Replacement of Metropolitan Sewerage District’s Carrier Bridge Pump Station
City Council Meeting (Apr 8, 2025) · April 8, 2025 at 12:00 PM
Documents
- Presentations A - Carrier Bridge Pump Station.pdfReport · PDF · 17 pages
What was said
And we've got an MST team here. We're going to have Hunter Carson make this presentation. You all are welcome to come on up or sit or stand or however you wanna do it or just... - We'll put it in a second. - Okay, yes, if there are time. And I think we're doing 15 minutes, yes, on this one. We timed even our invited speakers, so. - Miles done. - So you're welcome, so welcome. All right, thank you very much. - Okay, thank you all for having me. I'm Hunter Carson, the Director of Engineering at Metropolitan Sewers District here today to talk about the Carrier Bridge Pump Station replacement project. It does impact you all because this project will be constructed through two city parks, and then the pump station itself will be constructed adjacent to the French Broad River Park. So a little bit of background about the project and the pump station. Carrier Bridge Pump Station is our largest sewer pump station in the collection system. It services approximately half of our entire collection system service area. And that's what the picture on the right shows you. All the highlighted area is portions of the collection system that are served by Carrier Bridge Pump Station. So as you can see, everything, very large portions of South Buncombe, West Buncombe, and even North Henderson County are serviced by this pump station. So that said, the reliable operation and proper sizing of this replacement is critical to this pump station. It is an old station currently that's being replaced. It's about 60 years old now. and it will be increased capacity-wise from 22 million gallons per day to a peak flow capacity of 40 million gallons per day and so that's based on a 2070 flow projection. So this is an aerial image taken a couple weeks ago. You can see the French Broad River Park which is close to the the confluence of the Swannanoa and French Broad Rivers. We do have an existing Carrier Bridge pump station which you can see in the foreground there sort of sits up on a hill just over the French Broad River Park and then the new the site of the new pump station will be just to the north of that that's a parcel that MSD purchased from Duke Energy about four or five years ago specifically for this project. Can I just interject so point of reference so to the top of this frame would be where our old dog park was correct well old just as of helene yeah um and the site where you have a highlighted i was just walking there sunday and several trees would have been removed and i and i think you know we heard some feedback in the community a lot of confusion about why trees are being removed thus you're here tonight to talk to us about this project to sort of clear up some of that information thank you yeah so the highlighted portion um as you saw on your walk has been cleared and that is the location for the the pump station itself a few other slides later in the deck will show some of the clearing that was done by MSD I think it was relatively minimal compared to the the clearing that took place by the Army Corps but I will show those photos so just a high level scope of work for this project again a 40 million gallon per day wastewater pump station. It'll have complete odor control system. So those are the two cylindrical units in the back of the station there. Those would be carbon scrubbers. This is a very deep station. It'll be a very large excavation adjacent to the French Broad River Park, about 70 feet deep. The station itself will have a footprint of about 100 feet long, about 40 feet wide, a couple retaining walls, and then there will also be some piping associated with this project, both on the inlet side and the outlet side or the discharge side of the pump station.