Montford
Historic Resources Commission (In-Person) (Jun 10, 2026) · June 10, 2026 at 4:00 PM
Materials: Staff Report and Project Materials
What was said
Repair, replace, repaint minor amounts of existing material. damaged wood siding and trim. All work will be completed in accordance and approved with approved and attached drawings and plans. All permits, variances or approvals are required by law must be obtained before work may commence. Two, that the standards for paths and rails found on page 32 of the Albemarle Park Local Historic District Landscape Design Standards adopted July 8th, 2015 were used to evaluate this request. 3. The application does meet the design standards for the following reasons. A. Handrail is required per North Carolina Building Code, and handrail will be constructed of a dark-colored material. 4. That the action and improvements proposed in the application before us for a certificate of appropriateness are congruous with the special historic character of the Albemarle Park Historic District. Second. Second from Commissioner Gorman. Thanks, Jessica. She's gotta like go with it. - You can get me back on the server. Good luck. - Do you need some tech support? - Yes. - Yeah, ask the. Let me see what you're doing. I'm so good now. Right. All right. That's good. Yeah, I'm good. Perfect. Thank you. A lot going on. So I've got a fair amount of slides to get through, but I'm going to try to go as quickly as I can. There's really three main buckets of things here, or four really in some ways. One being, so like just to orient you, hopefully, I know there's some of you that weren't able to visit the site, but we did try to coordinate the site visit because if you went down there and even did a drive-by, you'll see that they still have safety fencing a post to lean erected around the buildings and so some of us were able to visit the site yesterday to check it out so the main the main scopes here main parts of the building we're going to talk about we're going to talk about the front porch we're going to talk about the the side yard and elevation on the north side of the church. And we're gonna talk about some interior walls within the library wing of the buildings where there's some doors and windows proposed for change. And then there's also some mechanical, things proposed in a couple other locations on the building aside from the north side of the building. So I'll walk you through those. So the first, sorry, there's a couple other things here to talk about that I don't want to get lost on, lost in the conversation today, but they're, the building has basement level windows that some are not original. Some are not there, I don't think at all, and they are proposing to infill those openings with brick as a future precautionary measure for flooding. They are also proposing to install a new basement-level metal entry door or gasketed door on north elevation. And then there's also proposing to do deployable floodwall protection. I still have some questions around that. I support the floodwall protection, depending on more information. I don't know what the I don't know enough about those systems to understand, like, are there going to be gaskets? The, um, the 1st, kind of bucket of mechanical equipment to talk through is certainly 1 that I have concern about this. You'll see on the site plan on the right hand side where the blue on the on the very far right? The blue. And to me that will be a big visible change from where you view this church from the street. And you will see it also, of course, from the front elevation because it will extend out and I'll get to the elevation drawing for that here shortly. I did ask for elevation looking from Hendersonville Road, but like looking at it from the south