Azalea Park Riverfront Parks Recovery Projects - Concepts Introduced

Infrastructure Recovery Board (Hybrid) (Mar 3, 2026) · March 3, 2026 at 10:30 AM

Watch this item from 16:17

Discussion on factors design professionals must consider when creating a single recommended design concept for each park that integrates features and amenities from all three themes, presented by Olin Consultants.

What was said

item five unfinished business and we're going to start with our with olum consultants giving us a description of azalea park riverfront parks recovery projects introducing concepts and i'd like for all of our board members to when we're listening and i'm sure some of you have been reflecting on this already what we're trying to report to city council is what factors must the design professionals consider when creating a single recommended design concept for each park that integrates features and amenities from all of the the concepts they've developed so let's just keep that in mind as we listen and uh mr mike miller from all right thank you can everybody hear me okay yeah mine too excellent um well thank you all for taking the time today i had a chance to meet a bunch of you at the public meeting on Saturday, also the focus groups yesterday, but really looking forward to hearing more of your feedback and perspectives. First, a quick word about schedule. So our team got started last September, spent our fall in the process of discovery, research, and analysis, culminating in the public engagement and public meeting last December. Since then, we've been working on the preliminary concept alternatives that many of you have seen that we've been presenting this week. We'll also be presenting to council on the 24th, and then moving towards a preferred alternative, we'll be back here in June for more public engagement, and then phases of technical design and documentation taking it through 60% design by early 2027. I was instructed to keep things brief and high level, but if I could share just one map with you from that research and analysis process, it would be this one because I think it says a lot about this site and about what it suffered during Helene. So you'll probably know this very well, but the Swannanoa is an incredibly steep and mountainous watershed. You've got about 4,000 feet of drop within the watershed. The main stem drops almost 450 feet, 18 feet within the project site and about 80 percent of that watershed is upstream of azalea park so it's this big funnel coming down on the park and what does that mean a couple of things so foreshadowing the bridge and dam conversation which is coming later it means that while what we do on this site can have an impact on downstream flooding it is not going to be the solution for downstream flooding this is a watershed scale issue that we're faced with here um it also means of course the site like many places on both rivers just really got hammered during Helene. So of course the JBL soccer fields which have flooded many many times but also buildings like Mamatiz facilities like the pool and playground that were located on high ground and in fact out of the flood plain. You know every time I go to the site doesn't matter how many times I've seen it that bridge and dam it's just like a punch in the gut. It was truly incredible not just water levels but water velocities that the site was faced with and that we need to be thinking about when we design moving forward. So a lot of what we've been doing is pulling together everything we know so far about the priorities through public feedback. So starting with the IRB with all of you, also looking at previous plans, Recreate Asheville for guidance on programming, and then that phase one round of engagement that we did. So from the IRB flood resilience as a design standard being number one, thinking about pedestrian safety and multimodal access and not just the park but the connections beyond, alternative sports, lifestyle activities, and nature first trails. From Recreate Asheville, these were some of the top facilities amenities, top programs, activities. And so we're looking here as the public engagement on new things we might add to the park but everything highlighted in green was actually already present at azalea park so again just underscoring for us that recovery is really job one here then from the public engagement these are some of the top themes that we heard and again i think very consistent with what you all prioritize so integrating flood resiliency ecological restoration and recreation restoring those previous amenities but then maybe adding in some new recreational amenities as well and And we think there is definitely space for that at Azalea. Prioritizing connectivity and safety, and then also thinking about nature education and partnerships. You know, the Western North Carolina Nature Center being right there is a huge asset and opportunity for the park.

Get More From Sunshine Meetings

Bookmarks Notifications Saved Searches