Skip to main content

Planning & Design Review Committee of AARRC

March 5, 2021 at 12:00 PM

  • 42 minlength

Event Recap

Sunshine AI summary of the meeting video and documents. How we make these pages

Meeting Overview On March 5, 2021, the Planning & Design Review Committee of the Asheville Riverfront Commission (AARRC) convened to review a proposal for a new three-story mixed-use building at 57 Robert Street in the River Arts District. The applicant, Thomas Cizek of Ruger Riley Architects, presented the design on behalf of local clients. The project includes a ground-floor art gallery and three residential units, featuring brick veneer, painted concrete block, and black steel elements intended to match the neighborhood’s industrial character.

Key Decisions The committee voted to approve the project design. The motion was moved by one member and seconded by another, passing unanimously with three ayes and zero nays. However, staff clarified that this approval is an advisory pre-review step. Because the applicant has not yet filed formal Level 1 permits, the project must still go before the newly forming Design Review Committee—a separate body being established from the Riverfront and Downtown Commissions—for the official vote required by the Unified Development Ordinance before a zoning permit can be issued.

Discussion Highlights During the review, staff raised concerns regarding accessibility and sidewalk width, specifically noting that door swings must not encroach on the required sidewalk space. Staff member Shannon advised the applicant to consult with Level 1 review staff regarding the accessible entrance, recommending a vestibule to avoid slope issues. Chair Jane Matthews inquired about the color of the steel porch and roof elements; the architect responded that the clients were looking for a "galvalume look" using natural materials rather than bright colors. Additionally, a committee member noted that while the proposal includes 50 feet of sidewalk, the broader section of Roberts Street still lacks adequate pedestrian pathways.

Follow-ups The applicant agreed to reach out to Development Services staff regarding the sidewalk and door swing issues before finalizing the drawings, with a goal of finishing permit drawings by the end of March. Staff member Rachel Wood explained that the project will move to the new Design Review Committee once permits are submitted. She noted that Council is expected to appoint members to this new committee in April, with the first official business meeting tentatively targeted for May 18, 2021.

Impact This meeting serves as a preliminary endorsement of the design for the 57 Robert Street project, but it does not grant final approval. The project remains pending until it undergoes the official review process with the newly established Design Review Committee. Residents should note that the timeline for the project is tied to the date the formal application is submitted, which will trigger the new statutory process requirements.

Loading what was decided…

Meeting Video & Transcript

Loading video…
Loading the agenda…

Get More From Sunshine Meetings

Bookmarks Notifications Saved Searches