# **Burke County Cooperative Water Board Meeting – Minutes** 

# **March 19, 2024** 

**Members Present:** 

John Leger – Rutherford College Robert Turner – Brentwood Kevin Clark – Brentwood Glenn McCurry – Brentwood Will Dennis – Rhodhiss Rick Justice - Rhodhiss David Wortman – Rhodhiss Mark Delehant – Burke County Beryl Cook – Burke County 

## **Members Absent:** 

Johnnie Carswell – Burke County Bruce Byrd – Brentwood Water Bryan Williams – Brentwood Water Kendall Powell – Brentwood Water Steve Whisenant – Brentwood Water Brad Boris – Morganton Reymond Presley – Morganton Brian Tart – Burke County Eric Wilson – Valdese Jon Pons – Icard Water 

The Burke County Cooperative Water Board meeting was held on Tuesday, March19, 2024, at the Town of Rutherford College Townhall.  John Leger, President conducted the meeting. 

Listed Below is the Burke County Cooperative Water Board meeting schedule remainder for 2024. All meetings will be held at the Rutherford College Townhall, at 9:00 AM: 

May 21, 2024 July 16, 2024 September 17, 2024 November 19, 2024 

There was NOT a quorum present, therefore no official business was considered. 

Being no business to be considered, the group moved on to round table inputs by each operation present. 

## **Roundtable Discussions:** 

**Brentwood Water – Kevin Clark:** Still installing a few new taps.  We are currently painting fire hydrants in our system.  We are having a problem with the DOT contractors trimming the right-of-way damaging a fire hydrant with their bushhog.  They knock a hole in the housing causing some leakage. 

We are now seeing price increases projections from our suppliers for the third quarter 2024 into 2025 running from 8 to 15%. 

1 

**Packet Pg. 379**
{1}------------------------------------------------
**11.1.a** 

The Snowhill Church road extension project has been completed.  This project is now in service, and passage of the final inspection received.  Iron Mountain Contractors from Mountain City, TN was the contractor for this project.  Max Presswood from Lenoir NC did the installation for Iron Mountain.  They did an excellent job on this project! 

Brentwood serves approximately 4,900 customers in the western part of Burke County. 

**Town of Rhodhiss:** At the present time, we are doing routine maintenance projects to the system.  We recently had approximately 180 feet of water lines damaged and requiring replacement when DOT contractors replacing damaged guard rails hitting our line.  They punched several holes in the line. 

Rhodhiss serves approximately 400 customers. 

**Rutherford College – John Leger** :  Still replacing water meters.  Everything is currently running smoothly.  Rutherford College serves approximately 850 customers. 

**Mark Delehant – Burke County Systems:** Getting ready to begin a major meter replacement project.  Approximately 2,300 customers within our system. This will take awhile to complete this project. 

We recently replaced approximately 1,500 feet of well system piping that we tapped onto and used for period of time when this part of the system was added to our system. Buckeye Bridge from Asheville under the supervision of Eric Butler did an excellent job putting the new line in for us. 

They are looking at a future sewage system replacement project which will run approximately 3 million dollars. 

CORRECTION – 3/20/2024 (Original statement was 300 customers; should have read 2,300 customers) 

**The next meeting of the Burke County Water Board will be held on Tuesday, May 21, 2024, at 9:00 AM in the Town of Rutherford College Town Hall.  We Hope to see each of you at this next meeting.** 

Minutes Prepared by: 

Robert Turner Brentwood Water Corporation 