Skip to main content
Presentation

Rivers Park Trail Construction Project

Historic Preservation Commission Meeting · June 10, 2025 at 3:00 PM

The project is located in the most densely populated area of the High Country and is adjacent or very close to the following: Appalachian State University (ASU), numerous outdoor gear shops, restaurants and bars, two places of worship, the ASU Child Development Center. This trail will be the southern terminus of the Northern Peaks State Trail. Proposed Work: 404 feet of USFS Class 5 Trail, built with Recycled Concrete Surfacing; approximately 4,382 feet of USFS Class 3 Natural Surface Trail throughout R.L. Clay House Property; 128 feet of stone steps located near State Champion Sugar Maple Tree, Baby; Trailhead Signage and Wayfinding Signage. Design Standards References: Appendix D: Downtown Boone Local Historic District Design Standards And Handbook. Includes construction documents, location maps, slope maps, and trail specifications.

Get More From Sunshine Meetings

Bookmarks Notifications Saved Searches