# CAPITAL PLANNING WORK SESSION 

Fiscal Years 2025-2029 

**==> picture [537 x 189] intentionally omitted <==**

**Packet Pg. 333**
{1}------------------------------------------------
**3.3.a** 

## **Comprehensive Capital Planning** 

**==> picture [659 x 43] intentionally omitted <==**

What is a Capital Improvement Plan? 

The capital improvement plan (CIP) outlines the County’s plans for achieving the goals, objectives, and service delivery levels desired by the Board of County Commissioners.  The purpose of this **revenues** a plan is to forecast and match **projected** nd major capital needs over a five (5) year period. Capital planning is an important management tool that strengthens the linkages between community infrastructure needs and the financial capacity of the County. 

**Packet Pg. 334** 2
{2}------------------------------------------------
## **Comprehensive Capital Planning** 

**==> picture [659 x 43] intentionally omitted <==**

**==> picture [612 x 304] intentionally omitted <==**

**----- Start of picture text -----**<br>
Structural<br>Infrastructure<br>Assessment<br>Master<br>Financing<br>Space Needs Facility  Policies<br>Planning<br>**----- End of picture text -----**<br>


**==> picture [55 x 19] intentionally omitted <==**

**----- Start of picture text -----**<br>
3.3.a<br>**----- End of picture text -----**<br>


**Packet Pg. 335** 3
{3}------------------------------------------------
**3.3.a** 

## **Comprehensive Capital Planning** 

**==> picture [659 x 43] intentionally omitted <==**

**==> picture [372 x 372] intentionally omitted <==**

**----- Start of picture text -----**<br>
Fiscal  Commitment to<br>Sustainability Investment<br>(Long Term Discipline)<br>(Affordability)<br>Participative<br>Planning<br>(Future Focused)<br>**----- End of picture text -----**<br>


**Packet Pg. 336** 4
{4}------------------------------------------------
**3.3.a** 

## **Commitment to Out Year Capital** 

**==> picture [659 x 43] intentionally omitted <==**

Impact of Out Year Operational Capital Planning: 

1.) **Manage Increasing Operational Costs:** 

A.) Utility Cost 

B.) Life Cycle Management Plan 

C.) Fleet Management 

2.) **Address Aging Infrastructure:** 

A.) Current Infrastructure is Made Up of Survivors 

• Aging • Failure Rate Increases as a Function of Age 

B.) Replace versus Repair – R.O.I. 

3.) **Formalized Resource Utilization:** 

A.) Forward-Funded Concept 

**Packet Pg. 337** 5
{5}------------------------------------------------
**3.3.a** 

## **Policy Direction** 

**==> picture [659 x 43] intentionally omitted <==**

**==> picture [834 x 279] intentionally omitted <==**

**Packet Pg. 338** 6
{6}------------------------------------------------
**3.3.a** 

**Recap from 2023 capital work session:** 

**==> picture [659 x 43] intentionally omitted <==**

 

1. Identify and Prioritize Potential Capital Project Needs 

A. Short Term………….Less Than 12 Months B. Mid-Term…………... 12 – 48 Months C. Long Term…………. More than 48 Months 

 

2. Recommendation of Capital Improvement Plan Financing Policies A. Debt Management Policies 

   - I. 10 Year Payout……………………………………………..50% II. Debt Service as a percentage of total expenditures……..….15% III. Debt to Assessed Value……………………………………2.5% 

B. Minimum Fund Balance Policy 

 

3. Identify and Prioritize Funding Sources 

4. Direct Budget Team to Develop & Present Plan for Approval to Commissioners as part of fiscal year 

2023-2024 recommended budget 

 

**Packet Pg. 339** 7
{7}------------------------------------------------
**3.3.a** 

# **Comprehensive Capital Planning** 

**==> picture [659 x 43] intentionally omitted <==**

# **Burke County’s Comprehensive Plan** 

**Packet Pg. 340** 8
{8}------------------------------------------------
**3.3.a** 

## **Multi-Year Capital Improvement Plan** 

**==> picture [659 x 43] intentionally omitted <==**

- A formal 5-year plan which identifies capital project and equipment needs, provides a planning schedule, and identifies options for funding the plan 

   - Funding, Debt Position & Policies 

• Non-Major Operational Capital 

- Major Capital & Building Stock 

Execution 

Assessing 

**==> picture [111 x 61] intentionally omitted <==**

- Understanding 

Analyzing 

**==> picture [45 x 35] intentionally omitted <==**

Planning 

**==> picture [44 x 43] intentionally omitted <==**

**Packet Pg. 341** 9
{9}------------------------------------------------
**3.3.a** 

## **Board of  Commissioners Operational Capital** 

**==> picture [659 x 43] intentionally omitted <==**

**Revenue Sources: - Prioritized in this order:** 

**Grant Funds:** The County continues to aggressively pursue state and federal grant funding and has been successful in many of these efforts. 

**Capital Reserve Funds:** The proposed funding for Capital Reserve Funds is a dedicated tax rate of 1.1 cents or approximately $1.2 MM annual re-occurring. 

**Pay-As-You-Go:** Whenever possible, pay-as-you-go funding is the preferred method of funding 

CIP projects. For large capital projects, this is not a feasible option. 

**Debt Proceeds:** Some major capital projects are best funded through bank or bond borrowings that provide for a longer term pay back.  These debt service payments would be paid from our debt service fund – which is funded through the dedicated Capital Reserve Fund. 

**Packet Pg. 342** 10
{10}------------------------------------------------
**3.3.a** 

## **Comprehensive Capital Planning** 

**==> picture [659 x 43] intentionally omitted <==**

**==> picture [334 x 356] intentionally omitted <==**

• Strengths –Very strong credit position. –Robust financial position. –Light debt and pension burden with negligible liability. –Fund balance and Cash balance as percentages of operating revenues are in-line to slightly above the US median and other Moody’s-rated counties. –Strong financial management. • Challenges –Weak socioeconomic profile, relative to the assigned rating of Aa2. –Should consider formal financing and debt management policies. –Median family income is only $55,817 (4[th] quartile) of the US level. 

**Packet Pg. 343** 11
{11}------------------------------------------------
**3.3.a** 

## **Fiscal Stewardship – Debt Portfolio** 

**==> picture [659 x 43] intentionally omitted <==**

||**Debt Item**||**Amount**|**Payoff Date**|
|---|---|---|---|---|
|CountyJail|||14,765,000.00<br>$|2037|
|Total CountyDebt|||14,765,000.00<br>$||
||||||
||||||
|Patton High School|||4,365,000.00<br>$|2026|
|Draughn High School|||4,215,000.00<br>$|2026|
|Mountain View Elementary|||15,015,000.00<br>$|2038|
|Total School Debt|||23,595,000.00<br>$||



||**Debt Item**||**Amount**|**Payoff Date**|
|---|---|---|---|---|
|CountyJail|||14,765,000.00<br>$|2037|
|Total CountyDebt|||14,765,000.00<br>$||
||||||
||||||
|Patton High School|||4,365,000.00<br>$|2026|
|Draughn High School|||4,215,000.00<br>$|2026|
|Mountain View Elementary|||15,015,000.00<br>$|2038|
|Total School Debt|||23,595,000.00<br>$||



**==> picture [334 x 25] intentionally omitted <==**

**----- Start of picture text -----**<br>
Debt Principal is 5.6% of Annual Expenditures<br>**----- End of picture text -----**<br>


**==> picture [385 x 198] intentionally omitted <==**

**----- Start of picture text -----**<br>
Annual Debt Service Budget<br> $6,000,000<br>$5,440,000<br> $5,000,000<br> $4,000,000<br> $3,000,000<br>$2,055,000<br> $2,000,000<br> $1,000,000<br> $-<br>2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035<br>**----- End of picture text -----**<br>


**Packet Pg. 344** 12
{12}------------------------------------------------
**3.3.a** 

## **Fiscal Stewardship -Ten Year Payout Policy** 

**==> picture [659 x 43] intentionally omitted <==**

**==> picture [621 x 318] intentionally omitted <==**

**----- Start of picture text -----**<br>
Ten Year Payout Percentage<br>120.0%<br>100.0%<br>100.0%<br>75.3%<br>80.0%<br>60.0%<br>40.0%<br>20.0%<br>0.0%<br>2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038<br>**----- End of picture text -----**<br>


**Packet Pg. 345** 13
{13}------------------------------------------------
**3.3.a** 

## **Fiscal Stewardship -Ten Year Payout Policy** 

**==> picture [659 x 43] intentionally omitted <==**

**==> picture [661 x 344] intentionally omitted <==**

**Packet Pg. 346** 14
{14}------------------------------------------------
**3.3.a** 

## **Comprehensive Capital Planning** 

**==> picture [659 x 43] intentionally omitted <==**

**==> picture [638 x 363] intentionally omitted <==**

**Packet Pg. 347** 15
{15}------------------------------------------------
**3.3.a** 

## **Comprehensive Capital Planning** 

**==> picture [659 x 43] intentionally omitted <==**

Non-Major Operational Capital 

**Packet Pg. 348** 16
{16}------------------------------------------------
**==> picture [55 x 19] intentionally omitted <==**

**----- Start of picture text -----**<br>
3.3.a<br>**----- End of picture text -----**<br>


## **Board of  Commissioners Operational Capital** 

**==> picture [659 x 43] intentionally omitted <==**

: **Major Rolling Stock** Burke County staff annually evaluate the condition and utilization of the rolling stock fleet.  As of January 2024, the County’s fleet was comprised of 236 vehicles and the average miles were 76,209.  The Burke County budget team has drafted a formal rolling stock replacement policy and a staggard replacement schedule to be included in the CIP plan moving forward.  The policy, which will include an annual evaluation of each vehicle’s condition and mileage, would be the predictive data analytic – which assumes mechanical and safety standards remain above level 3 on the County’s condition rating scale. (1 = bad / 5 =good). 

FY 24-25 will be the second budget year of a 5-year capital lease obligation that provides for the replacement of five (5) ambulances – which anticipate delivery in Q2 of 2024.  The EMS department has a total fleet of 16 ambulances and utilizes 9 per shift – many of the existing fleets have more than 250,000 miles and are end of life.  The total lease amount is $2,113,780 - $422,756 payable over a five (5) year period.  Other rolling stock such as Quick Response Vehicles (QRV) will be funded annually on a pay-as-you-go basis – the FY 24-25 budget will include one (1) QRVs at an estimated total cost of $150,000.  The prior year budget replaced three (3) QRVs at a cost of $230,000. 

The annual appropriation to the Sheriff’s Office, based on prior year experiences and predictive analytics on replace vs. repair indicates a needed total cost for FY 24-25 is to be approximately $850,000 – up (10%) from $774,000 in the prior year.  Sheriff rolling stock is funded pay-as-you-go inside the Sheriff’s department budget. Approximately 57% of the total fleet is operated by either the Sherriff’s office or Emergency Services departments. Other rolling stock investments include replacement of several other departmental use vehicles. 

**Packet Pg. 349** 17
{17}------------------------------------------------
**3.3.a** 

# **Board of  Commissioners Operational Capital** 

**==> picture [659 x 43] intentionally omitted <==**

General Fund: 

**Foothills** : **(FHEC) Roof  Replacements** Included in the five (5) year plan is $1.2MM for a complete roof replacement. 

**Computer & PC Replacement:** The 2024-2025 CIP plan includes a centralized scale replacement of employees individual devices. 

The planned budget amount of approximately $274,000 will be managed through the I.T. department. 

**Public Safety Radios Plan:** This five (5) year replacement strategy allocates approximately $1,060,000 over five (5) budget periods to replace the County’s public safety radios. 

**==> picture [275 x 68] intentionally omitted <==**

*Includes Technology Credit of $400,000 

**Packet Pg. 350** 18
{18}------------------------------------------------
**3.3.a** 

## **Out-Year General Fund Operational Capital** 

**==> picture [659 x 43] intentionally omitted <==**

## **GOVERNMENTAL ACTIVITIES OUT-YEAR NON-MAJOR** 

||**Project**||**Total Project Cost**||**2023-2024**||**2024-2025**||**2025-2026**||**2026-2027**||**2027-2028**||**2028-2029**||**5 YEAR TOTAL**|
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
||||||-<br>-<br>125,000<br>15,000<br>20,000<br>50,000<br>-<br>-<br>62,500<br>645,000<br>90,000<br>25,000<br>27,500<br>1,060,000|||||||||||||
|Clerk and Governing Board Facility Projects|||75,000||||-||25,000||25,000||25,000||-||75,000|
|ROD Indexing|||170,000||||-||85,000||85,000||-||-||170,000|
|||||||||||||||||||
|Migrate Servers from Hyperflex to Scale environment|||250,000||||125,000||-||-||-||-||250,000|
|Jail network and wifi|||50,000||||15,000||15,000||5,000||-||-||50,000|
|Services building network replacement|||80,000||||20,000||20,000||20,000||-||-||80,000|
|BCECC network replacement, radio network, wifi|||150,000||||50,000||50,000||-||-||-||150,000|
|Other operational system upgrades-see detail tab|||648,000||||227,500||302,500||93,000||25,000||-||648,000|
|||||||||||||||||||
|FHEC-Roof Replacement|||1,200,000||||225,000||225,000||250,000||250,000||250,000||1,200,000|
|||||||||||||||||||
|New EMS Base-Location TBD|||625,000||||-||125,000||250,000||-||250,000||625,000|
|||||||||||||||||||
|Cooperative Extension-General Capital|||80,000||||15,000||50,000||15,000||||||80,000|
|||||||||||||||||||
|I.T. Strategic Plan|||125,000||||62,500||-||-||-||-||125,000|
|Organizational Wide Public Safety Mobile Radio Replacement 212|||1,055,000||||205,000||205,000||-||-||-||1,055,000|
|||||||||||||||||||
|Field 3 lights at Reep park|||180,000||||90,000||-||-||-||-||180,000|
|Paving of parking lots at Reep and Simpson|||70,000||||25,000||20,000||-||-||-||70,000|
|Replace two 20 year Kubota mowers|||55,000||||27,500||-||-||-||-||55,000|
|||||||||||||||||||
|||4,568,000<br>$||$||$|1,087,500|$|1,012,500|$|633,000|$|275,000|$|500,000|$|4,568,000|



**Packet Pg. 351** 19
{19}------------------------------------------------
**3.3.a** 

## **Board of  Commissioners Operational Capital** 

**==> picture [659 x 43] intentionally omitted <==**

**Water/Sewer Fund:** 

**Meter Replacement Project:** Included in the five (5) year plan is $685,000 for 100% meter replacement.  $200,000 is grant funded. 

**Solid Waste Fund:** 

**Roll-** : **Off  Truck Replacement** Included in the five (5) year plan is $110,000 (reoccurring) for roll off truck replacement every other year. 

**Collection Site Offices** : Included in the five (5) year plan is $80,000 for three (3) years to upfit remaining collection site offices and bathrooms. 

: **Compacted Cardboard Recycling** Included in the five (5) year plan is $125,000 for two (2) years to provide 2–3-yard cardboard compactors at all sites. 

**Scale** : **Replacement** Included in the five (5) year plan is $100,000 for two (2) years for scale replacement. 

**Packet Pg. 352** 20
{20}------------------------------------------------
**3.3.a** 

## **Board of  Commissioners Operational Capital** 

**==> picture [659 x 43] intentionally omitted <==**

|||**WATER/SEWER ACTIVITIES**|**WATER/SEWER ACTIVITIES**|**WATER/SEWER ACTIVITIES**|**WATER/SEWER ACTIVITIES**|**WATER/SEWER ACTIVITIES**|**WATER/SEWER ACTIVITIES**|**OUT-YEAR NON-MAJOR**|**OUT-YEAR NON-MAJOR**|**OUT-YEAR NON-MAJOR**|**OUT-YEAR NON-MAJOR**|**OUT-YEAR NON-MAJOR**||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|||**Project**||**Total Project Cost**||**2023-2024**||**2024-2025**||**2025-2026**||**2026-2027**|**2027-2028**|||**2028-2029**||**5 YEAR TOTAL**||
||Water Meter Mechanicsreplacmeent - ALL|||485,000||320,000||305,000||-||-|-|||-||625,000||
||Creek Bank Stabalization|||120,000||120,000||-||-||-|-|||-||120,000||
|||||605,000<br>$||440,000<br>$||305,000<br>$||-<br>$||-<br>$|-<br>$||$|-||745,000<br>$||
|||||||||||||||||||||
|||||||||||||||||||||
|||||||||||||||||||||
|||**SOLID WASTE**|||**ACTIVITIES OUT-YEAR NON-MAJOR**|||||||||||||||
|||**Project**||**Total Project Cost**||**2023-2024**||**2024-2025**||**2025-2026**||**2026-2027**|**2027-2028**|||**2028-2029**||**TOTAL**||
||Roll Off Truck Purchase|||620,000<br>$||110,000<br>$||110,000<br>$||100,000<br>$||100,000<br>$|100,000<br>$||$|100,000||620,000<br>$||
||New Scale Replacement|||200,000||-||100,000||100,000||-|-|||-||200,000<br>$||
||New Compactor|||925,000||-||-||-||300,000|300,000|||325,000||925,000<br>$||
||Cardboard Compactors|||250,000||-||125,000||125,000||-|-|||-||250,000<br>$||
||Collection Site Offices|||240,000||-||80,000||80,000||80,000|-|||-||240,000<br>$||
|||||2,235,000<br>$||110,000<br>$||415,000<br>$||405,000<br>$||480,000<br>$|400,000<br>$||$|425,000||2,235,000<br>$||
|||||||||||||||||||||
|||||||||||||||||||||
||Total Muti-Year Capital|||7,378,000<br>$||1,610,000<br>$||1,807,500<br>$||1,417,500<br>$||1,113,000<br>$|675,000<br>$||$|925,000||7,468,000<br>$||



**Packet Pg. 353** 21
{21}------------------------------------------------
**3.3.a** 

## **Capital Assessment** 

**==> picture [659 x 43] intentionally omitted <==**

Major Projects & Building Stock 

**Packet Pg. 354** 22
{22}------------------------------------------------
**3.3.a** 

## **Capital Assessment** 

**==> picture [659 x 43] intentionally omitted <==**

FACILITIES ASSESSMENT PROCESS & NEEDS: 

**==> picture [375 x 328] intentionally omitted <==**

Building Condition Analysis 1-5 _(where 1 is poor)_ 

1. Structural 

2. Interior Construction 

3. Electrical System 

4. Mechanical Systems 

5. Plumbing Systems 

6. Security Systems 

**Packet Pg. 355** 23
{23}------------------------------------------------
**3.3.a** 

## **Capital Assessment** 

**==> picture [659 x 43] intentionally omitted <==**

|**Facilities Evaluated During Space Needs Assessment**<br>**Building**<br>**Location**<br>**City**<br>**Rating**<br>**Sq. Ft**<br>**Yr. Built**|**Facilities Evaluated During Space Needs Assessment**<br>**Building**<br>**Location**<br>**City**<br>**Rating**<br>**Sq. Ft**<br>**Yr. Built**|**Facilities Evaluated During Space Needs Assessment**<br>**Building**<br>**Location**<br>**City**<br>**Rating**<br>**Sq. Ft**<br>**Yr. Built**|**Facilities Evaluated During Space Needs Assessment**<br>**Building**<br>**Location**<br>**City**<br>**Rating**<br>**Sq. Ft**<br>**Yr. Built**|**Facilities Evaluated During Space Needs Assessment**<br>**Building**<br>**Location**<br>**City**<br>**Rating**<br>**Sq. Ft**<br>**Yr. Built**|**Facilities Evaluated During Space Needs Assessment**<br>**Building**<br>**Location**<br>**City**<br>**Rating**<br>**Sq. Ft**<br>**Yr. Built**||||**Attachment: CIP Worksession FY 24-25 (2) 3-6-24  (4310 : CM - C**|
|---|---|---|---|---|---|---|---|---|---|
|||||||||||
|Animal Shelter|425 Kirksey Drive|Morganton|1.00|4,000|1980|||||
|EMS Station #1: Hospital|2201 S Sterling Street|Morganton|1.00|5,000|1975|||||
|Landfill-Transfer Station|2500 Marsh Trail|Morganton|1.40|12,500|1997|||||
|Avery Building|200 Avery Avenue|Morganton|2.13|28,700|1923|||||
|Sheriff's Office (Sheriff side only)|150 Government Drive|Morganton|2.14|11,500|1993|||||
|Burke-Catawba District Confinement Facility (Old Jail)|148 Government Drive|Morganton|2.14|48,500|1993|||||
|Human Resources Center (HRC)|700 East Parker Road|Morganton|2.42|56,500|1979|||||
|EMS Station #2: Rutherford College _(Hospital Owns Property)_|90 Campus Street|Rutherford College|2.50|1,900|1975|||||
|HildebranBuilding (Water & Sewer Office)|101Main Ave West|Hildebran|2.58|7,100|1964/2016|||||
|Courthouse|201South Green Street|Morganton|2.60|55,000|1974|||||
|EMS Station #4: Hildebran|705 US Highway 70W|Hildebran|2.83|2,200|2002|||||
|Landfill-Office/Garage|2500 Marsh Trail|Morganton|3.00|5,000|1988|||||
|Morganton Library|204 South King Street|Morganton|3.00|16,800|1995/2004|||||
|Morganton Senior Center|501 North Green Street|Morganton|3.00|17,600|1984|||||
|Burke Agricultural Building|130 Ammons Drive|Morganton|3.50|14,000|2002|||||
|Burke Services Building|110 North Green Street|Morganton|3.83|24,000|1954/2000|||||
|ValdeseLibrary _(Share Ownership with Valdese)_|213 St. Germain Avenue|Valdese|3.83|9,000|1943/2004|||||
|Foothills HigherEducation|2128 South Sterling Street|Morganton|4.00|130,000|1980/2004|||||
|||||||||||
|***Building Condition Rating Scale 1 thru 5 where 1 ispoor condition and 5 is new or excellent condition**||||||||||



***Building Condition Rating Scale 1 thru 5 where 1 is poor condition and 5 is new or excellent condition** 

**Packet Pg. 356** 24
{24}------------------------------------------------
**3.3.a** 

## **Board of  Commissioners - Priorities** 

**==> picture [659 x 43] intentionally omitted <==**

|||**Mid**<br>**Term:**|
|---|---|---|
|•<br>Health and Human Services Building<br>•<br>Animal Services Building<br>•<br>Emergency Medical Services Base #1<br>•<br>Regional Substance Abuse Rehabilitation Center<br>•<br>Fonta Flora Trail Boardwalk at Linville Dam<br>•<br>Fonta Flora Trail Eagles Nest Overlook and ADA pocket<br>park<br>**Long**<br>**Term:**<br>•<br>Library Expansion<br>•<br>Solid Waste MSW Development<br>•<br>Water/Sewer Infrastructure<br>•<br>EMS Base Additions<br>•<br>Courthouse Replacement<br>**Short Term:**<br>•Jonas Ridge Phase I & II<br>•East Burke Collection Site<br>•Indian Hills Pump Station<br>•Courthouse Improvements<br>•Storage Management Policies|||



**Packet Pg. 357** 25
{25}------------------------------------------------
**3.3.a** 

**Packet Pg. 358**
{26}------------------------------------------------
**3.3.a** 

**Packet Pg. 359**
{27}------------------------------------------------
**3.3.a** 

Burke County Courthouse Improvement Project 

**==> picture [723 x 400] intentionally omitted <==**

**Packet Pg. 360**
{28}------------------------------------------------
Adult Protective Services Project 

HVAC Updates…………………….. Complete Flooring……………………………. Complete Modular Furniture………….……..March 2024 Framing Interior Walls…………...…April 2024 Painting Exterior…………………… May 2024 Substantially Complete……...……….June 2024 

**3.3.a** 

**==> picture [19 x 440] intentionally omitted <==**

**----- Start of picture text -----**<br>
Attachment: CIP Worksession FY 24-25 (2) 3-6-24  (4310 : CM - Capital Improvement Plan<br>**----- End of picture text -----**<br>


**Packet Pg. 361**
{29}------------------------------------------------
**3.3.a** 

## JONAS RIDGE PROGRESS 

**==> picture [19 x 440] intentionally omitted <==**

**----- Start of picture text -----**<br>
Attachment: CIP Worksession FY 24-25 (2) 3-6-24  (4310 : CM - Capital Improvement Plan<br>**----- End of picture text -----**<br>


**Packet Pg. 362**
{30}------------------------------------------------
EAST BURKE PROGRESS 

**3.3.a** 

**Packet Pg. 363**
{31}------------------------------------------------
**3.3.a** 

## Burke County Health & Human Services Project 

- Space Program 95% Complete 

- Next Steps: 

   - Finalize Building Scope & Envelope 

   - Retain Design Team 

   - Site / Civil Evaluation 

   - Estimated Costs 

   - Draft Renderings 

   - Design/Development 

   - Construction Documents 

   - Financing Package 

   - Begin Construction 

|||||||**n**|
|---|---|---|---|---|---|---|
|**BURKE COUNTY, NC HEALTH AND SOCIAL SERVICES DEPARTMENT BUILDING SPACE PROGRAM**<br>**DRAFT SUMMARY SPACE PROGRAM**||||||**Attachment: CIP Worksession FY 24-25 (2) 3-6-24  (4310 : CM - Capital Improvement Pla**|
|**Comp.**<br>**#**|**Facility Component**|**Total NSF**<br>**Component**|**Grossing**<br>**Factor**||**Total**<br>**DGSF**||
|**1.000**<br>1.100|**Main Lobby/Shared Use/Meeting/ Staff and Building**<br>**Support**<br>Main Lobby/Shared Use/Staff/Meeting/Support|8,634|25%||10,793||
||**Subtotal - Public Lobby/Administration**||||**10,793**||
|**2.000**<br>2.100<br>2.200<br>2.300|**Health Department Space Program**<br>Health Department Lobby/Staff Support/Storage<br>Administration and Operations<br>Clinical|2,256<br> <br>2,051<br> <br>6,736|30%<br>30%<br>30%||2,933<br>2,666<br>8,757||
|2.400<br>2.500<br>2.600<br>2.700|Lab<br>WIC<br>Health Preparedness/Health Education<br>Environmental Health|960<br>2,356<br>1,173<br>1,480|25%<br>30%<br>30%<br>30%||1,200<br>3,063<br>1,525<br> <br>1,924||
|2.800|Care Management|885|25%||1,106<br>||
||**Subtotal -Health Department Space Program**||||**23,174**||
|**3.000**|**Department of Social Services Space Program**||||||
|3.100|Department of Social Services Lobby/Staff Support/Storage|4,376|30%||5,689||
|3.200<br>3.300<br>3.400<br>3.500<br>3.600|Administration<br>Legal<br>Economic Services<br>Child Protective Services<br>Foster Care|2,578<br>1,670<br>12,684<br>7,318<br>4,108|30%<br>30%<br>35%<br>30%<br>30%||3,351<br>2,171<br>17,123<br>9,513<br>5,340||
|3.700|Adult Services|3,430|30%||4,459||
||**Subtotal - Department of Social Services Space Program**||||**47,647**||
||**TOTAL - FACILITY COMPONENTS DGSF**||||**81,614**||
||Building Grossing Factor 20% (Includes:<br>Mechanical/Electrical/Major Circulation Corridors/Walls/Wall<br>Thickness)||||16,323||
|||||||~~**.**~~**364**|
||**TOTAL - FACILITY COMPONENTS BUILDING GROSS SF**|||~~**P**~~|**97,937**<br>~~**acket Pg**~~||
{32}------------------------------------------------
**3.3.a** 

## **Board of  Commissioners - Priorities** 

**==> picture [659 x 43] intentionally omitted <==**

||||Status|Funded in PY from GF|Amount Funded in|Amount Funded in||Grant Funding||Debt Funding||Total Funding|
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|||||||Capital Reserve|||||||
|**Building - Major Projects**|||||||||||||
||||||||||||||
|AnimalServicesBuilding|6,000,000<br>$|Active - Design & Development||-||6,000,000||-||-||6,000,000|
|EMSBase#1 Relocation|7,000,000<br>$|Active - Design & Development||-||7,000,000||-||-||7,000,000|
||||||||||||||
|CourthouseImprovements|2,100,000<br>$|Active - Design & Development||-||1,100,000||1,000,000||-||2,100,000|
|Health/HumanServicesBuilding|30,000,000<br>$|Space Planning90%||-||-||-||30,000,000||30,000,000|
|Indian HillsPump Station Replacment|2,500,000<br>$|Analysispart of AIA - Ongoing||-||-||1,118,000||-||1,118,000|
|FontaFloraTrailCapital Investment|2,200,000<br>$|TBD||-||2,200,000||-||-||2,200,000|
|FontaFloraTrailCapital Investment|355,918<br>$|In Design Phase Bridge Side Walk<br>Mattern & Craig||-||-||355,918||-||355,918|
|OverMountainVictoryTrail Investment|392,258<br>$|FERC Grant from Duke||-||-||392,258||-||392,258|
|JonasRidgePhaseI|1,500,000<br>$|To be completedQ1 2024||1,500,000||450,000||-||-||1,950,000|
|EastBurke CollectionSite|1,500,000<br>$|To be completedQ1 2024||1,500,000||-||-||-||1,500,000|
|JonasRidgePhaseII|800,000<br>$|In Design Phase(Q3 2024)- Equinox||-||800,000||-||-||800,000|
|Regional Rehab Center|15,000,000<br>$|Planning- TimingTBD||-||-||15,000,000||-||15,000,000|
|EMS Station -New Construction|1,000,000<br>$|Not Funded - TBD||-||-||-||-||-|
|EMS Station -New Construction|1,000,000<br>$|Not Funded - TBD||-||-||-||-||-|
|LibraryExpansion|12,000,000<br>$|Not Funded - TBD||-||-||-||-||-|
||||||||||||||
|||Total||3,000,000<br>$|17,550,000<br>$|||17,866,176<br>$||30,000,000<br>$||68,416,176<br>$|



**Packet Pg. 365** 33