Skip to main content
Biltmore Village1Public hearing

30 Lodge Street (PIN 2648607352) - Demolition of non-original enclosed entryways on front elevation, installation of new doors, new mechanical equipment and repainting. Applicant: Chris Renno

Historic Resources Commission (In-Person) (May 13, 2026) · May 13, 2026 at 4:00 PM

Watch this item from 55:49

Demolition of non-original enclosed entryways on front elevation, installation of new doors, new mechanical equipment and repainting. Materials: Staff Report and Project Materials

Documents

What was said

We're going to go down to Biltmore Village for a little bit. So this project is at 30 Lodge Street, which is the historic train depot that thankfully was purchased by a new owner who is going to restore the building. Hooray. And so I'm just going to walk you through the scope of work. Just as an FYI, there were a handful of things that were approved via minor work, like some minor exterior repairs. And of course, the siding needs to be repainted. So just FYI on that, that was noted in the cover sheet in their plan set. So just wanted to note to you all that those were items that we had already approved. All right. Just some photos. So kind of like one of the primary things here is if you've been to the village wayside in years past, there are these two glass vestibules that were built on either side of the port cocher. The port cocher was enclosed at some point with the brick knee wall on the sides and glass. So in the picture on the right, you can see the interior of one of the vestibules, the vestibule to the left of the port cocher. So all the original brackets are in there. It's pretty awesome. So they're actually going to remove the vestibules from the building. And so all of those beautiful brackets will be visible again. So that's very exciting part of this project. This is existing and proposed elevation drawings. As you can see, they're installing two new wood doors on the front of the building that will match. There is an existing historic door that is inside the building right now, and the new doors will match from that existing door, those half light doors on the front. They are also on the front elevation. I'm going to get this wrong because there's a lot of things happening with this project, but I believe so like the other thing is they're going to change the glass in the port cocher and then they're going to take out the leaded glass. It's not original to the building that's on the port cocher. And this is a section drawing so you can see kind of like what's happening within the space once the like existing with the vestibules there. As you can see, there's a window on the left that will go away for the door as that was an original entry door. So they had like a men's and women's side to the to the station. So this is side elevations. There's nothing happening in terms of the the south side, but you can obviously see the side view there. The main thing to note on these drawings is the is the new door that's shown on the north end of the building. That's a little there's a little shed addition there. I don't know when that addition was constructed, but they're proposing a new metal entry door there and they're also need to replace their mechanical equipment. So you'll see that platform that's on the back side with the unit on top of it. I think it's about 10 feet tall and we did receive screening information for the unit, which is required by the standards. And then a little bit hard to see without me zooming in on this plan, but on the bottom right that north elevation, you can see that there. So like when you're in the port co share now there's basically like interior doors that open up on either side into those glass vestibules. And so they've got to replace that to make them more functional exterior doorways. So if you looked at the materials document, it's got the door schedule in there. And so they are proposing like a aluminum storefront type entry door. So there's a full light glass door with a full light transom and full light transom and a side light. So my note in my comments is just that I think that there's probably more appropriate materials for those doors, especially on the well, I think all three of them. Really, I don't think are consistent with the character of the building. So that's my main concern. I did also note that I asked the applicant for a couple of additional things.

Get More From Sunshine Meetings

Bookmarks Notifications Saved Searches