Design Review Committee Meeting Recap: October 15, 2026
The City of Asheville Design Review Committee met on October 15, 2026, to conduct formal and informal reviews of several development projects. The committee began by approving the minutes from its previous meeting on September 17, 2026. The agenda included formal reviews for the Drury Biltmore Station Hotel, the Buncombe County Emergency Services Station, and the Hellbender Venue, as well as an informal review for a multi-family development on Swannanoa River Road.
Key Decisions
The committee took action on three projects, with all votes passing 5-0. First, the committee approved the minutes from the September 17, 2026 meeting. Second, the committee approved the Hellbender Venue at 155 Thompson Street (Level I) with the condition that staff continue to actively monitor pedestrian and vehicular traffic and noise ordinance compliance. Third, the committee approved the Buncombe County Emergency Services Station at 40 McCormick Place (Level I) without additional conditions.
The most significant decision of the meeting was the approval of the Drury Biltmore Station Hotel at 2 Hendersonville Road (Level III), a new 8-story, 210-room hotel. The committee approved the project with seven specific conditions requiring the applicant to:
- Pursue alignment with the greenway master plan design.
- Increase and incorporate sidewalk connectivity from Thompson Street to Hendersonville Road and through Biltmore Village.
- Review building placement in relation to Hendersonville Road, Thompson Street, and the proposed Phase 2 one-story building to better incorporate it into a walkable, campus/village plan.
- Review site, civil, and landscape design to incorporate programmable, activated open space.
- Provide hardscape design above and beyond sidewalk requirements, including street trees and tree grates.
- Provide landscaping and plantings above and beyond base requirements.
- Incorporate innovative, sustainable best practices for green stormwater design as much as is practicable.
Discussion Highlights
During the review of the Drury Biltmore Station Hotel, Chair Bryan Moffitt noted staff findings of partial or non-alignment with guidelines regarding architectural character, facade materials, and open space. Eddie Dewey, a committee member, stated he had managed leases for the project since 2004 but confirmed with staff that he has no current conflict of interest and can make an impartial decision. Gabriel Delerme questioned the building’s scale, noting the 8-story structure appears monolithic against the corner, and suggested pushing the building back to create a better transition. Joe Balcken asked about the applicant’s experience operating in floodplains and whether the restaurant would be open to the community.
For the Swannanoa River Road at Britt Drive Multi-Family project (Level III), the committee conducted an informal review only; no vote was taken. Chair Bryan Moffitt expressed a policy preference against residential development in flood hazard areas following Hurricane Helene and recommended providing an emergency egress route for the southwest pod other than Swannanoa River Road. He also advised the applicant to work with staff to exceed current regulatory requirements for design flood elevation and to use architectural differentiation to avoid a generic look. Gabriel Delerme encouraged the programming of flat open spaces, such as a dog park or paths along the stream, rather than leaving them as unprogrammed slivers. Joe Balcken raised concerns about the community’s lack of flood preparedness infrastructure compared to coastal cities and asked how the design addresses resident safety and evacuation.
Community Input
One public commenter spoke during the review of the Drury Biltmore Station Hotel, stating that the size and location of the project are not appropriate for Biltmore Village. The commenter noted that the building will "stick out like a sore thumb" and that stormwater runoff will impact businesses to the south. No public comment was recorded for the other agenda items.
Follow-ups
Staff agreed to continue to actively monitor pedestrian/vehicular traffic and noise ordinance compliance for the Hellbender Venue. For the Swannanoa River Road project, staff indicated the applicant is planning to return at the November 19, 2026 meeting for formal review. The applicant stated they will work on addressing flood responses and architectural design feedback before that meeting. Chair Bryan Moffitt stated that materials showing changes made to address the committee's comments will be uploaded prior to the November meeting.
Impact
These decisions affect the development landscape in two key areas of Asheville. The approval of the Drury Biltmore Station Hotel with conditions aims to integrate a large hotel project into the Biltmore Village neighborhood by requiring improved walkability, greenway alignment, and stormwater management. The informal review of the Swannanoa River Road multi-family project highlights ongoing community concerns regarding flood safety and architectural design in the River District, with the project set to return for formal review in November.