# Greenway Committee

**Body:** City of Asheville — Greenway Committee
**Date:** February 3, 2022 3:30 PM EST (2022-02-03T15:30:09-05:00)

**Link:** https://sunshinemeetings.org/event/5055/greenway-committee-feb-3-2022
**Outcome:** The Greenway Committee accepted the minutes and reviewed the new Close the Gap plan, which prioritizes projects based on equity and safety.

## Summary

The City of Asheville’s Greenway Committee held a virtual monthly meeting on February 3, 2022, focusing on updates to current infrastructure projects and a detailed presentation of the city’s new "Close the Gap" (GAP) plan. The primary agenda items included status reports on several active greenway developments and a comprehensive review of the updated Greenway, ADA Transition, and Pedestrian plans developed by Jaffa Planning & Design and Equinox Environmental.

The only formal decision made during the meeting was the acceptance of the minutes from the previous session. A motion was made and seconded to approve the minutes, and the chair proceeded to the next item, indicating acceptance. No changes were made to the agenda, and there was no public comment period, as the chair confirmed that no members of the public were present to speak.

Staff provided detailed updates on several ongoing projects. Construction on the French Broad River West Greenway is underway, with grading complete but asphalt installation delayed until spring due to current conditions; staff requested the committee help discourage the public from entering the closed construction zone. The Swannanoa River Greenway is at 90% review, with staff coordinating with Duke Energy on lighting and addressing a minor design change for the spur trail connecting to Wood Avenue. For the Nasty Branch Greenway, design is 99% complete, and construction is estimated to begin this spring. Additionally, a $300,000 feasibility study is being prepared for the North Rad Tip Greenway, with the city hoping to issue requests for letters of interest within two to three months. Staff also noted that a public meeting is scheduled for February 28 to discuss converting Merriman Avenue to a three-lane road to accommodate bike lanes and wider sidewalks.

A significant portion of the meeting was dedicated to the "Close the Gap" plan, which replaces the 2012 Greenway Plan. The plan introduces four distinct greenway typologies: Spine Greenways (14-foot target width), Arterial Greenways (12-foot target width), Neighborhood Greenways (on-street "bike boulevards" with traffic calming), and Natural Surface Trails. Projects were prioritized based on destination access, equity, safety, connectivity, and public input. The presenters outlined the top 10 prioritized projects, including the Swannanoa Greenway, Bowcatcher Greenway, and Reed Creek Greenway. Christy Carter of Jaffa Planning clarified that prioritization does not always equal the order of construction, as funding sources and project complexity may cause less prioritized projects to be built first.

Discussion regarding the plan highlighted the importance of safety and accessibility. Mike Zerkowski emphasized the need for lighting on Arterial Greenways, noting that these routes are often more secluded and potentially dangerous at night. He also mentioned that the city’s dark sky initiative was considered during the lighting design process. Kim Williams of Equinox Environmental explained that Neighborhood Greenways are a new concept involving low-traffic residential streets enhanced with traffic calming methods and wayfinding to improve safety. The committee expressed a desire to standardize lighting, signage, and benches across all greenways, with staff noting that the I-26 connector greenway lights may become the standard.

Several follow-up actions were agreed upon during the meeting. Committee members are asked to provide feedback on the "Top 10" greenway projects to staff within one week, while general feedback on typologies is requested by the next committee meeting. Staff agreed to send the Duke Energy light catalog to the Transit department to facilitate coordination between greenway and bus stop lighting improvements. Additionally, the consulting team stated they will release the final survey and online mapping tools to the general public on February 14.

This meeting is significant for residents as it outlines the strategic direction for the city’s pedestrian and cycling infrastructure. The introduction of specific greenway typologies aims to create a more tailored and safe network, while the prioritization of projects based on equity and safety metrics ensures that resources are directed toward areas with the greatest need. The upcoming release of public mapping tools will allow residents to engage further with the planning process.

## Video & Transcript

- Recording: https://www.youtube.com/watch?v=qztwgPWthpI
- Transcript: https://sunshinemeetings.org/transcript/2856/segments

## Sources

- [YouTube video](https://www.youtube.com/watch?v=qztwgPWthpI)