Discussion
Stormwater Infrastructure Recommendations
Planning Commission Meeting · April 22, 2024 at 6:00 PM
The applicant is to implement the recommendations made by the engineer who inspected the existing stormwater infrastructure, namely: remove the debris from Drop Inlet/Junction Box #2 and extend the inlet of Drop Inlet/Junction Box #3 to the ground surface and provide a manhole ring and cover for access.