**PLANNING DATE:  March 17, 2026 BOARD Town of Fletcher 300 Old Cane Creek Road MINUTES Fletcher, NC 28732** 

## **Type of Meeting:    PUBLIC MEETING** 

Chairman Bowser called a regular meeting of the Planning Board to order at 6:00 PM 

## **BOARD MEMBERS PRESENT:** 

**Lee Bowser (Chairman/ District 2)                                    Robyn Mondin (At Large/ District 1) Mike Franklin (District 1)                                                         Doug Ferguson (District 4) Julia Fogel (At Large/ District 3)                                           Bryan Gilbert (ETJ)** 

**Public Input:** No one from the public spoke at this time. 

||||
|---|---|---|
|**AGENDA ITEM:**|**PRESENTED BY:**|**ACTION TAKEN:**|
|**Approval of Minutes from January 20, 2026**<br>**meeting**|**Chairman Bowser**|**Approval of the minutes, as**<br>**transcribed**|
|**Hearing of Cases**|||
|**1 Standard Rezoning and Special Use Permit**<br>**Review -Birkshire Trace (26-01-SUP)**|**Tyler Morrow, Planning**<br>**and Zoning Director.**<br>**Nate Roman Folks, of**<br>**Taft Mills Group**|**The board recommended to Council**<br>**to deny the rezoning and the Special**<br>**Use permit**|
|**Other Business**|||
|**1 Staff Updates**|**Tyler Morrow, Planning**<br>**and Zoning Director**|**None**|



**STAFF PRESENT:** Tyler Morrow, Planning and Zoning Director An audio file of the meeting is available, upon request, for a fee. 


{2}------------------------------------------------
**Approval of Planning Board minutes: corrections-additions-deletions** 

**Chairman Bowser** asked for a motion to approve the minutes. 

It was so moved by **Robyn Mondin;** second by **Mike Franklin** . There was no further discussion. The motion carries, all in favor. 

**AGENDA ITEM 1** 

**Standard Rezoning and Special Use Permit Review -Birkshire Trace (26-01-SUP)** 

**Chairman Bowser** gave the State of NC law of procedures for a quasi-judicial public hearing. He explained that the board must base its decision upon competent, relevant, and substantial evidence in the record. A quasi-judicial decision is not based on public opinion or a show of hands. It must be made in accordance with the standards set forth in the ordinance and grounded in the evidence presented. He said to anyone planning to speak as a witness, please limit your comments to relevant facts and applicable standards rather than personal preferences or opinions. 

None of the board members had a conflict of interest with the subject application. 

**Chairman Bowser** swore in those present who will be speaking. 

## PRESENTATION 

**Mr. Tyler Morrow** presented his staff report and presentation to be entered into the official record. He said the applicant is requesting to change the zoning of the four parcels from C-2 to NBD in order to seek a Special Use Permit in the NBD district for multi-family dwellings. The four property parcels are identified as: 

9643-73-8923; 9643-84-1236; 9643-84-3220; and 9643-84-4274. The total acreage is 7.71. 

**Mr. Morrow** said the applicant, **Dustin Mills** of Taft Mills Group, proposes a 115-unit lowincome housing, tax credit multifamily development that has a proposed density of 14.92 units per acre. The property is currently zoned C2, which does not allow multifamily residential. In 2017, the Town Council amended the land development code to remove such residential uses from C1 and C2. The land use plan was later updated to reflect this policy direction. Because of this, the property must first be rezoned to a district which allows multifamily housing to be considered. The applicant has requested that zoning 

2 


{3}------------------------------------------------
district be NBD, neighborhood business district where multifamily is allowed only through the issuance of a special use permit. This means two separate actions are before the board. 

**Mr. Morrow** continued. If the rezoning is not approved, the special use permit request would become moot at that point- that's more of an issue for Council rather than the Planning Board. If the rezoning is approved and the special use permit is denied, then the property would still carry the NBD zoning district and would be allowed to be developed for a use within that district that's permitted by right. Special Use permits may be granted by Town Council following a recommendation by the Planning Board. 

**Mr. Morrow** said, this process, as the chair mentioned, is quasi-judicial, meaning that it operates much like a court. Decisions must be based on competent evidence presented during the hearing rather than general opinion or political preference. For approval, Council must make several findings, including that the application is complete, that the proposed use will not negatively impact public health, safety, or welfare, and that it will not be detrimental to the surrounding areas or public improvements. Council must also determine that it meets all our criteria for issuing a special use permit. These standards include evaluating the access, traffic safety, parking and loading, utility availability, buffering, signage, lighting impacts, open space, recreational areas, building placement, and design; potential operational impacts on the surrounding neighborhood; and it has to be in accordance with an approved site plan. 

**Mr. Morrow** said the surrounding area is primarily commercial in nature, with car dealerships and hotels being the most prominent uses along Underwood Road. The site is currently developed as a Quality Inn motel. If the project is approved, the existing motel use would cease operation, and the structure will be demolished. East of the subject property is Stafford Hills Residential Development, which contains approximately 184 units on 16.82 acres with a density of about 10.94 units an acre. 

The subject property is located near Airport Road, which is a commercial corridor, placing future residents within walking distance of restaurants, retail, grocery options and urgent care facilities. This proximity is important for affordable housing development where residents may have limited access to personal vehicles. The site is also within close proximity to the Asheville Transit route along Airport Road. 

**Mr. Morrow** showed photos of the existing site conditions. He then provided the site plan on the screen. The site plan shows 5 residential buildings totaling 140,740 square feet of floor area. Individual building footprints range from roughly 9,600 square feet to 11,000 square feet. The project proposed has a density of 14.92 units per acre. He said the maximum density for this zoning district is 16 units per acre. All buildings are proposed to be three stories tall. 

The development includes several residential amenities, such as a community room, a playground, a top lot, covered picnic area, a computer center, exercise room, and outdoor seating areas. Two vehicular access points are proposed. One off Rockwood Road, which 

3 


{4}------------------------------------------------
is maintained by NCDOT, and the other one will be off Underwood Road, which is maintained by the Town. Five-foot sidewalks will be required along all property frontages. The development includes 10 bicycle parking spaces to support residents who may or may not have access to personal vehicles. Existing vegetation is proposed to remain along the eastern property boundary to provide a buffer from nearby residential properties. However, there are portions on the southeastern boundary that does not currently include a buffer. Parking is provided at a ratio consistent with the land development code, resulting in the required 247 spaces, of which 18 are ADA accessible. 

**Mr. Morrow** explained that North Carolina General Statutes requires that governing boards adopt a land use plan consistency statement when considering zoning amendments. This statement explains how the request aligns or conflicts with the Town's adopted land use plan. In this case, the proposal is inconsistent with goal 10 of the Land Use plan, which seeks to carefully manage higher density residential and direct it towards the town core near the future town center while preserving commercial land for economic activity.  He said, however, an inconsistency with the land use plan does not automatically prohibit approval. State law does allow governing boards to approve requests that conflict with the plan as long as the board adopts a statement explaining the inconsistency and the reasonableness of their decision. 

**Mr. Morrow** then accepted any questions. The members of the board had no questions. 

**Chairman Bowser** asked the applicant if he wished to call any other witnesses to speak on behalf of the case. 

**Mr. Nate Roman Folks** , Vice President of Development for **Taft Mills Group** addressed the board. He is joined by the Senior VP **, Tristan Williams** ; the design and engineering team; the architectural team; and their engineer, **John Kinnaird** . 

**Mr. Folks** said Taft Mills Group is a real estate development company that specializes in building affordable multi-family housing. The company has been established for over 12 years and is based out of Greenville, North Carolina. They develop in North Carolina, South Carolina, Virginia, and Maryland, and have been consistently ranked one of the top 50 affordable housing developers in the country. They’ve received the highest housing honor from the North Carolina Housing Finance Agency. 

**Mr. Folks** presented slides of some of the recently completed or currently under construction developments by Taft Mills Group. They build both family affordable housing and senior affordable housing. They build complexes from 48 units up to 180-200. 

**Mr. Folks** explained what low-income housing tax credits and affordable housing is. 

The Low-Income Housing Tax Credit Program is a program that incentivizes and encourages private investment for the creation of affordable housing. **Taft Mills Group** is a for-profit company that will develop and own this property long-term. If a developer is awarded the tax credits, through the North Carolina Housing Finance Agency, that serves 

4 


{5}------------------------------------------------
as a big funding source into development. It helps pay for the construction, which then allows a smaller mortgage on the property than  would otherwise be possible. This keeps rents lower for a 30-year period. 

The affordable housing development will only serve households that make 60% of the area median income- and below - for Henderson County. This program has been around since the 1980s. **Mr. Folks** said It's been by far the most productive funding source for developing affordable housing throughout the country. 

**Mr. Folks** continued. He said the amenities that are in close proximity to the site is part of the reason why this site was chosen. There's grocery, parks, shopping, and a transit stop in close proximity. He said 115 affordable housing units are proposed which would involve redeveloping what's currently an aging motel on the site and developing the undeveloped land. As stated, all of the units will be serving households at 60% of the area's median income. In Henderson County, for a family of three, this would be a little over $50,000. One-, two-, and three-bedroom units will be available to serve a mix of housing sizes. Each building would be a three-story building. 

**Mr. Folks** added that the site plan is designed to create as much buffer as possible and preserve as much land as possible. In addition to the amenities around the site, they will also provide amenities on-site for the residents, with a community center, indoor exercise facility, business center, covered picnic areas throughout the site, playgrounds, top lots, and open green space for enjoyment. Onsite property management as well as on-site maintenance staff will be there every day. He said the proposed development will provide much needed affordable housing for working families in the Fletcher community. 

**Chairman Bowser** asked Mr. Folks if there is anybody else he would like to speak on TMG’s behalf. There was none. 

5 


{6}------------------------------------------------
## **DISCUSSION** 

**Chairman Bowser** asked for anybody with standing testimony who would like to speak. 

**Jenifer Bubenik** of **29 Farrington Circle** addressed the board. 

She entered her opposition into the public record regarding the proposed rezoning of the property located at 196 Underwood Road from C2 Interstate Commercial to NBD Neighborhood Business District for the purpose of a multi-use housing development. 

**Ms. Bubenik** said she recognizes the regional need for diverse housing options, however, the selection of this specific site is fundamentally incompatible with the existing environmental conditions, public health safety standards, and the long-term economic goals of our community, including the Fletcher Connects final plan. 

Ms. Bubenik’s opposition is based on the following critical factors. 

- The C-2 interstate designation serves as a crucial function by accommodating businesses. These businesses include larger retail establishments, service providers, and hospitality venues that cater to broader regional traffic and contribute significantly to the local tax base. Reclassifying this land to NBD risks displacing these essential businesses or inhibiting their future growth. 

- This property opens up to the ABC store, which the National Institute of Health found in a 2009 study that alcohol outlets in lower income and disadvantaged communities raises serious public health concerns and has negative health consequences because of alcohol availability. 

- The subject property sits within the immediate impact zone of the I-26 corridor, which currently carries an Annual Average Daily Traffic volume exceeding 58,000 to 70,000 vehicles per day. Per the Fletcher Connects 2020 plan, the AADT of Underwood Road was 2,300. These 2 roads converging creates lower air quality and noise pollution. Traffic is backed up at the McDonald's light, due to stop light waiting times that are 5 minutes. Adding 247 cars to this two-lane Rd. will put a hardship on the daily amount of traffic that has already reached capacity. 

- Peer-reviewed research from the EPA and health organizations, including the 2026 America's Health Rankings, confirmed that living within 500 feet of a major interstate exposes residents to dangerous levels of diesel particulate matter and nitrogen peroxides. The 24-7 decibel levels produced by the I-26 Widening Project and increased freight capacity makes the site physiologically unsuitable for a neighborhood designation. Approving high-density housing here is a failure of the Town's duty to protect the health of future residents. 

- There was no traffic impact study in the proposal- she would request one moving forward. The NBD district is intended to foster human-scale walkable environments. If you've ever tried to walk on this road, which she has, including ART, there's no sidewalk in front of Ruby Tuesday's or McDonald's. Trying to walk to the Ingles or 

6 


{7}------------------------------------------------
three miles to Walmart, an individual has to cross back and forth. This makes it literally a death trap. 

   - The infrastructure surrounding C2 interstate zone is engineered for high velocity logistics and regional traffic. Introducing pedestrians, cyclists, and neighborhood traffic into an area dominated by interstate off-ramps and heavy freight creates an inherent safety hazard. 

   - This proposal offers bike parking, but there's no bike lanes on Underwood or Airport Road. This is a failure to communicate between DOT, Town of Fletcher, Buncombe County and Henderson County. 

   - The ongoing I-26 widening project is designed to alleviate regional congestion, not service a residential driveway. A multi-use development here will create friction at critical access points, undermining the $700 million public investment in our regional highway system. 

   - Converting this into an NBD shifts the site from tax-positive commercial use to service-heavy residential use. This puts an undue long-term burden on existing taxpayers to fund the increased demand for emergency services and infrastructure maintenance. 

   - If the surrounding parcels remain C-2, this rezoning creates an isolated residential island. This is inconsistent with the Fletcher Connects and strategic plan update and will lead to inevitable future nuisance complaints for residents against existing commercial neighbors. 

   - NBD zoning district designation is a valuable tool for creating vibrant communities, but it belongs in the heart of our town, not on the shoulder of an interstate. 

- **Ms. Bubenik** urges the board to recommend denial of this rezoning request to preserve the health of citizens and the economic integrity of our commercial corridors. 

**Wes Stroupe** of **86 Lanceford Circle,** HOA president of the Stafford Hills community spoke. He is a licensed general contractor and owns an environmental company that specializes in inspections, installations, and maintenance of stormwater systems. 

**Mr. Stroupe** said Lanceford Cir. is at the low point of the proposed development. He said there's a significant stormwater problem that comes off the subject property that regularly causes flooding in the Lanceford Circle portion of Stafford Hills.  He said there have been multiple units flooded resulting in people spending a lot of money to fix their homes because that area's not in the floodplain, therefore they can't get flood insurance. 

In **Mr. Stroupe’s** opinion developing anything on the subject property is risky, but a highdensity project where there's going to be a lot of impervious surfaces, roofs, asphalt, sidewalks, would be absolutely catastrophic. 

**Mr. Stroupe** presented videos of flash-flooding on Lanceford Circle, which occurs any time there is a hard rain. The stormwater flowed to the very top of the door threshold of his house. 

7 


{8}------------------------------------------------
**Mike Franklin** asked if this rain is coming down from the highway in the development or coming down through the woods. 

**Mr. Stroupe** said the only thing that helps at all with runoff is the fact that the property is wooded and there’s a little bit of buffer to slow it down a bit. He feels to grade the property for the high-density project would be completely catastrophic. It would be very likely that the homes would flood on the Lanceford Circle portion. 

In **Mr. Stroupe’s** opinion, the project falls short of Criteria #2 which states that the proposed use would not negatively impact the health, safety and public welfare of nearby residents and that it would not be detrimental to surrounding properties or public improvements. He stated that in Stafford Hills there are 189 homes and 500-600 residents- the entire community is very concerned about the multi-family project, and they are here to oppose the project. 

**Mr. Franklin** asked Mr. Stroupe had he indicated that the Town was out there to assess this after a rain. 

**Mr. Stroupe** said they had been out a few years ago and advised for a berm to be built to contain stormwater. Which they’ve done. 

**Chairman Bowser** asked the applicant if they have any feedback to give. 

**John Kinnaird, PE** of Three Notch Group addressed the board. **Mr. Kinnaird** is the civil design & site development leader for the project. He said he’s aware of the stormwater issue on the neighbors’ property. In his professional opinion he thinks the system is probably aging and undersized. 

**Mr. Kinnaird** said his team of engineers would be looking at downstream conditions and would work with the HOA on those. He said there are no stormwater measures on the property at all at present. Water is running off untreated, unretained. As part of this projectwhat was referred to as a pool- is a retention pond. This will provide water quality treatment for smaller rains, but also retention for larger storms-storms just like the ones shown in Mr. Stroupe’s video. He said he suspects that most of the runoff is coming from Apple Tree, and that's also something that the developer would be concerned about coming through their property so it will be looked at as part of the stormwater design. He said they are aware of the situation, and don't want to flood out neighbors either. 

**Mr. Franklin** asked if the design they propose could solve this problem. 

**Mr. Kinnaird** believes it may solve the problem but said it certainly will not make it worse. He would like to solve the problem and manage the stormwater correctly.  He added that much of the land is not wooded. Most of the woods are on the east and southeast property line, which will be preserved as much as possible. 

**Mr. Folks** said there will be underground retention under the parking lots on the southwestern portion of the site. Currently there's nothing there and it's just purely running off without treatment. 

8 


{9}------------------------------------------------
**Ms. Dawn Harris** of 14 Yorktown Circle, (Stafford Hills), gave her opposition to the board. She said as a former property manager of Perry Lane Apartments, for five years, her concern is safety. From her experience she says affordable housing complexes bring crime, drugs, and convicted felons. She dealt with crime, drug activity and the death of an individual by overdose while at Perry Lane Apts. 

**Mr. Stormy Ellis,** who resides at 21 S. Wildwood Ln spoke in opposition. She is an assistant district attorney in Buncombe County. Mr. Ellis once lived at 48 Lanceford Circle. She said the proposed retention pond for the apartments is higher than the properties on Lanceford Circle. Concrete berms were constructed, but the water continues to flow through the concrete blocks.  It is her opinion that: 

- New development will exacerbate the water drainage problem. 

- The additional residents in the proposed115 apartments will impact the existing traffic problem on Underwood Rd. 

- The project will increase crime. 

- There will be an issue for emergency vehicles to get in and out due to limited access. 

- The ABC store in conjunction with low-income housing (is a cause of concern). 

In rebuttal to this opposition, **Mr. Folks** pointed out the site is already zoned C-2, which does allow significantly higher intensity uses than what is proposed. He said things like traffic would be significantly higher with a use permitted in the C-2 district. They have had a traffic engineer look at the site. Based on the existing traffic counts, they've actually decreased from a couple of years ago. He added there is an existing use (of a motel) on the site that is producing traffic; and they would be required to conduct a TIA later in the process. 

**Mr. Morrow** said they would at least have to do a scoping document through NCDOT, and then they would determine if a full TIA is required. 

**Mr. Folks** said they will comply with all the requirements and recommendations of the traffic professionals. Regarding the safety concerns, Taft Mills Group has a significant screening process. Every resident not only has to qualify based on income, but they must also have a background check. Credit and background checks are done to ensure safety of all the residents.  There will be onsite property management; maintenance staff; and cameras on the property that are providing 24-hour surveillance. 

**Chairman Bowser** commented, regarding water runoff, that it has no way to slow down currently. He asked if some of that flow will be mitigated by the developer. 

**Mr. Kinnaird** said that’s correct. And he would absolutely want to work with the neighborhood. They would do everything possible on the subject property as well as looking at the downstream property. 

9 


{10}------------------------------------------------
**Mr. Stroupe** , president of the HOA, said he doesn’t see on the drawings where any wooded area is intended to be saved. He is concerned that the retention pond will overflow and the water will continue downhill.  His opinion is that the pond would have to be so big to make sure that that doesn't happen. And there's no room there to build one big enough. In a large storm event, that retention pond is going to overflow. It's going to put 100% of that down on Lanceford Circle and be a catastrophic event. 

**Ms. Bubenik** reiterated what she previously said in regard to the traffic. In 2020 the traffic count on Underwood Rd was 2,300. This development would add another 260 vehicles. She added that the findings on the ABC store came from the National Institute of Health. These are both facts, not her opinion. 

**Chairman Bowser** asked if the buildings would have to pass; DOT requirements would be met; and all the site engineering would be done prior to development. He then asked if the rezoning is strictly preliminary review. 

**Mr. Morrow** confirmed that the applicant has to provide a preliminary site plan- as they have done. He said Generally speaking, this project has met all of the criteria that has been set out in the ordinance. If approved, they would still have to go through final site plan approval, and that's when they get into full construction drawings, final grading plans, and final construction plans. That's when they get permits through DOT, and Henderson County Soil Erosion Control in order to meet all the criteria in the ordinance. 

**Mr. Morrow** added there can be specific conditions placed on this type of process. If Planning board recommends- and Council determines that they’re meeting all the minimums- but in order to protect the safety of the other residents, they could determine it’s necessary for there to be a larger pond or more ponds. He said we wouldn't go through it at this point without having the rezoning approval. 

**Mr. Mike Franklin** asked Mr. Morrow if the zoning change is approved but they decide to back out of building, could any developer who wanted to build anything, do so with the NBD zoning. 

**Mr. Morrow** explained that if rezoned there’s a presumption that you want to also issue the special use permit.  If that were to occur in that sequence, the special use permit is good for one year. If the applicant decides, once it's approved, they don't want to do this for that whole year nothing could be done on this site other than this development.  After that Council and the Planning board could give a recommendation to  revert the land back to a C- 2 district with a map amendment to prevent another developer from doing a new NBD development. 

**Mr. Doug Ferguson** : Has there been a traffic study done? 

**Mr. Morrow:** No, they’ve been referencing traffic counts from Fletcher Connects, which is our bike and ped plan. This was from 2020. This counted average daily trips. A TIA is when you scope out certain intersections. For example, if you were to scope out this project, one of the intersections you would study would be Airport Road and Underwood Road. Traffic 

10 


{11}------------------------------------------------
impact and analysis studies research impacts of this development.  You look at the intersection, how it's operating today, and you grade it,  A - E.  Then you look at a five-year build-out, of the impacts of this building on that same intersection. Then you compare it to what the impact on this intersection will be in five years if this is not developed. Through that analysis by traffic engineers there's usually mitigation where you'll need a turn lane or you'll need a taper lane. This process would go through NCDOT. They send it off to Raleigh, and they have congestion management review those. DOT has already made the comment that if this is approved, they're going to require at least a scoping document to determine whether or not they're going to require a full-blown TIA done by a traffic engineer. 

**Mr. Ferguson:** to clarify, it would be Underwood Road, it wouldn't be Rockwood Road? 

**Mr. Morrow:** the TIA would be all-encompassing. There'd probably be 7 or 8 intersections that would be studied. Underwood and Fanning Bridge would likely be studied. It would look at a number of intersections, like holistic view of this. We wouldn't be looking at just Underwood. Rockwood would also be included in that. Since that is an NCDOT maintained Rd. they would specifically have a lot of interest in how these trips would impact their infrastructure. 

**Mr. Morrow** : State law specifies that any time a TIA is required by a town, DOT automatically has jurisdiction also to review it- and vice versa. If DOT required one, we would also have jurisdiction to review it as well. So anytime either entity requires they both get to review and have input on. 

**Ms. Bubenik** asked if the developer has to pay for it. 

**Mr. Morrow** : The TIA is created and conducted by the developer; is paid 100% by the developer. They then present them to us. We review their work to make sure that it's in accordance with  the Town. 

## _**Dialogue continued with regard to traffic impact if the development is permitted.**_ 

**Chairman Bowser:** We’re moving on to opinions. We need to stay more to factual data backed by experts. It's my understanding that if we move forward with this, you're going to have impact studies by various organizations and state agencies which will provide the answers to your concerns. There is no definitive answer to a lot of the questions that are being asked here, but all we're trying to do is see if the zoning can move forward so that these processes will answer those questions by professionals in that manner. What I'm hearing are views from other people, but we need expert factual data to be able to disallow them what they're allowed to do. They're following the guidelines. Is there anything else that anybody would like to bring up before I close the witness part of this? 

No other witnesses came forward. 

**Chairman Bowser** : As a reminder, this board is tasked with deciding if, based on the evidence presented, this proposal meets the applicable standards. This decision cannot be based on personal preference of the board members, rather it's based on standards and 

11 


{12}------------------------------------------------
factual evidence. Again, if we want opinions, they have to be based on facts by experts in those fields. The board members are encouraged to reference the applicable standards and specific evidence in their deliberation. For this particular case, the board is asked to decide, does the record include competent, relevant, substantial evidence that development is consistent with Article 15.10 and that all nine required criteria are met for the approval of the Special Use. 

**Ms. Robyn Mondin:** May we see Article 15.10 again? 

**Mr. Morrow** : The nine criteria in the staff report you have are the criteria listed in Article 15.10, and basically what you're looking at are these nine criteria. 

**Ms. Mondin** : That nine criteria is for the special use permit, not for the rezoning, correct? 

**Mr. Morrow:** Correct. For the rezoning aspect of the application, you have to consider the land use plan, and then you also have to determine if it's reasonable or not reasonable. Special use permit reviews are more rigid.  The standard rezoning process is more legislative in nature. It is inconsistent (with the Land Use plan), but even if it is inconsistent, you can still find it reasonable. You might say it's inconsistent with the plan, but it's still reasonable for adding additional affordable housing to Fletcher. Or you can find it inconsistent with the land use plan and also find it not reasonable with the public interest. 

**Chairman Bowser:** We're not the final say on this. All we're doing is making sure that they're following the application requirements and they're within the boundaries of what is allowed. We need a motion to approve, deny, or approve with condition. 

**Doug Furguson:** I move the Planning Board to recommend to Town Council to deny an ordinance amending the official zoning map of the town of Fletcher, changing the zoning designation of the subject property from C-2 Interstate Business District to NBD Neighborhood Business District. 

**Chairman Bowser:** Do I have a second? 

**Robyn Mondin:** I'll second the motion to deny. 

**Chairman Bowser:** Any other discussion? 

No further discussion. 

**Chairman Bowser** :  All those in favor of denying, raise your hand, please. 

The board voted 5-1 to recommend denial of the rezoning. 

**Mr. Morrow:** You all can also give a recommendation for the special use permit. It would be good to give that recommendation, because that's what the ordinance calls for. When it goes to Council, if they vote down the rezone, then it stops there. But you all still have the opportunity to vote on the special use permit. 

**Chairman Bowser** asked for a motion for the Special Use permit. 

**Robyn Mondin** made a motion for denial. 

12 


{13}------------------------------------------------
**Doug Ferguson** made a second motion for denial. 

The board voted 5-1 to recommend denial of the Special Uses permit. 

**Chairman Bowser** moved on to the next item- Other Business. 

**AGENDA ITEM 3** 

**Staff updates and other business** 

**Mr. Morrow** welcomed two new board members, **Bryan Gilbert** , the Town’s ETJ representative, and **Julia Fogel,** who is an At-large representative and District 3. He thanked both for taking this opportunity to join the board. 

**Chairman Bowser** moved to adjourn. 

**Ms. Mondin** seconded. Meeting Adjourned at 7:35 PM 

**Next meeting: April 21, 2026** 