The City of Asheville Board of Adjustment held a regular meeting on April 27, 2026. The primary agenda items included the approval of minutes from the previous regular meeting and a public hearing regarding a variance request for a property in Biltmore Village.

Key Decisions The Board voted to approve the minutes and findings of fact and conclusions and law from the March 23, 2026, regular meeting, with a vote of 5-0. Additionally, the Board voted to approve the variance request for the property at 6 Boston Way, subject to specific conditions outlined by staff. This vote also passed with a tally of 5-0.

Discussion Highlights Chair Suzanne Godsey opened the meeting by outlining the Board’s quasi-judicial role and its authority under North Carolina General Statutes and the City’s Unified Development Ordinance (UDO). She emphasized that decisions must be based on presented evidence and adherence to specific legal procedures.

The main discussion focused on a flood variance request from Mark Bidwell for the property at 6 Boston Way. Marie Taylor, the Stormwater Plans Reviewer for the City of Asheville, presented the case, explaining that the request aims to allow repairs to a historic structure without fully complying with all flood protection standards. Taylor noted that current repair costs are nearing the 50% threshold that typically triggers full flood compliance requirements, a challenge often faced by historic buildings. She highlighted that the property is currently being renovated to house LKN Cheesecakery and drew similarities to a previous case involving historic preservation within flood zones.

Follow-ups City staff explicitly stated they will continue to track the substantial improvement percentage as further renovations occur at 6 Boston Way. The applicant is required to comply with several conditions, including elevating electrical systems to two feet above the base flood elevation (or the maximum extent practical if historic standards prevent full compliance), using interior flood-resistant materials to two feet above the base flood elevation, providing a detailed floor plan documenting these materials, and installing a sewer backwater preventer if not already in place.

Impact This decision allows for the continued renovation of a historic building in Biltmore Village while balancing flood protection requirements with the preservation of the structure's historical character. The approval ensures that necessary repairs can proceed without triggering the full scope of flood hazard reduction standards that would otherwise apply once the 50% substantial improvement threshold is met.