Skip to main content
Zoning Map Amendments2Public hearing

A request to amend a conditional zoning located at 21 London Road (PIN 9647-89-2135). The property owner is London Asheville, LLC, and the project contact is Warren Sugg, P.E.

Planning and Zoning Commission (In-Person) (Oct 7, 2026) · October 7, 2026 at 5:00 PM

Watch this item from 2:22:15

A request to amend a conditional zoning located at 21 London Road (PIN 9647-89-2135).

Documents

What was said

DO WE WANT TO REVISIT THE RESILIENCE FLOOD ISSUES? I THINK THERE WERE SOME GOOD QUESTIONS BROUGHT UP THERE. YEAH, I'D LIKE TO JUST REVISIT THAT IN OUR DELIBERATIONS HERE. DO WE NEED MR. SWORDS FOR THAT OR IS THIS KIND OF -- NO. MR. SWORDS, YOU ARE EXCUSED. THANK YOU. I would have liked to hear the applicant speak to resilience measures taken between the two. The fact that it seemed like it was almost a non-consideration to me. between the design pre-storm and design after storm and and what i would hope for moving forward um is that you know i think what i would like to believe is that it was just a lapse of of, you know, in that, you know, now that it's been brought up, that some actions might be taken. And so another thing, in addition to the flood map, I would recommend looking at the stability, the soil stability index. The slope on the west side of London is susceptible to failure. Yeah, on the west side of London. So the left, Page Left, is susceptible to failure. And so if we're having flooding on the right or on the north and the right, and then we're asking people to leave onto London on the left, and we have a landslide on that side, are we blocking them in? I would like those considerations, I would like a deep dive into resilience planning when moving forward with this project. I'd be willing to move forward with a recommendation for this project. Thinking about... Consider giving giving a recommendation, voting for the project, giving a recommendation, strong recommendation. That an emergency management plan. Get him put into place for post occupancy. considering a variety of threats in this area. I know fire was mentioned, flood, landslide potential. And I would also strongly recommend that during design, in addition to emergency management plan, that the design moving forward between now and final TRC strongly consider Those conditions above a one foot base flood elevation plus one base foot elevation. Think about flood elevations at the 500 year level. So more considering base flood plus 4 when thinking about what spaces could potentially be underwater, and where could people navigate? I think if the applicant is serious about these resilience measures and really anticipating what we hope is the worst case scenario, then I can get behind because we do need housing. I just want everyone that has the housing to be safe.

Get More From Sunshine Meetings

Bookmarks Notifications Saved Searches