Skip to main content
Consent Agenda ItemsB

Approval Bid Award-Clock Tower Foundation Project; The Clock Tower Foundation design was let for bid informally on August 11, 2026, with a closing date of August 28, 2026, at 10:00 am. One bid was received. Therefore, the bid was rejected, and the project was re-advertised on August 28, 2026, bid informally with a closing date of September 11, 2026, at 10:00 am. Following the review of bids submitted, staff recommends awarding the Clock Tower Foundation Project to G&M Structures LLC for the lump sum of $91,837.00. G&M Structures LLC is the lowest, responsive, responsible bidder, is appropriately licensed, and is adequately equipped to perform work of this nature, as submitted.

City Council Meeting · September 15, 2026 at 6:00 PM

In the spring of 2024, the City of Lenoir, utilizing both city funds and private donations, contracted with Mattern & Craig Engineers under Task Order #10 to provide engineering assistance for the Time Well Spent Clock Tower Project. The firm was tasked with providing Survey, Civil Site Design and Structural design based on Conceptual and CAD renderings provided by the Western North Carolina Sculpture Center. The Clock Tower Structural plans were completed in February 2025 and the Western North Carolina Sculpture Center began tower fabrication shortly thereafter, which wrapped up in the summer of 2026. The Clock Tower Foundation design was completed in July 2026 and was let for bid informally on August 11, 2026, with a closing date of August 28, 2026, at 10:00 am. One bid was received. Therefore, the bid was rejected, and the project was re-advertised on August 28, 2026, informally with a closing date of September 11, 2026, at 10:00am. Revisions were made in Section 3.03 Liquidated Damages, Item 1. Substantial Completion of the original Draft Contract/Agreement adjusting $500 for each day to $250 each day prior to re-advertisement. This bid includes the removal of existing concrete, installation of precast or cast in place concrete foundation structures, clearing and grubbing of the area, which includes some minor grading, relocation of two pull boxes as well as forming and pouring new concrete sidewalks. Two bids were received on September 11, 2026, one from G&M Structures LLC and the other from High Country Concrete LLC. The bid submitted by High Country Concrete Services LLC was rejected due to an incomplete bid packet and no proof of licensure in North Carolina. Staff received the following bids: G&M Structures LLC Lump Sum: $91,837.00 - Complete Bid High Country Concrete Services LLC Lump Sum: $49,500.00 - Incomplete Bid Attachments: Bid Advertisement, Bid form, Draft Contract, Bidding Set, Rebid Form, Revised Draft Contract, Bid Selection, Letter of Recommendation

Documents

Get More From Sunshine Meetings

Bookmarks Notifications Saved Searches