{0}------------------------------------------------

{1}------------------------------------------------

![](_page_0_Picture_0.jpeg)

# Planning & Zoning Commission 9/3/2025 DRAFT ACTION MINUTES

These action minutes are intended to provide the reader with an overview of the committee meeting and actions taken during the meeting.

For detailed information on this meeting, please refer to the meeting [recording,](https://www.youtube.com/watch?v=RsCSpVuP7KY) also located on the commission web page, [ashevillenc.gov/pzc,](https://www.ashevillenc.gov/department/city-clerk/boards-and-commissions/planning-and-zoning-commission/) or contact Will [Palmquist](mailto:wpalmquist@ashevillenc.gov) with any questions.

**Present:** Chair Geoffrey Barton, Jane Margaret Bell, Brenton Faircloth, Jason Seickel, Jared Wheatley.

**Absent:** Anna Zuevskaya

### AGENDA ITEM ACTION

## Planning & Zoning Commission Land Acknowledgment

Chair Barton read the PZC Land Acknowledgement: "As we are gathering today as the Planning and Zoning Commission, the body tasked with reviewing and advising on appropriate land use in the city of Asheville, it is fitting to acknowledge the storied history of this land.

We occupy the Land of the Cherokee people, who have stewarded and been in relationship with these mountains and waterways from time immemorial. This land is occupied through violence, oppression, coercion, broken treaties, and forced relocation.

Please join me in expressing respect and gratitude for the present-day Eastern Band of Cherokee, the Cherokee Nation, the United Keetoowah Band of Cherokee, and all of our Indigenous neighbors, as well as the past and present marginalized community members, as we seek to join in the healing of the indelible trauma that is embedded in this land."

## Approval of minutes from the August 6, 2025, meeting

**Motion:** Approve minutes

**Motion made by:** Commissioner Faircloth **Motion 2nd by:** Commissioner Wheatley

**Vote:** Motion passes 5-0 [\(Motion](https://www.youtube.com/live/YNygc3RJqhQ?si=BHB-W6L-MP6dSZeP&t=627) made at 10:27)

Conditional zoning amendment request for properties located at 1617 Hendersonville Rd for the purposes of amending the site plan and project conditions.

**Motion:** Approve with the following conditions: 1) Incorporation of the amended "E1 conditions", as presented, with additional clarification that the funds for the buffer landscaping on the Ramble HOA property shall be transferred to the Ramble HOA or its designee; 2) Amendment of Project Condition #4 to state a maximum total new building square footage of 822,300 sq. ft. and a maximum total new unit count of 261; and, 3) An additional condition for a sidewalk connection along Salisbury Drive.

{2}------------------------------------------------

**Motion made by:** Chair Barton **Motion 2nd by:** Commissioner Bell

**Vote:** Motion passes 4-1 (Wheatley "No") ([Motion](https://www.youtube.com/live/YNygc3RJqhQ?si=SczcTgeu20fY6iB0&t=13260)

made at [3:41:00](https://www.youtube.com/live/YNygc3RJqhQ?si=SczcTgeu20fY6iB0&t=13260))

Will Palmquist, Principal Planner with Planning and Urban Design, presented the application to amend the conditional zoning for properties located at 1617 Hendersonville Rd, which would allow for the expansion of the Deerfield Episcopal retirement community. Mr. Palmquist also discussed the changes to the project that the applicant made from the last meeting.

The applicant explained the site plan and specifically proposed to move the grounds maintenance building off-site due to the residents' concerns. The applicant also provided information regarding the water feature removal and the proposed use for the parking located towards the southeast of the property.

The commission and applicant engaged in a detailed discussion to clarify conditions. The applicant confirmed a maximum total building square footage of 822,300 sq ft and a maximum of 261 new units. The applicant also clarified their willingness to accept conditions that restrict the parking lot's use and ensure proper landscaping and pedestrian connectivity, including sidewalks along Salisbury Road. The commission also sought to ensure the applicant's commitment to these conditions would be enforceable.

#### Public Comment:

**Lack of Specificity:** The community expressed frustration with the conceptual nature of the plans and the 10% variance for building size and unit count, fearing it could lead to increased impacts without further review. The applicant clarified that the intent is to provide flexibility for design shifts and not to increase overall density.

**Parking Area:** The proposed parking lot on the site of the former grounds building was a major point of contention. Neighbors expressed concerns about the type of vehicles allowed, potential for light industrial use, and the overall aesthetic impact. The applicant amended the project conditions to be more specific about the use of this area, limiting it to personal vehicles and stating it will not be used for construction staging or trash storage.

**Landscaping and Buffers**: The plan includes a commitment to supplemental plantings in the buffer areas and a monetary contribution to the Ramble Homeowners Association (HOA) for off-site landscaping. City legal staff confirmed that an agreement to provide funds to a third party is an enforceable condition, as long as it is directly related to a project impact.

Special use permit request for a concealed telecommunications tower at 3 S. Tunnel Rd.

**Motion:** Approve special use permit **Motion made by:** Chair Barton

**Motion 2nd by:** Commissioner Wheatley

**Vote:** Motion passes 5-0 (Motion made at [7:18:52](https://www.youtube.com/live/YNygc3RJqhQ?si=qq8DfrTfIrVWMzcD&t=26332))

Conditional zoning amendment request for property located at 767 New Haw Creek Rd for the purposes of amending the site plan and project conditions.

**Motion:** Approve with the condition that the crest of the new bridge must be designed to a standard that matches the 100-year base flood elevation. **Motion made by:** Commissioner Wheatley

**Motion 2nd by:** Chair Barton

**Vote:** Motion passes 5-0 (Motion made at [8:50:46](https://www.youtube.com/live/YNygc3RJqhQ?si=9ETMA_RihrD-9U1T&t=31846))

{3}------------------------------------------------

Sam Starr-Baum, Planner III with Planning and Urban Design, presented the request to amend the conditional zoning for the property at 767 New Haw Creek Rd for the purposes of amending the site plan and project conditions.

Mr. Starr-Baum explained that The applicant is now requesting to revert the access point to New Haw Creek Road. The unit count (84 units) and other PZC-requested conditions (such as preserving topsoil and providing a ball field connector) remain. The primary change is the main access point via a new bridge over New Haw Creek. The applicant wants to retain the rights to both the previously approved Sleepy Hollow plan and the new New Haw Creek plan.

Residents voiced strong opposition to the new bridge and development in the flood plain. They showed photos of past flooding and damaged infrastructure, arguing that more impervious surfaces would worsen flooding downstream. Some questioned whether the development's proposed storm tech system could handle a major storm and whether the city's current development rules are sufficient given recent weather events. There was also a concern that the developer was breaking a prior agreement and that the new bridge was being proposed solely for financial reasons, not for the community's benefit.

The PZC acknowledged the validity of the public's concerns about flooding but clarified the procedural sequence. They explained that their role is to make a land-use recommendation to the City Council, not to approve the technical plans. The mandatory H&H flood study and permitting process occur after this legislative step, and the developer cannot begin construction without a completed and approved study. The commission also considered whether to add a condition to ensure the bridge's design meets a specific height standard.

Meeting adjourned at 11:48 p.m.

{4}------------------------------------------------

## Planning & Zoning Commission 9/3/2025

## QUASI-JUDICIAL PUBLIC HEARING SUMMARY MINUTES

● A request for a special use permit for a concealed telecommunications tower at 3 S. Tunnel Rd. The property is identified as PIN 9658-13-5696 in the Buncombe County tax record. The property owner is Asheville Mall Capital Holding LLC. The applicant contact is Mr. Michael Sandifer. Planner coordinating review - Will Palmquist

Will Palmquist, Principal Planner with Planning and Urban Design, presented the request. The site is the rear of the existing Asheville Mall, zoned Urban Place (UP). The proposal is for a 135-foot tall concealed telecommunications facility.

Mr. Palmquist Palmquist displayed aerial imagery and site plans, showing the tower's location in the southern portion of the parking lot, near a parking deck, on a 41-acre property. He explained that concealed towers are an allowed use in the UP district with an SUP. The application was reviewed against the seven general SUP standards and other specific requirements for concealed telecommunication towers, including sighting, design, and screening.

He noted the applicant's request for two technical modifications: 1) To allow a height of 135 feet, which exceeds the UDO's 100-foot limit for concealed towers. 2) To substitute required vegetative screening with a wooden privacy fence, a decision staff found acceptable under the UDO's provision for alternative screening. He also detailed a specific condition related to the tree canopy preservation standards in the UDO, which requires a 10-foot wide buffer along the property boundary to preserve existing trees, in accordance with the state's temporary Hurricane Helen recovery bill.

Chair Barton asked for more information on the justification for the height modification. Palmquist reiterated that the applicant's rationale relates to achieving better wireless signal distribution due to topography.

Commissioner Wheatley questioned the "bonafide need" requirement for the tower. Palmquist deferred to the applicant's engineers, noting that in the past, applicants have addressed this by demonstrating the lack of other suitable towers in the vicinity.

Mr. Tom Johnson, attorney for Vogue Towers, began by formally requesting that the application, associated documents, and the staff report be entered into evidence. He also explicitly stated the applicant's agreement to the tree canopy preservation condition.

Mr. Michael Sandifer, project manager, provided a brief introduction. He explained that the facility would be a "multi-provider" site, with Verizon Wireless as the primary co-applicant, but space available for other carriers like AT&T and T-Mobile. He clarified that the structure would be 130 feet, with the total height of 135 feet including the lightning rod. He also mentioned that Vogue Towers' sites are made available to local emergency services for rent-free use.

Mr. Sam Camil, Verizon's senior RF Engineer, was tendered and accepted as an expert witness. He presented a map showing existing and proposed coverage. He explained that the issue in the area is not a lack of coverage, but a lack of capacity. The existing sites are "taking

{5}------------------------------------------------

too much traffic," leading to slow data speeds and poor user experience, especially in a dense commercial area.

He justified the 130-foot height, explaining that it is crucial for a "proper propagation" of the signal. Lower heights would be susceptible to interference from terrain and buildings, particularly for higher-frequency 5G signals. He stated that their analysis showed a significant offload difference of 27% to 44% between a 100-foot and 130-foot tower.

He also confirmed that other potential locations, such as a power pole on the edge of the quarter-mile radius, were deemed unsuitable due to being at a significantly lower elevation (approximately 50 feet lower).

Mr. Michael Burkowitz, a certified general appraiser, was tendered and accepted as an expert. He presented an impact study based on his research of other towers in the Asheville area. He concluded that the proposed tower "will not substantially injure the value of adjoining or abuting properties."

His rationale was that the existing influence of the mall (noise, lighting, parking) is a much more significant factor on property values than the addition of a monopine tower. He described the mall as a "failing regional mall" that is an existing "blight" on the area. He noted that the monopine design helps the tower blend in with the surrounding trees and topography, further minimizing any potential visual impact.

Mr. Tom Johnson summarized the applicant's case, reiterating that they had met all UDO standards and that the evidence presented supported the requested modifications.

Philip Hawkins (White Pine Drive) attempted to present information from a physicians' website about the health effects of RF emissions. This was objected to by the applicant's attorney and confirmed by City Legal to be inadmissible testimony under NC General Statute 160D-932, which expressly prohibits local governments from regulating or considering RF emissions from wireless facilities.

Ellen Aldrich (298 White Pine Drive) testified that the proposed tower would be in her backyard and would not be concealed. She presented photos from her deck showing that the tower would be visible. She raised concerns about the mall's poor maintenance, ongoing issues with noise and homelessness, and the potential for the tower to fall on her home during a storm. She appealed to the commission to help find an alternate location.

Devin Hilgenamp (302 White Pine Drive), the closest resident to the proposed site, reiterated the visual impact and expressed deep concern over a significant financial investment in their home. He questioned the "bonafide need," stating that he and his fiancée, both remote workers, have no connectivity issues. He also challenged the photo simulations, stating they do not accurately represent the view from his property.

Sharon Sumrall raised a concern about the proposed wooden fence, predicting it would attract graffiti and contribute to a "Trashville" image. She advocated for vegetative screening, stating it would be more effective at concealing vandalism.

The commissioners acknowledged the public's frustration but were bound by the quasi-judicial process.

{6}------------------------------------------------

The primary point of deliberation was whether the applicant had met the burden of proof for the 135-foot height modification.

Commissioner Wheatley and Commissioner Seickel questioned the logic of having a 100-foot height limit if an applicant could always argue for more height based on the technical benefit. They pointed out that the public had not presented any counter-expert evidence.

Ms. Jannice Ashley clarified the legal position: the board could not deny the application based on the "business needs" of the provider, which include the determined height. She explained that if the board were to deny the application, it would need to articulate a specific reason based on the seven SUP standards, such as the height being out of harmony with the neighborhood, but cautioned that this would be difficult without evidence to counter the appraiser's testimony.

Commissioner Seickel reluctantly stated that he found the evidence provided by the applicant to be sufficient, noting the lack of "competent material and substantial evidence" from the opposition to justify a denial.

Chair Barton moved to approve the Special Use Permit based on the competent, material and substantial evidence presented at the hearing, because the proposal meets the seven Special Use standards outlined in Section 7-16-2. (c) of the City of Asheville Unified Development Ordinance. The motion was seconded by Commissioner Wheatley and carried unanimously.

A copy of the written decision approving the variance is attached hereto and incorporated herein by reference.
