The City of Asheville Design Review Committee convened on March 19, 2026, for an in-person meeting to conduct a formal Level III design review of a proposed development at 50 Coxe Avenue. The primary focus of the session was the evaluation of a large mixed-use project, alongside the approval of previous meeting minutes.

Key Decisions The committee took two formal votes during the meeting. First, the committee voted 6-0 to approve the minutes from the January 15, 2026 meeting. Second, the committee voted 6-0 to approve the 50 Coxe Avenue project with specific conditions. The approval included recommendations to reduce the size of the garage door on Coxe Avenue and the dumpster door on Sawyer Street, as well as to consider additional design elements such as planting selection, retail glass redesign, green roof stormwater management, noise mitigation, and increased vegetation in the area south of the building.

Discussion Highlights The project team presented a detailed overview of the proposed development, which includes 203 multi-family units, approximately 5,000 square feet of retail space, and a 7-story building totaling 251,000 square feet. The presentation highlighted the project’s alignment with the city’s ongoing Cox Avenue streetscape improvements, which are 75% complete, and its integration with Buncombe County property. Staff from Planning and Urban Design noted the partnership with the county and the importance of design compatibility with the new streetscape, which features wider sidewalks and a dedicated bike lane. The architecture team emphasized their commitment to adhering to fair housing regulations, specifically ensuring that all ground-floor units are fully accessible.

During the review, the committee discussed several technical challenges, including grading and utility coordination on Cox Avenue and the need for a noise study to address sound levels from nearby entertainment venues and the bus station. The committee also addressed the project’s parking plan, noting that the developer is seeking a waiver from the North Carolina Housing Finance Agency (NCHFA) because the project does not meet standard parking requirements, though it benefits from existing public transportation and downtown garages. Additionally, the committee encouraged the design team to explore options for creating a usable public space with plantings and lighting in the irregularly shaped area south of the parking deck.

Community Input Public comment was provided during the review of the 50 Coxe Avenue project. One commenter praised the overall design improvements, while another suggested adding more landscaping to enhance privacy around the townhouses on Sawyer Street. A third commenter questioned the accessibility requirements for the townhouses, and a fourth raised concerns regarding the parking requirements driven by the lender and potential noise impacts. The committee did not record specific responses to these individual comments.

Follow-ups The design team agreed to incorporate the feedback received from the committee into future iterations of the plans. Specific actions include exploring ways to reduce the size and improve the appearance of the garage door on Coxe Avenue, evaluating options for softening the building’s facade, and assessing the feasibility of reallocating brick materials to more visible areas. The team will also commission a noise study to inform mitigation strategies, investigate HFA parking waiver options, and continue coordinating with the city and county regarding the reopening of an alley as a one-way exit.

Impact This decision is significant for residents as it moves a major mixed-use development forward in the downtown area. The project will add 203 housing units and retail space, with the committee’s conditions aimed at ensuring the building integrates well with the newly improved Cox Avenue streetscape and mitigates potential negative impacts such as noise and visual bulk. The project will now proceed to the Planning and Zoning Commission for a conditional zoning request and subsequently to City Council for final approval.