Skip to main content
Public HearingAPublic hearing

Built upon areas are designed and located to minimize stormwater runoff impact to the receiving waters, minimize concentrated stormwater flow, maximize the use of sheet flow through vegetated areas, and maximize the flow length through vegetated areas.

Board of Commissioners Meeting · February 19, 2024 at 5:00 PM

Built upon areas are designed and located to minimize stormwater runoff impact to the receiving waters, minimize concentrated stormwater flow, maximize the use of sheet flow through vegetated areas, and maximize the flow length through vegetated areas.

Get More From Sunshine Meetings

Bookmarks Notifications Saved Searches