# Multimodal Transportation Commission

**Body:** City of Asheville — Multimodal Transportation Commission
**Date:** August 25, 2021 3:00 PM EDT (2021-08-25T15:00:06-04:00)

**Link:** https://sunshinemeetings.org/event/5148/multimodal-transportation-commission-aug-25-2021
**Outcome:** The Multimodal Transportation Commission heard presentations on the Hendersonville Road and Tunnel Road corridor studies and the Close the Gap greenway plans, noting that staff would incorporate meeting comments as amendments.

## Summary

The City of Asheville Multimodal Transportation Commission met on August 25, 2021, to review recent minutes and hear detailed presentations on three major transportation initiatives. The agenda included the Hendersonville Road Corridor Study, the Tunnel Road Corridor Study, and the Greenway ADA Transition & Pedestrian Plans, known as "Close the Gap." The meeting focused on transitioning key corridors from automobile-dependent routes to multimodal networks and prioritizing sidewalk and greenway improvements based on equity, safety, and connectivity.

**Key Decisions**
The commission approved the meeting agenda and the minutes from the July 28, 2020 meeting. Both motions passed unanimously with five ayes. During the minutes review, Randy Warren requested two clarifications: one to specify that the bike-share program includes both e-bikes and human-powered bikes, and another to clarify that local interests do not conflict with state Complete Streets and Vision Zero policies. Staff agreed to make these changes. No other formal votes were recorded, and the meeting concluded with the chair adjourning the session.

**Discussion Highlights**
Presenters Tristan Winkler, MPO Director, and John Ridout, Regional Transportation Planner, presented the Hendersonville Road and Tunnel Road Corridor Studies. The Hendersonville Road study focuses on creating a distinct urban identity through urban context zones, controlled left turns, and improved grid connectivity. The Tunnel Road study aims to separate local and regional traffic, proposing a road diet in the northern section and a potential parallel road. In response to questions from Michael Stratton, Ridout explained that the road diet serves local traffic while keeping regional traffic on the main corridor, and that increased neighborhood connectivity is expected through redevelopment. Christy Stout, a consultant, noted that road diets are a proven crash reduction factor, citing a 15-30% reduction.

Regarding the "Close the Gap" project, Lucy Crown, Greenway Planner, and consultants Christy Carter and Christy Stout presented a prioritization framework for sidewalk and greenway improvements. The network was categorized into Major Greenways, Minor Greenways, and Neighborhood Greenways. Maggie Holman raised concerns about the racial makeup of public engagement participants and whether stipends were offered to ensure inclusivity. Michael Stratton inquired about rapid transit, to which Ridout explained that the team relied on the existing Transit Master Plan rather than making specific recommendations in the corridor study. Another commission member asked about dynamic speed limits on Hendersonville Road and expressed concern that conceptual drawings showed wide turning radii and missing crosswalks. Ridout acknowledged that the drawings are conceptual and confirmed that comments made during the meeting would be adopted and augmented to the plan as amendments.

**Community Input**
A public commenter raised concerns about equitable infrastructure development and gentrification in legacy neighborhoods, specifically mentioning the Emma and Shiloh communities. The commenter asked if the project team’s work would incorporate these equity concerns. Staff responded by explaining the role of the Citizens Advisory Committee and specific outreach efforts by City staff in neighborhoods with high gentrification risks. Staff stated that for the Emma community, the city would not actively pursue greenway lines until a neighborhood stabilization plan is in place. Staff also confirmed that recommendations for neighborhood greenways will require detailed public engagement and initial studies to ensure they meet specific community needs, such as filling sidewalk gaps rather than building full greenways if that is the preference.

**Follow-ups**
Staff confirmed that the online survey for the "Close the Gap" project is live and that focus groups for individuals with disabilities are scheduled for the first two weeks of September. Staff also confirmed that City staff are actively meeting with neighborhoods, particularly those with high gentrification risks, to gather input. Additionally, staff confirmed that comments made during the meeting regarding the corridor studies, specifically regarding design details and bike lanes on Overlook Road, would be adopted and augmented to the plan as amendments.

**Impact**
These discussions are significant for residents as they outline the future physical changes to major transportation corridors and pedestrian infrastructure. The corridor studies aim to improve safety and connectivity by reducing the dominance of regional automobile traffic, while the "Close the Gap" project prioritizes the construction of sidewalks and greenways to ensure equitable access to destinations. The commitment to incorporate community input, particularly regarding gentrification risks and accessibility, indicates that the final plans will reflect local needs and safety concerns.

## Video & Transcript

- Recording: https://www.youtube.com/watch?v=9CzyM6LaISE
- Transcript: https://sunshinemeetings.org/transcript/2951/segments

## Sources

- [YouTube video](https://www.youtube.com/watch?v=9CzyM6LaISE)