{0}------------------------------------------------
**7.4.a** 

# Jonas Ridge - Conceptual Plan Phase 2 

Prepared for Burke County Morganton, North Carolina March 2024 

**Packet Pg. 119**
{1}------------------------------------------------
**7.4.a** 

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [1045 x 792] intentionally omitted <==**

**----- Start of picture text -----**<br>
LEGEND<br>PRIMARY PATH (PAVED -<br>UNIVERSAL ACCESS)<br>SECONDARY PATH (UNPAVED)<br>PINE<br>WETLAND CROSSING<br>FOREST<br>PAVILION<br>BENCH<br>PLATFORM / STRUCTURE<br>PICNIC AREA<br>WETLAND<br>DOG  MEADOW PARK KIOSK<br>PARK<br>EXISTING TREE<br>CANOPY EXTENTS<br>OPEN<br>SPACE<br>WETLAND TYP.<br>MAIN  PINE<br>BLDG FOREST<br>FOREST<br>OBSERVATION  CRANBERRY<br>ISLAND BOG<br>CRANBERRY<br>BOG<br>MEADOW<br>N<br>0’ 60’ 120’ 240’<br>**----- End of picture text -----**<br>


OVERALL CONCEPT PLAN 

2 | J O N A S  R I D G E  P H A S E  2 

**Packet Pg. 120**
{2}------------------------------------------------
**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [1075 x 792] intentionally omitted <==**

**----- Start of picture text -----**<br>
7.4.a<br>PROS<br>LEGEND<br>• durable surface<br>• accessible<br>PRIMARY PATH (PAVED -<br>• low maintenance<br>UNIVERSAL ACCESS)<br>SECONDARY PATH (UNPAVED)<br>CONS<br>PINE<br>WETLAND CROSSING<br>FOREST<br>• more intensive<br>ALT: ADD<br>PAVILION installation than natural<br>DISC GOLF<br>surface<br>COURSE<br>BENCH • not permeable<br>PLATFORM / STRUCTURE<br>PICNIC AREA<br>ASPHALT ACCESSIBLE PATH ($)<br>DOG  MEADOW PARK KIOSK<br>PARK<br>EXISTING TREE  PROS<br>CANOPY EXTENTS<br>OPEN • durable surface<br>SPACE • accessible<br>• permeable<br>CONS<br>WETLAND TYP. • more intensive<br>installation than natural<br>surface<br>MAIN  PINE<br>BLDG FOREST • more expensive than<br>asphalt<br>• requires removal of<br>sediment over time<br>ALT: POROUS PAVE ACCESSIBLE PATH ($$)<br>PROS<br>• recreational amenity<br>• utilizes natural surface<br>trail<br>OBSERVATION  CRANBERRY<br>ISLAND BOG CONS<br>• expense of equipment<br>CRANBERRY<br>BOG<br>ALT: DISC GOLF COURSE ($)<br>N<br>0’ 60’ 120’ 240’<br>Packet Pg. 121<br>Attachment: J.R. Concept  (4373 : Comm. Dev. - Jonas Ridge Cranberry Bog Park Master Plan PARTF Grant - Public Hearing - 6:00 P.M.)<br>**----- End of picture text -----**<br>


NORTH WOODS LOOP 

3 | J O N A S  R I D G E  P H A S E  2
{3}------------------------------------------------
**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [1069 x 792] intentionally omitted <==**

**----- Start of picture text -----**<br>
7.4.a<br>PROS<br>LEGEND<br>• provides flexible use<br>area to local residents for<br>PRIMARY PATH (PAVED -<br>activities and events<br>UNIVERSAL ACCESS)<br>• suitable over septic<br>SECONDARY PATH (UNPAVED)<br>CONS<br>PINE<br>WETLAND CROSSING<br>FOREST<br>• mowing required<br>PAVILION<br>BENCH<br>PLATFORM / STRUCTURE<br>PICNIC AREA<br>OPEN SPACE ($)<br>MEADOW PARK KIOSK<br>DOG PARK<br>(ALT OPEN<br>SPACE) EXISTING TREE  PROS<br>OPEN  CANOPY EXTENTS<br>SPACE • provides amenity to local<br>(ALT  residents<br>MEADOW) • localizes dog waste<br>• suitable over septic<br>CONS<br>WETLAND TYP. • fence requires<br>maintenance<br>MAIN  PINE  • mowing required<br>BLDG FOREST • waste management<br>required<br>DOG PARK ($$)<br>PROS<br>• maintains natural<br>condition<br>• attracts pollinators and<br>wildlife for a balanced<br>OBSERVATION  CRANBERRY  ecosystem<br>ISLAND BOG<br>CONS<br>• new meadow along path<br>would require 3+ years to<br>establish<br>CRANBERRY<br>BOG<br>ALT: ALL MEADOW WITHIN LOOP ($$)<br>N<br>0’ 60’ 120’ 240’<br>Packet Pg. 122<br>Attachment: J.R. Concept  (4373 : Comm. Dev. - Jonas Ridge Cranberry Bog Park Master Plan PARTF Grant - Public Hearing - 6:00 P.M.)<br>**----- End of picture text -----**<br>


MEADOW / OPEN SPACE 

4 | J O N A S  R I D G E  P H A S E  2
{4}------------------------------------------------
**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [1069 x 792] intentionally omitted <==**

**----- Start of picture text -----**<br>
7.4.a<br>PROS<br>LEGEND<br>• inexpensive<br>• natural material<br>PRIMARY PATH (PAVED -<br>UNIVERSAL ACCESS)<br>SECONDARY PATH (UNPAVED)<br>CONS<br>PINE<br>WETLAND CROSSING<br>FOREST<br>• potential lack of trail<br>PAVILION delineation in some areas<br>BENCH<br>PLATFORM / STRUCTURE<br>PICNIC AREA<br>NATURAL SURFACE / MOWED PATH ($)<br>DOG  MEADOW PARK KIOSK<br>PARK<br>EXISTING TREE  PROS<br>CANOPY EXTENTS<br>OPEN • creates level surface<br>SPACE • natural aesthetic<br>CONS<br>WETLAND TYP. • possible need to replace<br>or refresh granite fines<br>MAIN  PINE  • more expensive<br>BLDG FOREST<br>DECOMPOSED GRANITE ($$)<br>OBSERVATION  CRANBERRY<br>ISLAND BOG<br>CRANBERRY<br>BOG<br>N<br>0’ 60’ 120’ 240’<br>Packet Pg. 123<br>Attachment: J.R. Concept  (4373 : Comm. Dev. - Jonas Ridge Cranberry Bog Park Master Plan PARTF Grant - Public Hearing - 6:00 P.M.)<br>**----- End of picture text -----**<br>


SECONDARY PATH 

5 | J O N A S  R I D G E  P H A S E  2
{5}------------------------------------------------
**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [1069 x 792] intentionally omitted <==**

**----- Start of picture text -----**<br>
7.4.a<br>PROS<br>LEGEND<br>• inexpensive<br>• moveable if needed<br>PRIMARY PATH (PAVED -<br>• natural material<br>UNIVERSAL ACCESS)<br>• easy to replace segments<br>SECONDARY PATH (UNPAVED)<br>CONS<br>PINE<br>WETLAND CROSSING<br>FOREST<br>• may degrade faster<br>PAVILION that other options due to<br>contact with ground and<br>BENCH water<br>PLATFORM / STRUCTURE<br>PICNIC AREA<br>PUNCHEON ($)<br>DOG  MEADOW PARK KIOSK<br>PARK<br>EXISTING TREE  PROS<br>CANOPY EXTENTS<br>OPEN • out of water<br>SPACE • more durable than<br>puncheon<br>• natural material<br>CONS<br>WETLAND TYP. • may require some<br>maintenance of wood over<br>time<br>MAIN  PINE<br>• more intensive<br>BLDG FOREST<br>construction requirements<br>WOOD BOARDWALK ($$)<br>PROS<br>• most durable<br>• smooth finishes available<br>• grated surface allows<br>vegetation to grow below<br>OBSERVATION  CRANBERRY<br>ISLAND BOG CONS<br>• most expensive<br>• more intensive<br>construction requirements<br>CRANBERRY<br>BOG<br> FIBERGLASS BOARDWALK ($$$)<br>N<br>0’ 60’ 120’ 240’<br>Packet Pg. 124<br>Attachment: J.R. Concept  (4373 : Comm. Dev. - Jonas Ridge Cranberry Bog Park Master Plan PARTF Grant - Public Hearing - 6:00 P.M.)<br>**----- End of picture text -----**<br>


WETLAND CROSSING 

6 | J O N A S  R I D G E  P H A S E  2
{6}------------------------------------------------
**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [1069 x 792] intentionally omitted <==**

**----- Start of picture text -----**<br>
7.4.a<br>PROS<br>LEGEND<br>• less expensive<br>• moveable if needed<br>PRIMARY PATH (PAVED -<br>• natural material<br>UNIVERSAL ACCESS)<br>SECONDARY PATH (UNPAVED)<br>CONS<br>PINE<br>WETLAND CROSSING<br>FOREST<br>• may wear faster that<br>PAVILION other materials<br>BENCH WOODEN BENCHES ($)<br>PLATFORM / STRUCTURE<br>PROS<br>PICNIC AREA<br>• less expensive<br>DOG  MEADOW PARK KIOSK • durable<br>PARK • lightweight, moveable<br>EXISTING TREE  options available<br>CANOPY EXTENTS • recycled material<br>OPEN<br>SPACE CONS<br>• may fade in sun<br>• could get hot in sun<br>RECYCLED PLASTIC BENCHES ($)<br>WETLAND TYP.<br>PROS<br>MAIN  PINE<br>BLDG FOREST • durable<br>• smooth finishes available<br>CONS<br>• heavy - not moveable<br>CONCRETE BENCHES ($$)<br>PROS<br>OBSERVATION  CRANBERRY<br>ISLAND BOG • durable<br>• lightweight, moveable<br>options available<br>CONS<br>CRANBERRY<br>• most expensive<br>BOG<br>• could get hot in sun<br>COATED METAL BENCHES ($$$)<br>N<br>0’ 60’ 120’ 240’<br>Packet Pg. 125<br>Attachment: J.R. Concept  (4373 : Comm. Dev. - Jonas Ridge Cranberry Bog Park Master Plan PARTF Grant - Public Hearing - 6:00 P.M.)<br>**----- End of picture text -----**<br>


BENCHES 

7 | J O N A S  R I D G E  P H A S E  2
{7}------------------------------------------------
**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [1069 x 792] intentionally omitted <==**

**----- Start of picture text -----**<br>
7.4.a<br>PROS<br>LEGEND<br>• less expensive<br>• moveable if needed<br>PRIMARY PATH (PAVED -<br>• natural material<br>UNIVERSAL ACCESS)<br>SECONDARY PATH (UNPAVED)<br>CONS<br>PINE<br>WETLAND CROSSING<br>FOREST<br>• may wear faster that<br>PAVILION other materials<br>BENCH WOODEN PICNIC TABLES ($)<br>PLATFORM / STRUCTURE<br>PROS<br>PICNIC AREA<br>• less expensive<br>DOG  MEADOW PARK KIOSK • moveable options if<br>PARK needed<br>EXISTING TREE  • recycled material<br>CANOPY EXTENTS<br>OPEN CONS<br>SPACE<br>• may fade in sun<br>• could get hot in sun<br>RECYCLED PLASTIC PICNIC TABLES ($)<br>WETLAND TYP.<br>PROS<br>MAIN  PINE<br>BLDG FOREST • durable<br>• smooth finishes available<br>CONS<br>• heavy - not moveable<br>CONCRETE PICNIC TABLES ($$)<br>PROS<br>OBSERVATION  CRANBERRY<br>ISLAND BOG • durable<br>• moveable options<br>available<br>CONS<br>CRANBERRY<br>• most expensive<br>BOG<br>• could get hot in sun<br>COATED METAL PICNIC TABLES ($$$)<br>N<br>0’ 60’ 120’ 240’<br>Packet Pg. 126<br>Attachment: J.R. Concept  (4373 : Comm. Dev. - Jonas Ridge Cranberry Bog Park Master Plan PARTF Grant - Public Hearing - 6:00 P.M.)<br>**----- End of picture text -----**<br>


PICNIC AREAS 

8 | J O N A S  R I D G E  P H A S E  2
{8}------------------------------------------------
**7.4.a** 

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [12 x 792] intentionally omitted <==**

**==> picture [13 x 792] intentionally omitted <==**

**==> picture [917 x 792] intentionally omitted <==**

**----- Start of picture text -----**<br>
LEGEND<br>PRIMARY PATH (PAVED -<br>UNIVERSAL ACCESS)<br>SECONDARY PATH (UNPAVED)<br>PINE<br>WETLAND CROSSING<br>FOREST<br>PAVILION<br>BENCH<br>VIEWING PLATFORM<br>PLATFORM / STRUCTURE<br>PICNIC AREA<br>DOG  MEADOW PARK KIOSK<br>PARK<br>EXISTING TREE<br>CANOPY EXTENTS<br>OPEN<br>SPACE<br>BIRD BLIND<br>WETLAND TYP.<br>VIEWING PLATFORMS<br>MAIN  PINE<br>BLDG FOREST<br>PAVILION<br>OBSERVATION  CRANBERRY<br>ISLAND BOG BIRD BLIND W/ SEATING<br>CRANBERRY<br>BOG<br>PARK KIOSK<br>N<br>0’<br>**----- End of picture text -----**<br>


**==> picture [199 x 47] intentionally omitted <==**

**----- Start of picture text -----**<br>
N<br>0’ 60’ 120’ 240’<br>**----- End of picture text -----**<br>


ADDITIONAL FEATURES 

9 | J O N A S  R I D G E  P H A S E  2 

**Packet Pg. 127**
{9}------------------------------------------------
**==> picture [1138 x 691] intentionally omitted <==**

**----- Start of picture text -----**<br>
7.4.a<br>Description Allowance  Cost Description Allowance  Cost<br>MIKHAIL BUILDERS  Permits- Building, Mechanical, Electrical,  $1,200.00 Drywall- moisture board as needed, hang,  $11,450.00<br>65 MERRIMON<br>Gas, Zoning, Stormwater mud, sand,<br>AVE,#1200<br>ASHEVILLE, NC. 28801  Architecural-Design, Engineering,  Paint- interior walls, celling, doors,trim / $16,400.00<br>Surveys Dumpster,Toilet  exterior facia & soffit<br>ESTIMATE   Site Work- Install double wire silt fence  $1,800.00 Railing- For Ramp and Stairs. $8,000.00<br>around perimeter per code.<br>Exterior  windows& Doors. Aluminum  $25,000.00<br>Demolition- wall panels/ceiling,windows,  $11,500.00 clad, wood interior<br>Cranberry Bog House  Doors. plumbing&electrical pipes/wiring,<br>hvac ducts, Þxtures, ßoor surfaces,  Install exterior/interior Doors +Windows   $2,800.00<br>shingles. Hauling<br>Plumbing all drops  $13,000.00 Framing- Ramp, Exterior/interior Steps,  $27,000.00<br>Install beams, headers, walls,Sheathing<br>Sinks, Toilets, Urinals, Soap Dispensers,  and OSB, subßoor, Sleepers as needed,<br>WH, Sewer/WaterTap.   replace/patch Throughout, New roof<br>sheathing, replace rafters were obligatory<br>Electrical- New Panel, Receptacles,,  $16,850.00<br>Switches, Can lights, Sconce,  Exterior  Materials- 2x's, LVL's, Flashing, hangers,<br>lights,(ßood/Landscaping Lights Etc..) Per  bolts,speciality fasteners,OSB,  subßoor,<br>NC Code  glue, screws, galvanized nails, seam<br>tape, window tap, tyvek, sill seal,<br>HVAC-Per NC code $21,760.00<br>hurricane ties, h-clips, anchors<br>Siding - vented soffit, facia, ßashing $9,650.00 RooÞng- Felt underlayment. Metal   $16,000.00<br>Gutters-6" Half round  , downspout,  $7,200.00 Rock Siding- patch as need walls and  $6,000.00<br>ßange, corrugated pipe lines to drain  walking surfaces. Self-leveling where<br>Cabinets  $7,600.00 necessary,<br>Subtotal  227,560<br>CounterTops $5,200.00<br>GC Fee  40,000<br>Main Floor- commercial grade vinyl  $4,550.00<br>Total Construction Cost 267,560<br>Main Floor- toilet& urinal partitions  $3,800.00<br>FIRST FLOOR CONCEPTUAL SKETCH<br>2nd Floor Stairs and Work Rooms- leave<br>as is<br>Interior Trim/Doors $3,500.00<br>Insulation-spray foam, attic $7,300.00<br>SECOND FLOOR CONCEPTUAL SKETCH ALT: REPLACE BUILDING WITH PAVILION / RESTROOM COMBO<br>Attachment: J.R. Concept  (4373 : Comm. Dev. - Jonas Ridge Cranberry Bog Park Master Plan PARTF Grant - Public Hearing - 6:00 P.M.)<br>**----- End of picture text -----**<br>


**==> picture [14 x 646] intentionally omitted <==**

**----- Start of picture text -----**<br>
Attachment: J.R. Concept  (4373 : Comm. Dev. - Jonas Ridge Cranberry Bog Park Master Plan PARTF Grant - Public Hearing - 6:00 P.M.)<br>**----- End of picture text -----**<br>


BUILDING IMPROVEMENT SCENARIOS 

10 | J O N A S  R I D G E  P H A S E  2 

**Packet Pg. 128**
