**Outcome:** The Greenway Committee voted unanimously to proceed with public engagement to name the east bank of the French Broad River Greenway the "Wilma Dykeman Greenway.

## Summary

The City of Asheville Greenway Committee held a virtual meeting on January 7, 2021, to review updates on current and future greenway projects, discuss public survey results, and address the naming of a new river trail. The committee began with introductions for new members, including a retired teacher/principal, a transportation planner, an ESL teacher/ceramicist, and representatives from Asheville on Bikes and River Link.

**Key Decisions**
The committee took two formal votes during the session. First, a motion was made and seconded to approve the minutes from the last meeting; the motion passed unanimously. Second, the committee voted to proceed with public engagement to name the east bank of the French Broad River Greenway (from Amboy Road to River Broadway) the "Wilma Dykeman Greenway." This motion was also seconded and passed unanimously. Staff clarified that the intent is to present this specific name to the public for a "yes/no" vote rather than soliciting new name ideas, noting that the name has been associated with the riverway for 30 years.

**Project Updates and Discussion Highlights**
Staff provided detailed updates on several active projects. The French Broad River Greenway West is out to bid until January 28, 2021, with construction expected to begin in March. This project will pave the dirt section under Amboy Road, creating a continuous 3-mile paved greenway from Craven Street to Hominy Creek River Park. Staff noted that the city will close the section to camping and recreation, working with homeless services and police to assist residents in moving out. The Nasty Branch Greenway is being finalized to go out to bid in March, with construction expected in late spring or early summer. For the Bowcatcher Greenway, staff are considering using modified 2017 plans to build sections with available funds.

Regarding the "Close the Gap" survey, staff reported that 1,436 people had taken the survey as of January 6, with the deadline extended to January 18 to allow for more targeted outreach. Staff expressed concern about low response rates from historically Black and Hispanic neighborhoods, despite efforts to reach these communities through local media and direct invitations. Survey results indicated that "correct drainage" was the top requested improvement, and respondents were overwhelmingly positive about the "Asheville Unpaved" initiative for natural surface trails. Staff outlined two directions for this initiative: trails on large public lands and neighborhood trails connecting cul-de-sacs via easements, with public engagement expected to begin within the next month.

A significant portion of the discussion focused on bridge improvements and state funding. Staff highlighted the lack of safe pedestrian and bicycle connections between the east and west banks of the French Broad River. The Smith Mill Bridge (Craven Street) has limited funds in the DOT Transportation Improvement Program (TIP), which is insufficient for a full rebuild. Staff identified a potential short-term fix of narrowing vehicle travel lanes to widen the sidewalk, pending DOT approval, while the Amboy Road/Meadow Road bridge replacement is currently slated for 2029. A representative from Asheville on Bikes expressed a "less optimistic" perspective regarding NCDOT’s history of ignoring active transportation investment, urging the committee to continue pressuring the MPO and NCDOT to prioritize safety improvements. In response, the Chair stated she had written a letter to the Multimodal Commission requesting they pressure NCDOT and encouraged members to attend the next Multimodal Commission meeting to make public comments.

**Community Input**
While there was no formal public comment period, a representative from River Link spoke about the naming process, suggesting that if the "Wilma Dykeman" name did not receive majority support, the committee might need to create a new poll including other suggestions. She also emphasized the need to educate the public about who Wilma Dykeman was. Staff responded that the intent was to keep the process simple with a yes/no question on the proposed name. Additionally, a representative from Asheville on Bikes spoke about NCDOT’s reprioritization of projects, stating that the organization has a responsibility to create transportation facilities for all modes, something they historically have not done.

**Follow-ups**
Staff agreed to send a link to the next Multimodal Commission meeting and the email address for Tristan Winkler to members who wish to comment on the Smith Bridge/Amboy Road issues. Staff will also send a meeting invite with logistics for the February 4 field trip, follow up with River Link to determine how to initiate the public engagement process for the greenway naming, present an update on the "Asheville Unpaved" initiative at the next meeting, and consult with the consultant regarding the nuance between "commute" and "commuting to work" in the survey data. The Chair agreed to reach out to Terry Mansville at Bike Walk NC regarding state-level advocacy for DOT prioritization and to coordinate with staff to determine the location for the February field trip. Members suggested that the field trip include a visit to the Swannanoa River section to see pre-build conditions or the Maskey Branch corridor to see its connection to South Slope revitalization plans.

**Impact**
These decisions and updates signal a shift toward active construction and public engagement for Asheville’s greenway network. The unanimous vote to name the east bank trail honors Wilma Dykeman, whose 100th birthday falls in the same month as the planned Earth Day opening of the greenway. The upcoming construction of the French Broad River Greenway West and the Nasty Branch Greenway will expand paved and natural surface trail access, while the committee’s continued pressure on state agencies aims to secure necessary funding for critical bridge safety improvements.

## Video & Transcript

- Recording: https://www.youtube.com/watch?v=2aMrqDtg9v8
- Transcript: https://sunshinemeetings.org/transcript/3343/segments

## Sources

- [YouTube video](https://www.youtube.com/watch?v=2aMrqDtg9v8)