Resolution to Adopt the Hazard Mitigation Plan
Board of Commissioners Meeting · June 16, 2026 at 5:00 PM
Documents
- item_3_presentation.pdfPDF · 13 pages
- item_3_draft_buncombe_madison_rhmp.pdfPDF · 637 pages
- item_3_resolution.pdfPDF · 2 pages
- agenda_packet_2026-06-16.pdfPDF · 784 pages
What was said
GAREN CREEK THIS EVENING FOR CONTRACT APPROVAL. AND THEN OUR MULTI-LANDSLIDE GROUP THREE HAS COMPLETED RFQ AND A VENDOR HAS BEEN SELECTED, AND THAT'LL BE IN A FUTURE MEETING ON-- ONCE THAT CONTRACT IS COMPLETED. FOR THIS--THESE PARTICULAR PROJECTS, I WANT TO JUST HIGHLIGHT THE COMMUNITY IMPACTS. WE HAVE EARLY ASSESSMENTS CONDUCTED WITH MUNCAH COUNTY TEAMS, STATE AND FEDERAL TEAMS. PART OF THE FEMA LANDSLIDE TASK FORCE WENT OUT TO GATHER INFORMATION. These assessments will give higher clarity and much more detailed understanding of what occurred at each of these landslides. So understanding those risks and the hazards for the communities that may still exist, or at least understanding what led to these landslides. And then of course identification of potential mitigation efforts. There isn't always going to be a mitigation solution. However, if we identify it as part of the development of this project, and then designing those engineering solutions for A&E as well. Speaking specifically about Guerin Creek, this is one of two landslides where we had lives lost. Obviously our Grovemont landslide, which we did in December, and then for this landslide we had 13 lives lost. The scope and size of this landslide at this time, our understanding is eight predominant slide areas. I will note though that for the Grovemont landslide, we indicated nine. Whenever we did our initial development, the contractors identified 18 initiation zones. So that assessment has actually generated better clarity on where each of those landslides started. The total length of those eight slides is 26,670 feet, approximately five miles long. This is our longest slide that we have in Buncombe County. And to put it into scope, the total cumulative area that was disturbed by this landslide was 351,825 square yards. That is about 72 acres of land from the slide. So a very large project, very impactful to the community as well. The project scope, and once again we look at this from that A&E perspective, which is phase one. Okay. We'll incorporate site evaluations, hazard modeling, quite a bit of field reconnaissance, and then of course identifying those potential mitigation solutions and what that turnkey solution would equate to if we did have a phase two that could then be submitted to our federal partners and state partners for review. Phase two right now is an unfunded project and will be dependent on the outcome of phase one. Estimated costs for phase one include multiple tasks. Each of these six tasks have different components to it. Obviously, we will see heavier lift in some components, which will be our LIDAR mapping and surveying. This also incorporates a contingency included for the contractor. This number may fluctuate. This is the highest end that they've projected for the contract. The same goes with 1F for engineering designs. There's $370,000 incorporated into this number for contingency costs as well. Total cost is not to exceed 1.8 million for this project. For reference, the FEMA obligation for this project that we received, the 90% funding from federal, 10% from the state, is over $5 million. As a large project, we get paid on actuals, so the $5 million isn't as relevant to the 1.8 as what we're looking at for this project.