P8 Project Submittals

MPO Governing Board (Aug 21, 2025) · August 21, 2025 at 1:00 PM

Watch this item from 3:26

Recommendation of the Draft Submittal List for the Prioritization Process.

Decision

Passed

“Jim McAllister moved to approve a Draft List of P8 Project Submittals.”

Moved by
Jim McAllister

Documents

What was said

The TIF is a subset that every MPO is required to maintain. So every significantly significant transportation project is required to be reflected in the TIP. And very importantly, it is required to be physically constrained, which is a big driving force between a lot of the changes between the last TIP and the new one. I hope this helps explain really the utility of this document. In order for transportation funding to be accessed, especially federal transportation funding, those projects have to be reflected in the GIP from the MPO and the STIP from the MCDOT. If those documents are not in concert with each other, the federal government will not allow access to federal funds. So, just to reiterate, this is one of the more important policy documents at the NCO. This is part of the power given to NCOs where historically if there were projects that local governments significantly disagreed with NCDOT, this was document in which that disagreement actually has teeth. However, although federal funding covers a whole lot of transportation investments that we need in our state and our region, and making sure that we are in line with each other, that's a big part of the job here. So just a reminder, this document originally came out in January. There's been public comment period that post-NCDOT and the MPO. The Board of Transportation adopted the new SIP, the 2026-2035 SIP, in July. Every MPO is required to adopt their SIP or consider adoption of their SIP no later than September 30th. So just as a reminder, in general, a lot of what we're talking about with this dip and a lot of what we've dealt with is an increase in the cost of doing transportation projects. And so with this latest iteration, there's no new projects being funded in this dip. Many of the existing projects are being delayed and several projects have been decommitted or defunded. And a lot of that has to do with the inflation that hit the construction industry after 2021. So I won't go through all of this, but just as a reminder, when going through and determining what projects would be delayed or decommitted, and CDOT looked at a number of criteria, one of them to note was a ranking of existing projects passed by this board last year. So these weren't decisions made just in a black box at MCDOC. This board, our member government, played a role in terms of ranking those projects and helping to determine which ones would remain and which ones would not. But with the extent of the cost increases, again, we're looking at a number of projects being being admitted. Ross Avenue in Haywood County, the one that's not currently under construction. South Main Street, which we know is a major priority, and the intersection improvement at 276 and Crimes Cove. In Buncombe County, Swanninoa River Road, San Francisco Sardis Road, widening, Sweet Creek Road widening, the last remaining section that we attempted to keep on the schedule over over the past couple of years and a10 which was the plant widening of future 26 and in henderson county the committing of the interchange at i-26 and bullsees boulevard to know there's still a number of projects and treatment projects on the books some of those have been delayed in part due to cash flow considerations again due to those cost increases and but i won't go through all of those because i have a few times now um but just as a reminder there's besides those major improvement projects that have been funded through the prioritization process. If you've gone through the drafts, TIP, there's a ton of projects in there. And so there are, the TIP also includes projects with direct attributable funds from the MPO. That includes projects like the Acoustic Trail, which is still wrapping up their first leg. Theer Creek Greenway, which is under development, the Natsby Branch Greenway, and the City of Asheville, Woodson-Weaverville, etc. Rage replacements are reflected in this document, transit funding, safety projects, and a number of other projects of regional significance. And so, you know, I wanted to note that as I know these presentations, I've been told there's been a whole lot of bad news, but I think it's important to remember that as part of this process to develop the TIP, We've made a number of hard, hard decisions about projects that have been on the books for a number of years, and we've done that so that we can have a digitally constrained EIP that helps move forward the projects that we can do for. And there are a whole lot of them reflected in this document. So, in terms of next steps, again, to make the 2026-2035 KIT and SIP official, the Board

Get More From Sunshine Meetings

Bookmarks Notifications Saved Searches