Water Infrastructure Recovery Update

Infrastructure Recovery Board (Hybrid) (Mar 3, 2026) · March 3, 2026 at 10:30 AM

Watch this item from 3:53

Discussion and Summary of City of Asheville Water Resources Recovery Projects presented by Bill Hart, Water Resources Director.

What was said

updates and reports our first speaker is bill hart water resources director he'll be giving us an update on water infrastructure recovery welcome bill i would like to just say to our our board THAT WE HAVE ONLY A 10-MINUTE TIME SLOT AND SO THE Q&A WILL BE LIMITED IN THIS CASE BUT WE WELCOME BILL BACK FOR FUTURE MEETINGS AND UPDATES THANK YOU BILL I APPRECIATE THE OPPORTUNITY TO COME AND SPEAK TO YOU TODAY I'M GOING TO DO BE I'M GOING TO BE DOING a high-level flyover so i'm going to go quick through this there will be question time at the end and anyway i will come back at any time that i'm requested i'm here today to talk to you about some of the recovery projects that we've got going on and we have seven in total the first of those is the north fork transmission main number three and i'm going to cover them here and then i'm going to break into each one the next are going to be treatment improvements at both the north fork and the williams rural water treatment plants we're doing dam and spillway restoration at north fork and bee tree and we're doing debris removal in the north fork and bee tree watersheds so the north fork transmission main number three the idea behind this is to provide another form or way to get water from the North Fork plant into our distribution system. It's going to extend from the North Fork water treatment plant to Bee Tree Road, which we call Bee Tree Junction, and it's going to connect into the system there. This is going to take advantage of some existing easements, but it'll also require some additional easements, and this line's going to go overland. The main point here is we're going to avoid flood-prone areas to make sure that we have resilience and we always have the ability to put water into our system. Currently, we have a Dura under contract, and the design contract for this project is a large one. It's a little over $10 million. Estimated cost of the project is going to be around $125 million. We're working on project funding right now through FEMA and the HMGP. This is a picture of where our bypass line went under the river. And if you look at this, and probably a lot of you have already seen this, originally this was five feet under the bed of the river. After the flooding, this is kind of what we were left with. This is what we want to avoid in our future. This is just kind of a high-level look at the way that line may look. This is not a guarantee. This is just kind of a high-level view in an estimated area. So for the treatment projects, at North Fork, we're going to be installing plate settlers for sedimentation. North Fork and Bee Tree are known as direct filtration plants, and they're the only two direct filtration plants in the state of North Carolina. The reality of direct filtration is we rely on our reservoirs to have really pristine quality of water. During the hurricane, that water quality was really, it was affected in a great way.

Get More From Sunshine Meetings

Bookmarks Notifications Saved Searches