------------------------------
**6.3.d** 

## PROJECT UNDERSTANDING 

## SECTION 1: EXISTING 1.75 MILES OF TRAIL IN 1780 NEIGHBORHOOD 

**KEY FACTS:** 

- Section consists of existing trail with gravel tread. Clogged drainage structures, poor alignment, and steep grades have contributed to erosion across and along the trail. The adjacent road also drains to the trail in several locations. 

- Evaluate conditions of existing constructed trail alignment and employ sustainable trail design and construction techniques (meandering trail segments, outslope, rolling grade dips, etc.) within the existing trail corridor to minimize the volume and velocity of water flowing on the trail tread. 

- Explore potential trail alignment and infrastructure options to take advantage of an excellent long-range view of the mountains north of Campbells Trace near the terminus of trail sections one and two. 

- Create construction specifications for the trail alignment and trail crosssection detail. 

- Evaluate condition of wooden footbridge to determine long-term viability and potential recommendations for repair, replacement, and/or maintenance. 

- Assess crossings of Campbell Trace, Hully Gully Drive, and NC 126 relative to the existing trail alignment and easement to confirm appropriate locations for safety and visibility. 

- Engage with the POA and NCDOT Division 13 to formalize road crossings and provide recommendations in line with NCDOT Pedestrian Crossing Treatment Evaluation Guidance (signage, pavement markings, etc.). 

- Coordinate with NCDOT for NC 126 crossing - survey, engineered specifications, encroachment permitting, and traffic control plans. 

- After an in-depth field review, we believe we can stay fully within the existing corridor, but if we find it necessary to alter the corridor, we will develop appropriate relationships and provide coordination with the Property Owners Association. 

**Typical Trail Conditions** 

**Section 1 Bridge** 

**View from terminus of Section 1** 

08 

~~**Packet Pg. 177**~~
{8}------------------------------------------------
**6.3.d** 

## SECTION 2: NEW CONSTRUCTION OF 2.2 MILES FROM 1780 NEIGHBORHOOD THROUGH THE ENCLAVE 

## **KEY FACTS:** 

- A small section of constructed trail extends from the terminus of Section 1, changing from a gravel tread to a natural surface trail as it enters the woodline. There are sections of old trail and roadbed within the parcel that could be connected to simplify construction. 

- Determine easement location and acquire survey for gap between the end of section one and existing easement in The Enclave development. 

- Evaluate existing utilities (septic drain fields, etc.) within the easement areas and the feasibility to avoid them with the proposed trail alignment. 

- Determine the most feasible trail alignment within the proposed and existing easements employing sustainable trail design and construction techniques (meandering trail segments, outslope, rolling grade dips, etc.). 

- Explore potential trail alignment and infrastructure options to take advantage of an excellent longrange view of the mountains north of Campbell Trace near the terminus of trail sections one and two. 

- Flag and survey the trail alignment, create construction specifications and cross-section details, and acquire any required permits. 

- Assess neighborhood road crossings relative to the existing easement to confirm appropriate locations for safety and visibility. 

- Engage with the POA to formalize road crossings and provide recommendations in line with NCDOT Pedestrian Crossing Treatment Evaluation Guidance (signage, pavement markings, etc.). 

- Coordinate with McDowell County to ensure existing easements and the proposed trail alignment will connect appropriately to planned McDowell County trail segments. 

**==> picture [541 x 162] intentionally omitted <==**

**----- Start of picture text -----**<br>
View from beginning of Section 2<br>**----- End of picture text -----**<br>


09 

~~**Packe**~~ **t Pg. 178**
{9}------------------------------------------------
**6.3.d** 

## SECTION 3: NEW CONSTRUCTION OF 0.8 MILES OF TRAIL THROUGH LAKE JAMES FAMILY CAMPING RESORT AND MARINA 

## **KEY FACTS:** 

- The route for the new trail has been flagged but there are several complicating factors that need to be addressed: wide entry road crossings to the adjacent campground, obstructions (gates, electrical panels, guard shack, campground sign, etc.), golf cart traffic, and road crossings that will need to be considered to implement this section. 

- Evaluate existing utilities (septic drain fields, electrical boxes, transmission line poles, etc.) and other obstacles within the easement areas and the feasibility to avoid them with the proposed trail alignment. Creative solutions including engineered trail segments, trail rerouting, and landscaping will be considered. A 65 foot setback requirement from the lake is noted. 

- Evaluate the existing flagged trail centerline and determine the most feasible trail alignment within the proposed existing easement employing sustainable trail design and construction techniques (meandering trail segments, outslope, rolling grade dips, etc.). 

- Create construction specifications for the trail alignment and trail cross-section detail. 

- Assess crossings of Benfield’s Landing Road and internal campground roads relative to the existing flagged trail centerline and trail easement to confirm appropriate locations for safety and visibility. Consider golf cart access to the crossings and a secondary golf cart path in some areas. 

- Engage with NCDOT Division 13 and campground owners/management to formalize road crossings and provide recommendations in line with NCDOT Pedestrian Crossing Treatment Evaluation Guidance (signage, pavement markings, traffic control plans, etc.). 

- Coordinate with NCDOT for Benfield’s Land Road crossings - survey, engineered specifications, rapid flash beacon locations, encroachment permitting, and traffic control plans. 

**==> picture [541 x 202] intentionally omitted <==**

**----- Start of picture text -----**<br>
Road Crossing Section 3<br>**----- End of picture text -----**<br>


10 

~~**Packet Pg. 179**~~
{10}------------------------------------------------
**6.3.d** 

## Relevant Experience 

## 

BIKE START 

**==> picture [225 x 141] intentionally omitted <==**

**----- Start of picture text -----**<br>
EXERCISE STATION  FISHING PIER<br>(6 TOTAL) LAKESIDE<br>DISC GOLF START LOOKOUT<br>PUMP TRACKBICYCLE  GRAVEL FINES, MULTI-USE TRAIL TO NOBLE KNOB<br>BI-LEVEL,<br>NATURAL<br>ORIENTATION & DONOR VISITOR  OPEN GREEN PICNIC AREA PLAYGROUND<br>RECOGNITION LARGE COVERED  RESTROOMS<br>PAVILION<br>PARK  NOBLE KNOB<br>ENTRANCE<br>ho DOG PARK<br>(+/- 1 ACRE)<br>123 PARKING SPACES TOTAL<br>0 40 80 120 160<br>L��� R ��is� D����<br>**----- End of picture text -----**<br>


## **VALDESE LAKESIDE PARK** 

_Park Master Plan, Engineering, Permitting, and Construction Administration_ 

DbD led the planning and design efforts on behalf of the Town of Valdese to develop the master plan for Valdese Lakeside Park, a 300-acre park adjacent to Lake Rhodhiss. The park design features a critical mix of local and regional recreation facilities that will effectively attract a variety of user groups, including a 7.5-mile mountain bike trail system, 18-hole disc golf course, greenway trails, dog park, picnic facilities, and more. The project was complete on time and within budget in fall 2021. 

## **PROJECT INFORMATION** 

- Year: 2019-2021 

   - Reference: Beth Heile | Friends of Valdese Rec | (828) 390-6870 

- Role: Prime | Project Manager: Alex Gotherman, RLA 

- Permitting was delayed but delivered on budget. 

11 

~~**Packe**~~ **t Pg. 180**
{11}------------------------------------------------
**6.3.d** 

**==> picture [514 x 240] intentionally omitted <==**

## **FONTA FLORA NORTH CAROLINA STATE TRAIL** 

## _Regional Trail Master Plan & Implementation_ 

DbD has completed FFST master plans for multiple trail sections and a custom facility design manual for all signs and recreation support facilities. DbD developed engineered plans, obtained permits, and oversaw construction of the Burke County/ Lake James trailhead. This project was completed in 2018. 

## **PROJECT INFORMATION** 

- Year: 2017-2018 

   - Reference: Sara Chabaan | Planner and Trails Specialist | Burke County, NC | (828) 439-4362 

   - • Delivered on time and on budget. 

- Role: Prime | Project Manager: Alex Gotherman, RLA 

**==> picture [335 x 186] intentionally omitted <==**

**==> picture [167 x 175] intentionally omitted <==**

**==> picture [167 x 269] intentionally omitted <==**

12 

~~**Packet Pg. 181**~~
{12}------------------------------------------------
**6.3.d** 

**==> picture [546 x 337] intentionally omitted <==**

**----- Start of picture text -----**<br>
LEGEND<br>PROPOSED GREENWAY<br>EXISTING CONTOURS (2 FT)<br>PARCELS<br>LAKE JAMES<br>FINALEE DR<br>N POWERHOUSE RD<br>N POWERHOUSE RD<br>SHEET 3<br>SHEET 4<br>E SHORES DR<br>HARRIS WHISNANT RD<br>LAUREL RIDGE CT<br>LINVILLE AVE<br>COTTAGE PARK DR<br>SHEET 2 HARBOR VIEW TERRACE<br>ST PAULS CHURCH RD<br>BOYD MOORE AVE<br>GEORGIA PINES RD<br>NORTH<br>INVERNESS DR<br>KIRBY DR<br>CANTERBURY PL<br>COBB AVE<br>NC-126<br>SHEET 5<br>**----- End of picture text -----**<br>


## **FONTA FLORA TRAIL-NORTH POWERHOUSE AND COBB ROADS SIDEWALK (EB-5827) - BURKE COUNTY, NC** 

Kimley-Horn was selected to provide engineering Our team provided project coordination, public and design services for approximately 2.5 miles of a involvement, North Carolina Department of 10-foot-wide asphalt multiuse path in Burke County. Transportation (NCDOT) coordination, right-ofThe path parallels Powerhouse Road (Laurel Ridge way (ROW) negotiation and acquisition, National Court to Cobb Avenue) before going west on Cobb Environmental Policy Act (NEPA) documentation, Avenue and reaching Harris Whisnant Road. The environmental permits, geotechnical investigations, construction for this trail segment of the Lake James preliminary path design, grading and drainage plans, Loop will connect the Bridgewater Trailhead to the pavement marking and signage plans, landscaping Harris Whisnant Trailhead, as outlined in the Fonta and placemaking, retaining wall design, and final path Flora State Trail Lake James Section Master Plan. design. 

Our team provided project coordination, public involvement, North Carolina Department of Transportation (NCDOT) coordination, right-ofway (ROW) negotiation and acquisition, National Environmental Policy Act (NEPA) documentation, environmental permits, geotechnical investigations, preliminary path design, grading and drainage plans, pavement marking and signage plans, landscaping and placemaking, retaining wall design, and final path design. 

## **PROJECT INFORMATION** 

## **PROJECT INFORMATION** 

- Year: 2019-2022 

- Year: 2019-2022 

- On Time and Within Budget: This project was canceled due to funding constraints, but the 30% design was delivered on time and within budget. 

due to funding constraints, 

- Role: Prime | Project Manager: Alex McIntyre, P.E. 

- Reference: Shane Prisby, Trails Program Director | Foothills Conservancy of NC| (828) 437-9930 

13 

~~**Packe**~~ **t Pg. 182**
{13}------------------------------------------------
**6.3.d** 

**==> picture [287 x 24] intentionally omitted <==**

## Burke County Trail Design and Engineering RFQ-2024-0306 

## GENERAL INFORMATION 

## Firm Information 

Destination by Design, 136 Furman Rd Ste 6, Boone, NC 28607 

828-386-1866 

## Firm Overview 

DbD is a multi-disciplinary economic development firm comprised of experienced local government planners, engineers, urban designers, and communication experts. We collaborate to plan, develop, brand, and promote destination-quality recreation and tourism assets. We have a dedicated team of 22 talented professionals (7 planning, 8 design & engineering, 7 communications) who focus on creating both inspiring built-environments as well as compelling place brands. 

## Resumes 

**==> picture [83 x 90] intentionally omitted <==**

## Alex Gotherman, PLA Design Director 

With over a decade of experience in the design and development of compelling public projects, Alex’s passion lies at the interface of urban and rural planning, conservation, and placemaking. Using place-based sustainable design techniques, He has worked on a wide variety of projects including major parks, greenways, river accesses, and downtown streetscapes. Alex’s leadership is central to DbD’s “design-first” philosophy. This ensures that our civil engineering and landscape architecture teams execute the highest level of placemaking within the final construction document package. 

## Relevant Experience 

- **»** Burke County Park trailhead design and construction documents. Create the FFST Facility Design Manual. 

- **»** Valdese Lakeside Park and Greenway - Design lead, lead on construction document package for trailhead and greenway, Burke County. 

- **»** Overmountain Victory State Trail -- Roaring River Park and OVST Site Master Plan, Wilkes County 

- **»** Fonta Flora Trailhead -- Lead Designer, McDowell County 

- **»** Greenway design; Created Facility Design Manual, Watauga County 

- **»** Middle Fork Greenway 

14 

~~**Packet Pg. 183**~~
{14}------------------------------------------------
**6.3.d** 

**==> picture [69 x 25] intentionally omitted <==**

## Resumes 

**==> picture [83 x 92] intentionally omitted <==**

## Jason Gaston 

## Civil Engineer 

Jason leads the Destination by Design Engineering team and has more than fifteen years of experience as a civil engineer. He has worked extensively in both the public and private realms, including site engineering for downtown streetscapes, greenways, public parks and an array of private development throughout the southeast. 

## Relevant Experience 

- **»** Fonta Flora State Trail -- Burke County Park, Civil Engineering, Burke County 

- **»** Valdese Lakeside Park and Greenway -- Civil Engineering, Burke County 

- **»** Lenoir Greenway -- Civil Engineering, Caldwell County 

- **»** Middle Fork Greenway -- Civil Engineering, Watauga County 

- **»** Fonta Flora Trailhead -- Civil Engineering, McDowell County 

**==> picture [80 x 93] intentionally omitted <==**

## Tim Johnson 

## Director of Outdoor Recreation Planning 

With over fifteen years working for the public sector and twenty years of experience in the parks and recreation field, Tim’s interests include open space preservation, transportation planning with a pedestrian focus, and regional park, trail, and greenway development.  Tim has extensive experience in meeting facilitation and public engagement collaborating with a diverse range of project partners and stakeholders. He has a passion for tourism-related economic development in rural communities and assists with infrastructure development, project implementation, and successful grant funding strategies. 

## Relevant Experience 

- **»** Fonta Flora State Trail Design, Layout, and Construction Project Management (when formerly employed with Burke County), Burke County, NC 

- **»** Palmetto Hiking Trail Design and Layout - Gap Creek Property, The Nature Conservancy, SC State Parks, and the Palmetto Conservation, Jones Gap State Park, SC 

- **»** Appalachian Natural Space Hiking Trail Design, Layout, and Construction Project Management, Boone, NC 

- **»** Crab Orchard Falls Hiking Trail Design, Layout, and Construction Management, Valle Crucis, NC 

15 

~~**Packe**~~ **t Pg. 184**
{15}------------------------------------------------
**6.3.d** 

**==> picture [118 x 24] intentionally omitted <==**

## Burke County Trail Design and Engineering RFQ-2024-0306 

## GENERAL INFORMATION 

## Firm Information 

200 South Tryon Street, Suite 200 Charlotte, NC 

704 333 5131 

## Firm Overview 

Kimley-Horn is a national planning and design consulting firm that specializes in transportation and urban design. 

Founded in 1967, Kimley-Horn has more than 7,400 employees that serves a range of clients across many disciplines from 120+ offices nationwide, including eight across North and South Carolina. Our multidisciplinary experience covers a wide range of services within transportation planning and engineering, landscape architecture and urban design, and environmental planning and design. 

Our team experience includes integrated trail planning, community engagement, market economic impact analysis, permitting, hydraulic design, and stream and wetland delineation. Kimley-Horn has the expertise to develop multiuse trail designs that integrate with urban development, respect hydraulic constraints, and adhere to floodplain development permitting requirements. 

## Resumes 

**==> picture [83 x 90] intentionally omitted <==**

## Alex McIntyre, P.E. Roadway Engineer 

Alex has 7 years of roadway engineering and design experience, including various greenway, trail, sidewalk, and multiuse paths. She specializes in drain design, storm drainage design, Americans with Disabilities Act (ADA) and Public Right-of-Way Accessibility Guidelines (PROWAG) standards, permit coordination, public involvement, and bicycle/pedestrian planning. Alex has been instrumental in completing preliminary multiuse trail layout and planning, final trail design, hydraulic design, and working through complicated stormwater and environmental permits for numerous trail projects. 

## Relevant Experience 

- **»** Fonta Flora State Trail—North Powerhouse and Cobb Roads Sidewalk, Burke County, NC 

- **»** Briar/Little Hope Greenway, Mecklenburg County, NC 

- **»** Cross Charlotte Trail, Charlotte, NC 

- **»** Pineville Greenway Connection, Pineville, NC 

- **»** Stewart Creek, Tributary 2 Greenway, Mecklenburg County, NC 

- **»** McDowell Creek Greenway, Mecklenburg County, NC 

- **»** Concord Greenways and Connectivity Project, Concord, NC 

16 

~~**Packet Pg. 185**~~
{16}------------------------------------------------
**6.3.d** 

**==> picture [118 x 24] intentionally omitted <==**

## Resumes 

**==> picture [83 x 90] intentionally omitted <==**

## Jason Claudio-Diaz, P.E., CFM 

## Surface Water Engineer 

Jason offers 19 years of experience as a water resources engineer who manages numerous storm water watershed projects such as drainage modeling and design, stream restoration, and best management practices (BMPs) for water quality and quantity. He is one of the driving forces behind the firm’s growing storm water practice. Jason has been involved in all aspects of urban and rural watershed projects, including feasibility and planning, permitting, public involvement, modeling, design, and construction management. In addition, he has provided drainage, dam design, and site storm water planning and design services for various municipal clients. 

## Relevant Experience 

- **»** Cross Charlotte Trail, Charlotte, NC 

- **»** Briar/Little Hope Greenway, Mecklenburg County, NC 

- **»** Stewart Creek, Tributary 2 Greenway, Mecklenburg County, NC 

- **»** Pineville Greenway Connection, Pineville, NC 

- **»** McDowell Creek Greenway, Mecklenburg County, NC 

- **»** Concord Greenways and Connectivity Project, Concord, NC 

- **»** Walker Branch Greenway, Mecklenburg County, NC 

- **»** Little Sugar Creek Greenway, Mecklenburg County, NC 

**==> picture [83 x 90] intentionally omitted <==**

## Elizabeth Clever, E.I. 

## Roadway Analyst 

Elizabeth is a roadway analyst with experience in greenway, roadway, and storm water design. She has been involved in multiple greenway projects throughout the region with strong experience in trail design, storm drainage design, and cost estimation. Elizabeth holds a degree in Civil Engineering from the University of Alabama, which helps her efficiently problem solve and determine creative solutions to accommodate for complex design constraints. 

## Relevant Experience 

- **»** Fonta Flora State Trail—North Powerhouse and 

   - Cobb Roads Sidewalk, Burke County, NC 

- **»** Cross Charlotte Trail, Charlotte, NC 

- **»** McDowell Creek Greenway, Mecklenburg County, NC 

- **»** Stewart Creek, Tributary 2 Greenway, Mecklenburg County, NC 

- **»** Swift Creek Greenway, Design Phase 1, Wake County, NC 

- **»** Briar/Little Hope Greenway, Mecklenburg Coutny, NC 

- **»** Greenville Swamp Rabbit Trail (SRT) Legacy Connector, Greenville, SC 

17 

~~**Packe**~~ **t Pg. 186**
{17}------------------------------------------------
**6.3.d** 

## Organizational Chart 

**==> picture [399 x 224] intentionally omitted <==**

**----- Start of picture text -----**<br>
DESTINATION BY DESIGN<br>ALEX GOTHERMAN, RLA<br>KIMLEY-HORN<br>Design Director<br>ALEX MCINTYRE, P.E.<br>TIM JOHNSON<br>Roadway Engineer<br>Outdoor Planning Director<br>JASON CLAUDIO-DIAZ, P.E., CFM<br>JASON GASTON, PE Surface Water Engineer<br>Civil Engineer<br>ELIZABETH CLEVER, E.I.<br>Roadway Analyst<br>**----- End of picture text -----**<br>


## Project Timeline 

While the actual timeline may vary, our goal is to complete the project within the proposed schedule below. We are dedicated to adhering to the budget and project deadline, which working closely with Burke County to make any necessary adjustments. 

**==> picture [538 x 217] intentionally omitted <==**

**----- Start of picture text -----**<br>
Month<br>One Two Three Four Five Six Seven<br>TASK 1: DISCOVERY, ANALYSIS,<br>AND PRELIMINARY TRAIL<br>ALIGNMENT<br>TASK 2: CONSTRUCTION SPECIFICATIONS AND FINAL BID<br>PACKAGE<br>**----- End of picture text -----**<br>


## Declaration 

Destination by Design declares there have been no pending or settled lawsuits or professional liability claims within the last 10 years. 

**==> picture [997 x 19] intentionally omitted <==**

**----- Start of picture text -----**<br>
Packet Pg. 187<br>**----- End of picture text -----**<br>


18
{18}------------------------------------------------
**6.3.d** 

19 

~~**Packe**~~ **t Pg. 188**
{19}------------------------------------------------
**6.3.d** 

OUR VISION IS TO ENHANCE QUALITY OF LIFE, PROMOTE ECONOMIC DEVELOPMENT, AND CULTIVATE HEALTHIER COMMUNITIES. 

**==> picture [49 x 50] intentionally omitted <==**

**==> picture [46 x 46] intentionally omitted <==**

**==> picture [32 x 45] intentionally omitted <==**

**==> picture [54 x 44] intentionally omitted <==**

PLACE TOURISM DOWNTOWN RECREATION BRANDING DEVELOPMENT REVITALIZATION MASTER PLANNING 

**==> picture [46 x 46] intentionally omitted <==**

**==> picture [46 x 46] intentionally omitted <==**

GREENWAYS LAND USE & TRAILS PLANNING 

**==> picture [103 x 44] intentionally omitted <==**

**Packet Pg. 189**