Skip to main content
UNFINISHED BUSINESSDiscussion

French Broad Riverfront Parks Recovery Projects - Concepts Introduced

Infrastructure Recovery Board (Hybrid) (Mar 3, 2026) · March 3, 2026 at 10:30 AM

Watch this item from 49:02

Discussion on factors design professionals must consider when creating a single recommended design concept for each park that integrates features and amenities from all three themes, presented by Sasaki Consultants.

What was said

and Sasaki Consultants. And we don't have your name on the agenda, so if you could introduce yourself, we'd appreciate it. My last name is very confusing, so it'd be hard anyways. I'm Anna Kors. I'm a Landscape Architect Principal and Principal in Charge from the Sasaki team. I also have Caroline Lindequest here with us, a landscape designer. So very honored to be here and thank you for your time. It's so great to see so many of you again. I'm not getting tired of you yet, Joe, I promise. So we're going to go through a similar presentation as Olin did, really focused on the French Broad River Front Parks. Before I dive in, I really want to start with this beautiful quote from the community member that this river is the heart and soul of Asheville. She floods. She's dirty. She needs the love and the support and the resilience we can give her so she can be whole again. This has really been our guiding star as we think about the design and we think about this project moving forward and into the process. So our overall schedule, we started in August. And so six months, we've really been doing a lot of inventory, inspection, understanding the park system, moving into our first engagement and then having our last engagement being Saturday and then a series of focus groups yesterday. And then moving forward, very similar schedule to Olin with June coming back with an engagement event, looking at our final concept, and then moving into documentation. So our first community engagement had some really, really great information. We were able to reach out to over 2,300 respondents for our survey, had over 200 people at the open house and four focus groups and a series of pop-ups that really gave us some insight into what the community wanted here at the French Broad River Park System. So we were able to understand what were some of the favorite existing programs that were here before, walking, cycling, the greenways, the dog park, picnics, playgrounds, were kind of the top six. And then we were able to ask the question, what are some potential programs that might be missing that would really help fill out this park system? So looking at trail programs, water programs, play, sports, art, and not just asking what type of program, what is the look and feel people want that really would resonate with them here in the French Broad River? A couple of those key themes that came out is that connectivity as essential infrastructure. I love that. Long, continuous, car-free paths. I'm doing that shout-out for you, Marty, with your hat. I love that. That we want to think about intergenerational spaces. How do you come here with families? And then ecology, conservation, education. Again, these amazing, amazing quotes that really have been design drivers for us. That we need safe, calm spaces. We want to restore nature. A place that you're proud of. And I love this one. That we feel the park is part of us. This is part of who we are here in Asheville. So this also led to our analysis. And when we do our analysis, we want to look at all the work that has been done before. So looking at Recreate Asheville, what are some of those gaps that we can see in the park system? I'm doing a lot of analysis with what was here prior to Hleen and then after. And then starting to dive into a lot of what we need to do for the FEMA-related documentation and mitigation planning. This is also tied to lots and lots of visits, being on the ground, walking the riverfront, but also being in the water. doing that detailed analysis. And my colleague Caroline mentioned it was really kind of an emotional moment because we were here on the anniversary, the one-year anniversary of Helene. So really taking that in, understanding the site and how it's kind of recovered since then. So all of that information led to a series of diagrams and documents that really looked at cross-sections of the river, looked at connectivity prior to Helene, kind of post-Helene, understanding the history of the site, how do we want to bring that back in education? And then really led us to

Get More From Sunshine Meetings

Bookmarks Notifications Saved Searches