## **MINUTES BREVARD CITY COUNCIL Budget Workshop April 10, 2026** 

The Brevard City Council met for a Budget Workshop on Friday, April 10, 2026, at 8:30 a.m. in the Council Chambers at City Hall, with Mayor Maureen Copelof presiding. 

**Present -** Mayor Maureen Copelof, Mayor Pro Aaron Baker, and Council Members Pamela Holder, Lauren Wise and Dean Lytle 

## **Absent** – Council Member Gary Daniel 

**Staff Present** –City Manager Wilson Hooper, City Clerk Denise Hodsdon, Assistant City Manager/Finance Director Dean Luebbe, Assistant City Manager David Todd, Assistant to the City Manager Shawnee Cummings, Planning Director Paul Ray, Human Resources Director Kelley Craig, Police Chief Christy Wentzell, Fire Chief Chase Owen, Public Works Director Wesley Shook, Water Treatment Plant ORC Dennis Richardson, Wastewater Treatment Plant ORC Aaron Winans, and Community Center Director Tyree Griffin, Assistant Planning Director Aaron Bland, and Senior Planner Emily Brewer 

**Press –** David Bradley, Transylvania Times 

**A.  Welcome and Call to Order** – Mayor Copelof called the meeting to order at 8:30 a.m. and welcomed those present. 

**B.  Certification of Quorum** – City Clerk Denise Hodsdon certified a quorum present.  Mr. Baker moved, seconded by Ms. Holder to excuse Council Member Daniel. The motion carried unanimously. 

**C.  Approval of Agenda** – Mr. Baker moved, seconded by Ms. Holder to approve the agenda as presented.  The motion carried unanimously.  A copy of all workshop materials is on file in the Clerk’s Office. 

## **D.  Regular New Business** 

**D-1.   Award of Hillview Culvert Construction Contract** – David Todd explained that the City received four bids to replace the culvert on Hillview Street that was damaged during Tropical Storm/Hurricane Helene.  Bids were opened on March 24, 2026 and the lowest bid was from Hyatt Pipeline in the amount of $1,108,748. Based on an analysis of the bids received, and of the qualifications required, the City’s engineer WSP USA, Inc. recommends award of the project to the low bidder Hyatt Pipeline, LLC.  This amount is less than the most recent construction estimate provided by WSP, which is $1,302,304 of a total Estimated Project Budget of $1,741,823. 

Mr. Baker moved, seconded by Mr. Wise to approve the Resolution Awarding the Construction Work for the Hillview Street Culvert Replacement Project.  The motion carried unanimously. 

## **RESOLUTION NO. 2026-15** 

## **A RESOLUTION AWARDING THE CONSTRUCTION WORK FOR THE CITY OF BREVARD HILLVIEW STREET CULVERT REPLACEMENT PROJECT** 

**WHEREAS** , in September of 2024, the City of Brevard was struck by Tropical Storm/Hurricane Helene.  The storm caused significant damage throughout the city and surrounding county.  The storm damage impacted the Hillview Street Culvert and created a sinkhole in the road, sidewalk, and ground adjacent to the culvert caused by the storm eroding the bottom of the culvert.  The damage was reported to FEMA and has been identified as FEMA Project Number 815595 (The Project); and 

Minutes – Brevard City Council Budget Workshop – April 10, 2026 

Page 3 of 137 


{1}------------------------------------------------
JULY 20, 2026 REGULAR MEETING VOLUME 23 PAGE 334 

**WHEREAS** , the City of Brevard has worked with WSP USA, LLC, the engineer of record, for The Project, and has determined that the estimated total project cost, revised to reflect actual construction bids and including a 10% contingency, is $1,306,759.30; and 

**WHEREAS** , the Project has received approval and permits from the North Carolina Department of Environmental Quality (NCDEQ), state regulating agency and from the U.S. Army Corps of Engineers, federal regulating agency; and 

**WHEREAS** , The Project has followed the required FEMA processes, and FEMA’s total project cost estimate is $1,359,098.27, and FEMA has committed to fully funding the project based on “Actual Costs” versus the FEMA estimate or the City’s estimate; and 

**WHEREAS** , the City of Brevard has placed The Project out to public bid under state requirements, and has received bids that are within the established budget for The Project; and 

**WHEREAS** , in accordance with G.S. 143-129 and FEMA requirements, the City of Brevard received formal bids for the Hillview Street Replacement Culvert Project at 1:00 PM on Tuesday, March 24, 2026 at Brevard City Hall; and 

**WHEREAS** , the City of Brevard, upon recommendation of the City’s Consulting Engineers, WSP USA, LLC., desires to accept the low bid, award and construct The Project; and 

**WHEREAS** , after receiving the Bid Tabulation from this bid opening for the proposed project, the Brevard City Council now desires to approve an award of contract. 

## **NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BREVARD, NORTH CAROLINA THAT:** 

1.  A construction contract for Hillview Street Culvert Replacement Project is hereby awarded to Hyatt Pipeline, LLC of Canton, NC for the bid price of **$1,018,748.00** as received at 1:00 P.M., on Tuesday, March 24, 2026, in accordance with the City’s bid documents, produced by the designer of record WSP USA, LLC. for this Project. 

2.  The City Manager is authorized and directed to sign a construction contract with Hyatt Pipeline, LLC. 

3.   The City Manager is authorized and directed to take all necessary actions required to complete The Project, including all close out documents. 

4.   The City Manager is authorized and directed to process and approve any required change orders up to The Project’s budget limit that may be needed to complete The Project. 

5.  The City Manager shall advise the Council periodically on the status of The Project. 

6.  This Resolution shall become effective upon its adoption and approval. 

Attest: s/ Denise Hodsdon, CMC, NCCMC, City Clerk s/ Maureen Copelof, Mayor 

## **E.  Introductory Matters** 

**E-1.  Proposed Dependent Coverage Subsidy Cap** – Kelley Craig reviewed Staff’s proposal to cap the amount of subsidy offered to employees who opt for dependent health coverage.  She explained that this year there will be a 2% increase in health insurance premiums, which equates to approximately $75,000.  The City spends between $1.5M to $2.5M per year on healthcare costs.  In looking for ways to continue to make the plan feasible and maintain the level of benefits offered to employees, staff are recommending that Brevard adopt an approach to dependent coverage more in line with our peer agencies by capping the city's subsidy.  Staff proposes a gradual decrease in subsidy over the next four fiscal years capping the subsidy at 75% in FY30. For FY27, the subsidy would change from 86% to 83%. In FY27, this proposal would yield approximately $25,426 in additional premium collections, mitigating the strain to the budget caused by the ever-increasing cost of healthcare.  Staff have performed additional analysis and concluded that as long as Council approves the 2.7% cost of living adjustment (COLA) proposed in the budget, no employee will see a lower paycheck in FY27 because of this action.  Under this plan, the subsidy would cap at 80% in FY28, 77% in FY29, and 75% in FY30. 

Minutes – Brevard City Council Budget Workshop – April 10, 2026 

Page 4 of 137 


{2}------------------------------------------------
JULY 20, 2026 REGULAR MEETING 

VOLUME 23 PAGE 335 

Mr. Hooper noted that in recent years the City has subsidized the cost of health insurance for its workforce via a surplus in the Health Insurance Reserve Fund.  The balance has dwindled down to approximately $40,000, so the full cost of insurance for employees must be borne by the budget.  The recommended budget includes $17,000 per employee budgeted for FY27.  This increase is needed to account for increased health insurance costs even with the subsidy cap factored in. 

**E-2.  Budget Workshop Stage-Setting Remarks** – Mr. Hooper noted that as presented, the budget is not balanced.  There is a $1.38M gap between where we want to be and where we can be with the projected revenues.  There are two significant pieces of information that staff need before we can make a productive attempt to balance: 

- Whether Transylvania County will fund its portion of proposed enhancements to Fire staffing 

   - If they agree, it will reduce the City’s budget by approximately $160,000 

- Whether we receive funding from the State’s Helene Recovery Recycling Infrastructure (HRRI) grant for 

   - Purchase of 98-gallon tipper carts for residential garbage collection, increasing the efficiency of that service and decreasing the number of manhours needed 

   - The need for a new garbage truck would be eliminated, thus reducing the budget gap by $62,500 

The budget proposal scenario is built with the following assumptions factored in: 

- No decreases to external service levels 

- Transylvania County _does not_ fund 48% of 3 new FT Fire positions; _nor do_ they fund 48% of the proposed increase to PT staffing increases 

- Brevard does not receive the HRRI grant 

- The proposed FY26 Supplemental Spending Plan is adopted 

- A 2.7% COLA is adopted for all full-time employees 

- The cap on dependent health care coverage subsidy is adopted 

- All proposed General Fund capital purchases are financed 

- Staff -implemented operational savings 

- The following revenue increases move forward: 

   - Regular 4% increase in both water and sewer consumption rates 

   - Proposed 4% increase in High Strength Waste Surcharge and Septage/ Digested fees is approved 

   - Franklin Pool entrance fee increase from $2 to $3/day 

- There are no legislative changes from Raleigh regarding property taxes; no unfunded mandates are added 

- There are no shocks to world economy 

- The City’s Cashiers Valley Rd. property sells before the end of FY27 for at least $50,000 

- All expected FEMA reimbursements are received 

Additional data points: 

- One penny on the tax rate equates to $202,800 

- One penny on Heart of Brevard tax rate equates to $8,150 

## **F.  General Fund** 

**F-1.  Revenue Review** - Mr. Hooper reviewed FY27 revenue projections for all funds and noted that overall, the assumption is that General Fund revenues are flat. Sales tax revenue is still growing, but at a slower rate than in the past few years. 

Minutes – Brevard City Council Budget Workshop – April 10, 2026 

Page 5 of 137 


{3}------------------------------------------------
JULY 20, 2026 REGULAR MEETING 

VOLUME 23 PAGE 336 

## **F-2.  GF Requests for Additional Funding/Notable Service Level Change** 

**Requests (includes Fire)** – Mr. Hooper reviewed requests for service level changes (SLCs) and changes to current level (CCLs): 

Minutes – Brevard City Council Budget Workshop – April 10, 2026 

Page 6 of 137 


{4}------------------------------------------------
JULY 20, 2026 REGULAR MEETING 

VOLUME 23 PAGE 337 

Minutes – Brevard City Council Budget Workshop – April 10, 2026 

Page 7 of 137 


{5}------------------------------------------------
VOLUME 23 PAGE 338 

JULY 20, 2026 REGULAR MEETING 

Mr. Hooper noted that there are a couple of changes to the SLC’s and CCL’s.  Chief Wentzell has dropped her request for Flock cameras and instead is asking to redirect that money to body cams and tasers, which would bump both of those numbers up from $25,000 each to $45,000 each. 

**F. 3.  Operating Units Line Item Detail** – Individual operating unit budgets were reviewed: 

- a. **Governing Board (including non-profit contributions)** – Total recommended is $282,000, including $135,500 for non-profit contributions. 

- b. **Administration (including HR and Communications)** – Total recommended is $1,192,800. 

- c. **Finance** – Total recommended is $844,200. 

- d. **Planning** – Total recommended is $1,012,900. 

- e. **Community Centers** – Total recommended is $186,300. 

Minutes – Brevard City Council Budget Workshop – April 10, 2026 

Page 8 of 137 


{6}------------------------------------------------
JULY 20, 2026 REGULAR MEETING VOLUME 23 PAGE 339 

- f. **Police Department** – Total recommended is $4,559,600.  Chief Wentzell reviewed her SLC’s and noted that the Department is using the leftover funds allocated for the Berry Dunn study to develop an immediate strategic plan, and she does not recommend moving forward with the second phase of the Berry Dunn study.  She is requesting to increase the budget for the Axon tasers and body cams as the costs have come back almost double of what was originally projected. She is also removing the $25,000 request for firearms update.  Mr. Hooper noted that two previously frozen positions have been unfrozen in this budget to help with reorganization of the Department. 

- g. **Public Works – Administration** – Total recommended is $744,300. 

- h. **Public Works – Buildings and Grounds** – Total recommended is $1,025,850. Mr. Hooper explained that the requests for increases include two new staff members and to reclassify two current staff members to match their level of responsibilities.  The proposed budget also includes funding for City Hall deferred maintenance and city-wide security cameras. 

- i. **Public Works – Garage** – Total recommended is $535,300. 

- j. **Public Works – Streets** – Total recommended is $1,073,225.  The increase includes two new staff members. 

- k. **Public Works – Powell Bill** – Total recommended is $268,000 

- l. **Public Works – Recreation** – Total recommended is $297,700. 

- m. **Public Works – Sanitation** – Total recommended is $1,560,200. **Supplementary Sanitation Information/Data** – Mr. Hooper noted that the proposal includes some large expenses, that if funded, he believes would relieve some of the pressure on other operating units in Public Works, and thus all four new Public Works positions may not be needed.  Tipper carts would make the sanitation service more efficient and cut down on the need to borrow staff from the Buildings and Grounds and Streets divisions.  He recommended that even if we don’t get the HRRI grant, it would still be worth doing and the tipper carts could be financed for $50,000 per year. Later in the meeting, Staff received word that the City was not awarded the HRRI grant. 

Mr. Hooper discussed a proposal to change the commercial recycling collection schedule in an attempt to reduce the requested Public Works positions.  He asked Council to consider dialing back commercial cardboard collection from 5 days a week to 3.  Following discussion, there was consensus to look at increasing the fee for commercial recycling and developing a tier system for service and fees for commercial cardboard collection. 

- **F-4.  General Fund Non-Departmental** – Total recommended is $2,163,907. 

- ~~ At 12:10 pm Council and Staff took a 35-minute break for lunch~~ 

## **G.  Fire Department Fund** 

**G-1.  Revenue Review** – Total projected revenue is $1,967,800, including a $1,195,182 transfer from the General Fund. 

**G-2. Operating Line Item Detail** – Total recommended is $1,618,400.  Mr. Hooper noted that the SLC’s include a series of options for Fire Dept. staffing that would each accomplish the goal of hiring at least 3 new full-time people, but in a different way. The draft budget includes paying it 100% by the City.  However, there are some 

Minutes – Brevard City Council Budget Workshop – April 10, 2026 

Page 9 of 137 


{7}------------------------------------------------
JULY 20, 2026 REGULAR MEETING 

VOLUME 23 PAGE 340 

alternatives and the possibility that the County funds their 48%.  There are alternatives of applying for SAFER grants to fund three or six new positions, which looks good in the first year, but costs would increase every year, and by year four and beyond the commitment would be $600,000 more in personnel cost.  There is also an alternative of hiring one new full-time engineer at a 100% share.  ALT 4 would fund the part-time salary line item adequately enough to have at least two people on every shift. 

- **a. Supplementary Fire Department Information/Data** – Chief Owen reviewed NFPA standards and Brevard’s response data.  He noted that as the call numbers increase the Department’s response time will continue to get higher if we don’t have the people to back that up.  He discussed the current staffing model with only three full-time engineers, noting that the remainder are part-time, and they have the option to come or not unless they are working a shift.  The Department responded to 3000 calls last year and the big issue is overlapping calls.  Chief Owen said that the part-time budget hours are a necessity, but three full-time people would allow him to keep a second truck up all the time.  Chief Owen reviewed the remainder of his SLC’s and CCL’s.  He has requested $21,000 for compensation adjustments to create a ranked structure within the department.  Mr. Hooper noted that this request is not included in the proposed budget. 

   - **G-3. Fire Fund Non-Departmental** – Total recommended is 349,400. 

**H.  Stormwater Fund** – Mr. Hooper noted that there are no recommended changes this year.  There is one more year to go with the master plan process.  When that master plan is completed, there will be some recommendations regarding the fee structure next year. 

**H-1.  Revenue Review** – Total projected is $209,000. 

- **H-2.  Operating Line Item Detail** – Total recommended is $209,000. 

- **H. Water/Sewer Fund** 

**I-1.   Revenue Review** – Mr. Hooper noted that the projected revenue includes the regular 4% increase to the consumption fee.  Total projected revenue is $7,782,900. 

## **I-2.  Water/Sewer Fund Requests for Additional Funding** 

Minutes – Brevard City Council Budget Workshop – April 10, 2026 

Page 10 of 137 


{8}------------------------------------------------
JULY 20, 2026 REGULAR MEETING 

VOLUME 23 PAGE 341 

Mr. Hooper noted even with all of these requests, there will still be a surplus of approximately $100,000. 

## **I-3.  Operating Units Line-Item Detail** 

- a. **Water Treatment Plant** – Total recommended is $1,223,700. 

- b. **Wastewater Treatment Plant** – Total recommended is $1,518,300. 

- c. **Utility Maintenance** – Total recommended is $2,390,200. 

- d. **Non-Departmental** – Total recommended is $2,650,700. 

**J.  FY26 Supplemental Spending Plan (SSP) as of April 2026** – Mr. Hooper presented his recommended FY26 Supplemental Spending Plan: 

Mr. Hooper asked Paul Ray to explain the proposed Jordan St. parking lot enhancement agreement with Pisgah Health.  Mr. Ray explained that Pisgah Health would give the lot to the City to create additional parking spaces in return for the City repaving their parking lot behind their building at an estimated cost of $12,000.  The City would also install a 4’ privacy fence for headlight mitigation.  Mr. Hooper clarified that this amount does not include paving our parking lot.  There was consensus to reduce the amount from $20,000 to $12,000, and to use the savings to fund audio visual equipment in the Council Chambers. 

There was also consensus to approve the security cameras for the Water Treatment Plant. 

Mr. Hooper noted staff is working on the bid documents for the Tannery North smokestack and vault removal.  He is waiting to get that number before bringing a funding plan to Council at a later time. 

Minutes – Brevard City Council Budget Workshop – April 10, 2026 

Page 11 of 137 


{9}------------------------------------------------
JULY 20, 2026 REGULAR MEETING 

VOLUME 23 PAGE 342 

Mr. Hooper then reviewed Reserve Account balances: 

There was some discussion regarding the Rosenwald Fund.  Mr. Hooper noted that it is Staff’s understanding that the available $98,971 is for construction of the Norton Creek Streambank enhancement in the years to come.  Mayor Copelof asked whether Council could decide to do something else with those funds and move the money out of that fund to another fund.  Mr. Hooper and Mr. Luebbe confirmed that that could be done. 

Mr. Hooper noted that the City’s policy regarding Unassigned Fund Balance requires maintaining an amount equivalent to 25% of the last General Fund expense.  Currently the estimated usable balance is $975,000 or approximately 31%.  He said he will ask Council to use a portion of that for the smokestack demolition but noted that Council could dip into this fund to balance the budget. 

## **K.   Straw Votes** 

**K-1** . **Review Adds and Deletes** – Mayor Copelof asked that Council have a discussion about what it thinks is an acceptable tax rate for the coming year.  Staff prepared an updated spreadsheet reconciling the adds and deletes that have been discussed so far.  Mr. Hooper noted that this new proposal keeps one of the Police Department’s positions frozen, which takes the total deficit to $1,136,205.10.  There was considerable discussion regarding ways to increase revenue and make cuts to SLC’s 

Minutes – Brevard City Council Budget Workshop – April 10, 2026 

Page 12 of 137 


{10}------------------------------------------------
JULY 20, 2026 REGULAR MEETING 

VOLUME 23 PAGE 343 

and CCL’s.  During discussion, there was consensus to look at increasing the Heart of Brevard MSD tax rate by 2 cents in order to reduce the amount of the contribution to the Heart of Brevard.  Council asked for clarity on the balance in the Rosenwald Fund and whether it is restricted for Norton Creek restoration.  Mr. Baker expressed concern that the Sports Complex parking lot and bathroom design was not included in the budget, which led to discussion about the need for a master plan for all parks and recreational facilities. 

**K-2.  Conduct Straw Vote** – There was consensus to accept the following adds/deletes, resulting in a tax increase of 2.5 cents. 

Minutes – Brevard City Council Budget Workshop – April 10, 2026 

Page 13 of 137 


{11}------------------------------------------------
JULY 20, 2026 REGULAR MEETING VOLUME 23 PAGE 344 

**L.  Adjourn –** There being no further business, at 4:42 p.m. Ms. Holder moved, seconded by Mr. Baker, to adjourn the workshop.  The motion carried unanimously. 

Maureen Copelof Mayor 

Denise Hodsdon, CMC City Clerk 

Minutes Approved:    June 1, 2026 

Minutes – Brevard City Council Budget Workshop – April 10, 2026 

Page 14 of 137 


{12}------------------------------------------------